event-trade登录编辑
Federal Register Public Inspection — Federal Energy Regulatory CommissionDoubao · 实盘不做把握 9/10不做原因:标的无直接敞口
北京时间·🕒 发布 20:45:00(美东 08:45)·⟳ 抓取 20:45:30·⚡ 决策 10-14 20:50:40 +5m10s·12.9 天前

FERC公示Tennessee Gas Pipeline一项零成本降压申请:1.9英里支线MAOP由1440降至750 psig,无施工

这是FERC总括授权程序下的常规运营性公示:零成本、无施工、不改变输气量、费率或收入,异议期机制下大概率自动生效;唯一相关上市主体Kinder Morgan体量巨大,该事项无任何可量化的财务或估值影响,不具备事件交易edge,亦无受损方或二阶受益链。

📄 原文Federal Register Public Inspection — Federal Energy Regulatory Commission↗ 原文
[Notice] Request under Blanket Authorization: Tennessee Gas Pipeline Co., LLC
BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP27-2-000] Tennessee Gas…
不做 Kinder Morgan, Inc.(KMI.US)
子公司TGP的申请为零成本、无施工的1.9英里支线运行压力调整,属总括授权下常规程序性事项,无收入、费率、capex或现金流影响,相对KMI市值完全不具materiality,无事件交易edge
展开详情(成交明细 / 研究档案 / 原文全文 / 决策记录链)

研究档案

结论摘要

TGP申请将一条1.9英里支线降压至与主干线一致以减少维护,项目成本0美元且无施工,属FERC常规程序性公示;对母公司Kinder Morgan无实质财务影响,无交易标的与方向,回避。

🔎 新鲜度:最早出现 2026-10-14 · 扩散 low · price-in 风险 low ↗

主要风险

  • 该通知本身不含任何财务增量;即使未来出现第三方异议(截止2026-12-08),也仅涉及1.9英里支线运维参数,不改变本判断

先例如何影响了这次决策

对本次决策的影响:未因先例调整任何标的或仓位——直接以NO_CAUSAL_EXPOSURE回避

方向:无可对照先例,亦无必要:此类零成本总括授权prior notice不构成价格事件

涨幅量级:无高相似对齐先例;事件本身materiality为零,先例不会改变结论

形态:不适用

工具执行结果 · 成功 1 · 降级 0 · 失败 0 · 取消 0
  1. search_processed_events 成功 stock_tools HTTP · 9 ms
    {"result": "search_processed_events:agent query=`tennessee gas pipeline line 20m-100 cypress field maop reduction ferc cp27-2 | tgp blanket authorization reduce maximum allowable operating pressure 1440 to 750 psig harris county`;结构化索引覆盖完整 72 小时;旧记录兼容扫描近 0.0/72 小时、0 条本臂决策(完整),返回 0 条候选。未命中只表示这些 agent

原文全文

展开原文 · 10,101 字
BILLING CODE 6717-01-P
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP27-2-000]
Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on October 1, 2026, Tennessee Pipeline Company, L.L.C. (TGP),
1001 Louisiana Street, Houston, Texas 77002, filed in the above referenced docket, a
prior notice request pursuant to sections 157.205 and 157.208(f)(2) of the Commission’s
regulations under the Natural Gas Act (NGA), and TGP’s blanket certificate issued in
Docket No. CP82-413-000, for authorization to reduce the maximum allowable operating
pressure (MAOP) of Line 20M-100 from 1,440 pounds per square inch gauge (psig) to
750 psig, referred to as the Line 20M-100 Cypress Field No. 2 Line MAOP Reduction
Project (Project). Line 20M-100 connects to and receives gas from TGP’s parallel
mainlines Line 100-1 and Line 100-3 and extends northward for approximately 1.9 miles
to a delivery point in Harris County, Texas, The Project will allow TGP to reduce the
MAOP of Line 20M-100 to the same operating pressure as its connected mainlines,
which will provide more operational efficiency by reducing future integrity management
and maintenance activities associated with Line 20M-100. The estimated cost for the
project is $0.0 as there is no construction involved, all as more fully set forth in the
request which is on file with the Commission and open to public inspection.

In addition to publishing the full text of this document in the Federal Register, the
Commission provides all interested persons an opportunity to view and/or print the

contents of this document via the Internet through the Commission’s Home Page
(http://www.ferc.gov). From the Commission’s Home Page on the Internet, this
information is available on eLibrary. The full text of this document is available on
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading.
To access this document in eLibrary, type the docket number excluding the last three
digits of this document in the docket number field.

User assistance is available for eLibrary and the Commission’s website during
normal business hours from FERC Online Support at (202) 502-6652 (toll free at 1-866208-3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at
(202) 502-8371, TTY (202) 502-8659. Email the Public Reference Room at
public.referenceroom@ferc.gov.

Any questions concerning this request should be directed to Tina S. Hardy,
Director, Regulatory, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street,
Suite 100, Houston, Texas 77002, by phone at (205) 325-3668, or by email at
tina_hardy@kindermorgan.com

PUBLIC PARTICIPATION

There are three ways to become involved in the Commission’s review of this
project: you can file a protest to the project, you can file a motion to intervene in the
proceeding, and you can file comments on the project. There is no fee or cost for filing
protests, motions to intervene, or comments. The deadline for filing protests, motions to

intervene, and comments is 5:00 pm Eastern Time on December 8, 2026. How to file
protests, motions to intervene, and comments is explained below.

For public inquiries and assistance with making filings such as interventions,
comments, or requests for rehearing, contact the Office of Public Participation (OPP) at
(202) 502-6595 or OPP@ferc.gov.

Protests

Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any
person2 or the Commission’s staff may file a protest to the request. If no protest is filed
within the time allowed or if a protest is filed and then withdrawn within 30 days after the
allowed time for filing a protest, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant request for
authorization will be considered by the Commission.

Protests must comply with the requirements specified in section 157.205(e) of the
Commission’s regulations,3 and must be submitted by the protest deadline, which is 5:00
pm Eastern Time on December 8, 2026. Filings that do not meet requirements of 18

1 18 CFR 157.205.
2 Persons include individuals, organizations, businesses, municipalities, and other

entities. 18 CFR 385.102(d).
3 18 CFR 157.205(e).

CFR 157.205(e)(2)4 will not be considered protests by the Commission.5 A protest may
also serve as a motion to intervene so long as the protestor states it also seeks to be an
intervenor.

Interventions

Any person has the option to file a motion to intervene in this proceeding. Only
intervenors have the right to request rehearing of Commission orders issued in this
proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit
Courts of Appeal.

To intervene, you must submit a motion to intervene to the Commission in
accordance with Rule 214 of the Commission’s Rules of Practice and Procedure6 and the
regulations under the NGA7 by the intervention deadline for the project, which is 5:00
pm Eastern Time on December 8, 2026. As described further in Rule 214, your motion
to intervene must state, to the extent known, your position regarding the proceeding, as
well as your interest in the proceeding. For an individual, this could include your status
as a landowner, ratepayer, resident of an impacted community, or recreationist. You do
not need to have property directly impacted by the project in order to intervene. For

4 18 CFR 157.205(e)(2).
5 Cheniere Creole Trail Pipeline, L.P., 195 FERC ¶ 61,208, at P 8 n.16 (2026).
6 18 CFR 385.214.
7 18 CFR 157.10.

more information about motions to intervene, refer to the FERC website at
https://www.ferc.gov/resources/guides/how-to/intervene.asp.

All timely, unopposed motions to intervene are automatically granted by operation
of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are
untimely and may be denied. Any late-filed motion to intervene must show good cause
for being late and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules
and Regulations. A person obtaining party status will be placed on the service list
maintained by the Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other parties.

Comments

Any person wishing to comment on the project may do so. The Commission
considers all comments received about the project in determining the appropriate action
to be taken. To ensure that your comments are timely and properly recorded, please
submit your comments on or before 5:00 pm Eastern Time on December 8, 2026. The
filing of a comment alone will not serve to make the filer a party to the proceeding.
To become a party, you must intervene in the proceeding.

How to File Protests, Interventions, and Comments

There are two ways to submit protests, motions to intervene, and comments. In
both instances, please reference the Project docket number CP27-2-000 in your
submission.

(1) You may file your protest, motion to intervene, and comments by using the
Commission’s eFiling feature, which is located on the Commission’s
website (www.ferc.gov) under the link to Documents and Filings. New
eFiling users must first create an account by clicking on “eRegister.” You
will be asked to select the type of filing you are making; first select
“General” and then select “Protest”, “Intervention”, or “Comment on a
Filing”; or 8

(2) You can file a paper copy of your submission by mailing it to the address
below. Your submission must reference the Project docket number CP272-000.

To file via USPS:
Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
888 First Street NE
Washington, DC 20426

8 Additionally, you may file your comments electronically by using the eComment

feature, which is located on the Commission’s website at www.ferc.gov under the link to
Documents and Filings. Using eComment is an easy method for interested persons to
submit brief, text-only comments on a project.

To file via any other method:
Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
12225 Wilkins Avenue
Rockville, Maryland 20852

The Commission encourages electronic filing of submissions (option 1 above) and
has eFiling staff available to assist you at (202) 502-8258 or
FercOnlineSupport@ferc.gov.

Protests and motions to intervene must be served on the applicant either by mail at:
Tina S. Hardy, Director, Regulatory, Tennessee Gas Pipeline Company, L.L.C., 1001
Louisiana Street, Suite 100, Houston, Texas 77002, or by email (with a link to the
document) at tina_hardy@kindermorgan.com. Any subsequent submissions by an
intervenor must be served on the applicant and all other parties to the proceeding.
Contact information for parties can be downloaded from the service list at the eService
link on FERC Online.

TRACKING THE PROCEEDING

Throughout the proceeding, additional information about the project will be
available from OPP at (202) 502-6595 or on the FERC website at www.ferc.gov using
the “eLibrary” link as described above. The eLibrary link also provides access to the

texts of all formal documents issued by the Commission, such as orders, notices, and
rulemakings.

In addition, the Commission offers a free service called eSubscription which
allows you to keep track of all formal issuances and submittals in specific dockets. This
can reduce the amount of time you spend researching proceedings by automatically
providing you with notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to www.ferc.gov/docsfiling/esubscription.asp.

(Authority: 18 CFR 2.1)

Dated: October 9, 2026.
Debbie-Anne A. Reese,
Secretary.

[FR Doc. 2026-21075 Filed: 10/14/2026 8:45 am; Publication Date: 10/15/2026]

决策记录链 · 只追加

每次领取产生一条记录,重新决策追加一条并以 supersedes 指向被替代的记录(ADR 0014)。

  1. 3617d198a9 · 2026-10-14 20:50 · doubao / doubao-seed-evolving-latest-version · 策略包 2226518bfdee当前