中电控股公布2026年首三季季度声明:香港售电量+2.5%、数据中心用电+12.8%,澳洲业务转弱,第三期息派0.63港元与去年持平

这是例行运营季度声明而非业绩公告:没有利润/派付率指引,第三期股息与去年持平(无正面惊喜),香港售电稳健与澳洲发电/零售走弱、内地电价下行方向相反,净方向MIXED;对超大市值、低波动公用股缺乏短线正期望催化。澳洲走弱仅为定性描述、无量化盈利下修,不满足做空红线,也不构成新增净损害风险信号。

📄 原文00002↗ 原文
Quarterly Statement 2026 (January – September)
Page 1 of 7 中電控股有限公司 CLP Holdings Limited (incorporated in Hong Kong with limited liability) (Stock Code: 00002) Hong K…
不做 中电控股有限公司(00002.HK)
常规运营季度声明且方向混合:香港售电/数据中心为正、澳洲EnergyAustralia量价与客户走弱、内地电价下行,第三期息0.63港元与去年持平无惊喜,文件不含盈利数字;对超大市值低波动公用蓝筹缺乏可交易预期差,做多无edge,做空亦无量化盈利下修等强催化,故不做。
展开详情(成交明细 / 研究档案 / 原文全文 / 决策记录链)

研究档案

结论摘要

中电控股首三季香港受经济与数据中心(+12.8%)拉动售电增2.5%,但澳洲EnergyAustralia电价、利润与客户数全面走弱、内地电价小降;股息持平、无盈利数字,方向混合且无预期差,对超大市值公用蓝筹不构成可交易事件,故回避。

🔎 新鲜度:最早出现 2026-10-12 · 扩散 low · price-in 风险 low ↗ ↗

消息传播链

  1. 2026-10-12首发HKEXnews / 中电控股公司IR一手源原文 ↗
    港交所披露易与公司投资者关系页面于2026年10月12日同日刊载《Quarterly Statement 2026 (January–September)》,为一手定时法定季度声明,宣派第三期中期息0.63港元与去年持平

关键理由

  • 香港数据中心售电+12.8%、北部都会区与Sand Hill Ridge数据中心集群(2027年中起分阶段投产)构成长期结构性增量,但属已知成长叙事而非本季新增订单
  • 澳洲EnergyAustralia发电毛利收窄、零售客户12个月减约5%并下调电价,是本声明最实质的边际负面,但未量化且公司已设转型办公室降本

主要风险

  • 若市场聚焦澳洲利润率走弱,次日可能小幅承压,但无盈利预警或下修指引,做空缺乏强催化与量化支撑
  • 香港燃料成本推动10月电价较1月+4.8%,尽管有燃料回扣,政治/监管对电费与准许回报的态度仍可能影响估值

反向证据

  • 做多前查反向 · 来源 web · 日期 2026-10-12 · 影响 weakens
    本声明确认澳洲批发电价与波动下降、零售客户12个月减约12.5万户(5%)、7月起下调电价且设立转型办公室降本,是对做多香港数据中心叙事的实质反向证据,削弱单边做多理由
    检索:CLP EnergyAustralia profit warning tariff cut customer loss 2026 原文 ↗
  • 做空前查反向 · 来源 filing · 日期 2026-10-12 · 影响 weakens
    声明含香港售电+2.5%、数据中心+12.8%、核电稳定、新投产四个风电/光伏项目及机制电价锁定,且无盈利下修或削减分红,缺乏强空催化
    检索:中电控股 2026 全年 盈利 指引 上调 数据中心 管制计划 准许利润 原文 ↗

先例如何影响了这次决策

对本次决策的影响:先例不足与事件本身MIXED、无盈利惊喜共同支持AVOID,不设定tp/sl。

方向:无干净对齐先例:中电季度运营声明不含季度盈利、派息常年高度稳定,市场对同类文件通常反应温和,方向上多由香港正面与澳洲负面共同决定,不提供可靠单边方向。

涨幅量级:缺少同市场、同相位、以首发时刻为锚且1/3/5日完整的高相似先例,不用任何数字校准止盈止损。

形态:未进行先例价格统计,不能判断见光死概率;但公用蓝筹常规运营披露+持平股息历史上多为低波动事件。

工具执行结果 · 成功 2 · 降级 0 · 失败 0 · 取消 0
  1. search_processed_events 成功 stock_tools HTTP · 11 ms
    {"result": "search_processed_events:agent query=`clp 00002 third interim dividend hk$0.63 2026 | energyaustralia 客户减少 批发电价 中电控股 季度 | 中电控股 clp holdings 2026 第三季度季度声明 quarterly statement`;结构化索引覆盖完整 72 小时;旧记录兼容扫描近 0.0/72 小时、0 条本臂决策(完整),返回 0 条候选。未命中只表示这些 agent query 表达式没有召回候选,不能据此证明消息首发或不是重复;按当前事件继续正常研判
  2. web_search 成功 doubao_search · 2,236 ms
    豆包搜索结果(原始查询:中電控股 2026 首九個月 季度聲明 數據中心 售電 EnergyAustralia;API SearchType:web)

原文全文

展开原文 · 19,060 字
Page 1 of 7


中電控股有限公司
CLP Holdings Limited
(incorporated in Hong Kong with limited liability)
(Stock Code: 00002)


Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take
no responsibility for the contents of this announcement, make no representation as to its accuracy
or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising
from or in reliance upon the whole or any part of the contents of this announcement.


Quarterly Statement 2026 (January – September)


To Shareholders:

The operations of CLP Holdings Limited (the Company or CLP) for the nine months ended
30 September 2026 are summarised in this Quarterly Statement.

Hong Kong

Electricity sales increased 2.5% year-on-year to 28,131 gigawatt hours (GWh) as solid economic
growth in Hong Kong boosted power demand across most sectors. The rapid development of
artificial intelligence (AI) and other innovation and technology industries led to a 12.8% increase
in sales to data centres, which made up 6.6% of total consumption. Power consumption for
electric vehicle (EV) charging also continued to post strong growth. The following table shows
electricity sales by sector in the first nine months of 2026 and year-on-year changes:

Sales % of
by Sector (GWh) Change Total Sales
Residential 7,637 (1.4%) 27%
Commercial 11,024 4.3% 39%
Infrastructure and Public Services 8,292 4.0% 30%
Manufacturing 1,178 1.0% 4%

Ongoing geopolitical instability in the Middle East has continued to affect global energy markets.
Reflecting rising fuel costs, the Average Net Tariff for CLP Power Hong Kong Limited (CLP Power)
customers in October increased 4.8% compared to the level in January. To support households,
CLP Power is providing a special fuel rebate from August to October. Around 50% of residential
customers are expected to benefit from rebates of around HK$100 each during the period.

CLP welcomes and supports the First Five-Year Plan for Economic and Social Development of the
Hong Kong Special Administrative Region (2026-2030) announced by the Government and the
Chief Executive's 2026 Policy Address. The Five-Year Plan provides a clear strategic blueprint for
Hong Kong’s future development and a systematic framework for driving economic
transformation and upgrading, industrial innovation and the green transition. CLP will fully
support the Government’s development strategies through forward-looking electricity planning
Page 2 of 7

and continuous investments to provide a safe, reliable and lower-carbon power supply to enable
Hong Kong’s high-quality growth.

To support the growth of the Northern Metropolis, CLP Power is accelerating the build out of
electricity infrastructure in areas including Hung Shui Kiu, Sandy Ridge Data Facility Cluster and
San Tin Technopole. Power infrastructure development for the Sandy Ridge Data Facility Cluster
is progressing at pace in close collaboration with the project developer, with the target of
commencing operations in phases from mid-2027.

Engineering works progressed on a pilot project to blend hydrogen with natural gas for power
generation at Black Point Power Station. In August, the project was included in the list of “Trial
Projects on Hydrogen Fuel for Local Application” by the Government’s Working Group on Using
Hydrogen as Fuel. It is expected to provide valuable technical insights into the performance and
commercial viability of hydrogen as a fuel for electricity generation.

Amid growing demand for EV charging, CLP Power provided technical support and tailored power
supply solutions for the Sinopec PIT Ultra Kowloon Bay Supercharging Station, which opened in
August. The station was among the first to adopt the High-voltage Pillar solution developed by
CLP Power, which provides large power supply capacity while minimising construction time and
installation space requirements. This offers greater flexibility in power supply arrangements and
helps reduce construction costs. CLPe Holdings Limited (CLPe) further expanded its EV charging
network across Hong Kong after setting up a new site in Hung Hom with more than 30 charging
bays, taking the total to over 340. With a focus on serving commercial EV sectors, the business
agreed to work with bus operator Kwoon Chung Bus Group on EV charging for Canadian
International School of Hong Kong’s electric bus services.

In July, CLP Power signed a Memorandum of Understanding with Envision Greenwise to explore
the recovery of residual energy from retired EV batteries, and the potential integration with
energy systems, supporting the sustainable growth of Hong Kong's EV ecosystem.

CLP Power is working closely with five approved research centres focused on innovative energy
technologies under the Innovation and Technology Commission’s new SEAM@InnoHK research
cluster. The collaboration will drive the development and commercialisation of lower-carbon
technologies including smart grids, energy storage and new energy transportation, enabling a
lower-carbon, smarter and more resilient energy system.

In September, CLP Power hosted the Association of the Electricity Supply Industry of East Asia
and the Western Pacific (AESIEAP) CEO Conference in Hong Kong. The event convened more than
200 industry leaders to explore how the industry can respond to rising electricity demand,
climate challenges and increasingly complex power systems, while strengthening energy system
resilience, accelerating smart energy development and advancing a reliable, affordable and low-
carbon energy future.

CLPe continued to benefit from the growth of renewable energy deployment in Hong Kong,
securing three photovoltaic system installation projects from the Water Supplies Department
and the Civil Engineering and Development Department. In addition, a partnership with the
Vocational Training Council is expected to generate around 1.3GWh of renewable energy a year
from solar panels installed across 13 campuses, equivalent to the annual electricity consumption
of approximately 400 households.
Page 3 of 7


Rising demand for cooling solutions is another major growth driver for CLPe. Recent contract
wins included the replacement and upgrade of the chiller plant at Tsuen Wan Plaza, a property
managed by Hong Yip Service Company Limited. CLPe also strengthened its collaboration with
Henderson Land through a cooling services agreement at a commercial building in Sheung Wan.

Chinese Mainland

Operations of CLP China’s nuclear energy assets in Guangdong province remained stable in the
first nine months of the year. Generation from Daya Bay Nuclear Power Station increased
compared with the same period of last year. While output from Yangjiang Nuclear Power Station
continued to be robust, average tariffs dropped as more generation was allocated to market
sales and competition remained strong.

New wind and solar projects and solid hydro operations contributed to a moderate increase in
CLP China’s overall renewable energy generation compared to a year earlier, despite higher grid
curtailment. Reduced wind speeds and solar irradiance in eastern coastal regions this year also
affected output. Average tariffs for generation dropped marginally from a year earlier, with signs
that the overcapacity situation in the renewable energy market is stabilising.

In September, CLP China began commercial operations of two wind farms in Shandong province
– Juancheng I (300 megawatts (MW)) and Guanxian I (125MW). This followed the commissioning
of Sandu II (100MW) in Guizhou province and Xundian III (50MW) in Yunnan province earlier this
year. To secure more reliable revenue streams following renewable energy market reforms
effective since June 2025, all four assets have established arrangements to sell their output
through mechanism tariff or corporate contracts.

CLP China commenced construction of the Qingyuan solar farm (80MW) in Zhejiang province in
July after securing a mechanism tariff contract. A similar financial arrangement supports the
Juancheng II wind project (106MW) in Shandong, which began construction in January. CLP China
is also seeking reliable revenue streams for the Hepu solar farm (140MW) in Guangxi Zhuang
Autonomous Region currently under construction.

In July, the National Development and Reform Commission (NDRC) announced new targets to
increase the consumption and reliability of renewable energy under the 15th Five-Year Plan. The
industry received another boost from a separate NDRC policy which requires energy-intensive
industries including steel and polysilicon to increase renewable energy consumption to meet
minimum thresholds effective 1 August.

CLP China’s minority-owned coal-fired assets continued to face strong market competition that
affected demand for their generation.

Australia

EnergyAustralia maintained reliable operations of its power stations in the first nine months of
this year, although reduced wholesale electricity price levels and lower price volatility reduced
the margins of and outlook for the generation business.
Page 4 of 7

In the retail energy market, competition remained intense and customer accounts decreased by
around 125,000, or 5%, to about 2.2 million in the 12 months ended September. Margins
softened after EnergyAustralia reduced electricity tariffs for most retail customers from July
following cuts in regulated benchmark prices. EnergyAustralia commenced a brand refresh
campaign in August, while preparation work continued on a programme to transform its
technology platform.

With cost-of-living pressures affecting many Australian households and businesses,
EnergyAustralia continued to offer support to customers experiencing financial hardship through
measures including flexible payment plans.

In Victoria, Yallourn Power Station’s generation increased year-on-year. The plant’s operating
performance strengthened after completing major maintenance across all four generation units
in recent years. EnergyAustralia remains focused on running Yallourn safely and reliably until its
scheduled retirement in 2028.

In New South Wales, Mount Piper Power Station’s nine-month output dropped year-on-year as
reduced wholesale electricity prices and market volatility led to lower plant utilisation. The plant
began a two-month planned outage in September, ahead of the peak summer demand period,
to upgrade one of its two units to increase generation capacity by 30MW to 730MW. The less
favourable electricity market conditions also reduced demand for generation from
EnergyAustralia’s gas-fired portfolio compared with a year earlier, although operations remained
reliable. To further enhance the gas-fired fleet’s performance, upgrade and maintenance
programmes began for Jeeralang Power Station in Victoria and Hallett Power Station in South
Australia during the third quarter. Similar works are also planned for Newport Power Station in
Victoria in the fourth quarter.

To increase its flexible energy supply capacity, EnergyAustralia continued to progress
construction of the Wooreen battery storage project (350MW/1,400MWh) near Jeeralang
Power Station, with all battery modules installed, and the project’s grid connection and
substation energised in September. The project is scheduled for completion in the third quarter
of 2027. In South Australia, the Hallett battery project (50MW/200MWh) is on track for
commissioning in the second half of 2027 as construction continued to advance.

Noting EnergyAustralia’s growing exposure to the weakened market outlook, a transformation
office has been established and is undertaking a structured programme of work to reduce the
operating cost base and improve competitiveness.

Under its Yallourn Energy Security Precinct plan, EnergyAustralia is reviewing proposals for
potential data centres at the site of the Yallourn Power Station after its retirement and the
development of gas-fired generation and battery storage to meet the associated increased
demand. With existing electricity grid and high-speed data connections, the site is well-
positioned for data centre development.
Page 5 of 7

India

Apraava Energy recorded higher renewable energy generation in the first nine months compared
with a year earlier, benefitting from the reliable operations of its wind and solar assets across
India and improved natural resources.

Three renewable energy projects under construction continued to progress. They include the
300MW Aski wind farm in Karnataka state, and the 250MW NHPC Bhanipura I and 300MW NTPC
Bhanipura II solar projects in Rajasthan state.

Apraava Energy’s transmission business also performed well. The Fatehgarh IV asset in Rajasthan
has operated reliably following its commissioning earlier this year. Both the Kohima-Mariani
Transmission Ltd. asset in north-eastern India and the Satpura Transco Private Ltd. asset in
Madhya Pradesh continued to deliver high availability.

Three transmission projects under construction are on track for commissioning this year: the
Karera project in Madhya Pradesh with 43 kilometres (km) of transmission lines and a 3,000
megavolt ampere (MVA) substation, the Fatehgarh III project with 230 km of transmission lines
in Rajasthan, and the Rajasthan IV A project comprising around 200 km of power lines and a
6,000MVA substation.

The transmission portfolio was further expanded in the third quarter after two projects were
won through competitive auctions: the Ananthapur project in Andhra Pradesh state, comprising
250 km of transmission lines and a 4,500MVA substation, and the Kandalgaon project in
Maharashtra state with around 200 km of power lines and a 4,500MVA substation.

In August, Apraava Energy successfully completed its advanced metering infrastructure (AMI)
contract in Assam state involving the installation of more than 680,000 smart meters, around
three years after starting the project. In addition, the business has eight other AMI projects
comprising around 9 million smart meters – more than 4.1 million have been installed, including
1.5 million this year.

Taiwan Region and Southeast Asia

Ho-Ping Power Station in Taiwan Region increased generation in the first nine months of the year
as operations remained robust. The Ho-Ping Power Company has submitted a bid to the offtaker
for the power purchase agreement renewal in 2027, and a review of other future options is
underway.

Lopburi Solar Farm in Thailand continued to operate reliably.
Page 6 of 7

Third Interim Dividend

Today, the Board of Directors of the Company declared the third interim dividend for 2026 of
HK$0.63 per share, same as the 2025 third interim dividend, payable on 15 December 2026 to
Shareholders registered as at 4 December 2026. The dividend of HK$0.63 per share is payable on
the existing 2,526,450,570 shares in issue.

The Register of Shareholders will be closed on 4 December 2026, also the record date for
determining dividend entitlement. To rank for the third interim dividend, all transfers should be
lodged with the Company’s Registrars, Computershare Hong Kong Investor Services Limited,
Shops 1712-1716, 17th Floor, Hopewell Centre, 183 Queen’s Road East, Wanchai, Hong Kong, for
registration not later than 4:30 p.m. on Thursday, 3 December 2026.




The Hon Sir Michael Kadoorie
Chairman of the Board of Directors

Hong Kong, 12 October 2026
_____________________________________________________________________________

The Directors of the Company as at the date of this Quarterly Statement are:

Non-executive Directors: The Hon Sir Michael Kadoorie, Mr Andrew Brandler,
Mr Philip Kadoorie, Mrs Yuen So Siu Mai Betty and
Mr Diego Gonzalez Morales

Independent Non-executive Directors: Mr Nicholas C. Allen, Ms May Siew Boi Tan, Mr Chunyuan Gu,
Mr Chan Bernard Charnwut, Ms Wang Xiaojun Heather,
Mrs Kung Yeung Yun Chi Ann and Mr Peter Brien

Executive Director: Mr Chiang Tung Keung


This Statement will be despatched on 23 October 2026 only to Shareholders as per the
Company’s Corporate Communications Arrangement and is also available at the Investor
Relations section on the Company’s website at www.clpgroup.com.
Page 7 of 7

_____________________________________________________________________________

Choice of language and means of receipt of corporate communications1

You can, at any time, free of charge, ask for this Quarterly Statement in printed form (English and/
or Chinese); and change2 your choice of language and/or means of receipt3 of the Company’s
future corporate communications.

You can make the above request(s) by completing and returning the Request Form (available on
the Company’s website under “Shareholder Services” in the “Investor Relations” section) to the
Company’s Registrars by post or by email to clp.ecom@computershare.com.hk.

Please refer to the Corporate Communications Arrangement on CLP website for more information.


Notes: 1. Corporate communications refer to Interim/Annual Reports, Quarterly Statements, notice(s) of meeting, proxy form(s) or other
shareholder publications of the Company (including any “corporate communication” as defined in the Rules Governing the Listing
of Securities on The Stock Exchange of Hong Kong Limited).

2. Your change request applies to the next batch of corporate communications if we have at least seven days written notice of your
request, otherwise, it will apply to the subsequent batch of corporate communications.

3. A request to receive the Company’s future corporate communications in printed form will remain valid until (i) the instruction has
been revoked or superseded, or (ii) the publication of the Company’s next Annual Report in the following year, whichever is earlier.

决策记录链 · 只追加

每次领取产生一条记录,重新决策追加一条并以 supersedes 指向被替代的记录(ADR 0014)。

  1. 8428fa62ea · 2026-10-12 17:44 · doubao / doubao-seed-evolving-latest-version · 策略包 2226518bfdee当前