Hudbay与三菱正式批准亚利桑那Copper World铜矿建设,2029年下半年投产
一手SEC披露确认项目从预期/研究阶段进入正式建设阶段,产量翻倍、融资去风险和较低Hudbay出资构成实质正催化;盘后仅上涨约1.25%,尚未出现明显透支,故小仓参与次日开盘后的延续重定价。
展开详情(成交明细 / 研究档案 / 原文全文 / 决策记录链)
分时走势
做多 HBM.US Hudbay Minerals Inc.
5 个交易日均已收盘,数据完整 · 美股含盘前盘后(灰底:美东 04:00 至收盘后 4 小时)
- 发布 10-22 01:14 北京(美东 10-21 13:14)
- 抓取 10-22 01:14 北京(美东 10-21 13:14)
- 入场 10-22 01:18 北京(美东 10-21 13:18) · 盘中首笔 @24.04
- 决策 10-22 06:46 北京(美东 10-21 18:46)
- 离场 10-22 21:30 北京(美东 10-22 09:30) · 开盘 @22.66
时间轴只含交易时段(午休、隔夜已压缩);横轴为北京时间,悬停看当地时间;蓝虚线 = 纸面入场价;建仓日图红线在昨收上方、绿线在下方
成交明细 · 纸面
做多 HBM.US Hudbay Minerals Inc.
| 收益状态 | -5.87% 已平仓 |
|---|---|
| 进场成交 | 2026-10-21 · 盘中首笔 · 10-22 01:18 北京 · @24.0423 · 成交 22% |
| 离场成交 | 2026-10-22 · 开盘 · @22.66 |
| 毛收益 | -5.75% |
| 成本 | +0.12% |
| 净收益 | -5.87% |
| 计入收益 | -1.32% |
| 建仓日 | 2026-10-21 · 进场不早于新闻时刻 + 2 分钟 |
收益口径 event_time_plus_2min_10min_walk_open_topup_to_next_open_exchange_calendar_fill_model_local_notional_v9 · method_id m8db1cbc8f2d · 截至 2026-10-27 20:00
研究档案
结论摘要
Copper World正式FID把Hudbay最大增长项目从“待批准”推进到“开建”,前十年新增约10.2万吨年产铜并有望使公司合并铜产量翻倍;三菱、Wheaton和项目债务承担大部分前期资金,降低了Hudbay的资产负债表压力。事件虽在2026年获批预期内且资本开支上升,但盘后反应温和,仍有短期重定价空间。
消息传播链
- 公司发布DFS、FID和融资方案,宣布项目进入建设阶段。
- Hudbay向SEC提交6-K并附上完整新闻稿,确认SEDAR同题披露,属于法定一手披露。市场反应:6-K提交时美股已收盘;盘后HBM.US报24.29美元,较23.99美元收盘价高1.25%。
- 矿业媒体同日报道FID、20.7亿美元资本开支和Hudbay出资比例,传播处于早中期。
关键理由
- Copper World前十年年均产铜10.2万吨,Base Case在5美元/磅铜价下年均EBITDA约6.61亿美元,相对Hudbay约106.6亿美元市值具备重大增量。
- 20.7亿美元初始资本中Hudbay预计仅出资约5亿美元且推迟至2028年,融资结构显著降低摊薄和资产负债表风险。
主要风险
- 初始资本开支较2023年PFS的约13亿美元明显上升,市场可能短期聚焦成本超支而非长期回报。
- FID原本被市场预期在2026年发生,若分析师认为DFS指标无惊喜或铜价回落,股价可能高开低走。
反向证据
- 做多前查反向 · 来源 web · 日期 2026-10-21 · 影响 weakens
初始资本开支由2023年PFS约13亿美元升至20.7亿美元,尽管产量和融资结构改善,仍可能引发成本超支担忧。
检索:Hudbay Copper World capital cost increase 2023 PFS $1.3 billion $2.07 billion market reaction 原文 ↗ - 做多前查反向 · 来源 filing · 日期 2026-10-21 · 影响 weakens
新闻稿前瞻性风险列明许可修订、潜在诉讼、原住民/土地权利主张及前Rosemont相关合同争议;Base Case目前仅需州和地方许可且主要许可已取得。
检索:Copper World litigation permitting federal lands Rosemont Augusta risk Hudbay 原文 ↗ - 做多前查反向 · 来源 filing · 日期 2026-10-21 · 影响 supports
公司披露2026年6月30日净债务/调整后EBITDA为-0.1倍、pro forma流动性约13亿美元,未发现会阻断项目融资的短期资产负债表反证。
检索:Hudbay Q2 2026 balance sheet net debt EBITDA Copper World funding 原文 ↗
先例如何影响了这次决策
对本次决策的影响:先例只支持做多方向和设置较保守的4%/8%止盈,仓位因此降为small,而非按单一类比的高涨幅重仓追击。
方向:唯一成功定价的类比HMY在铜矿开发获批后1日和3日显著跑赢,方向支持FID带来正重定价;但该例相似度仅5分且样本为1。
涨幅量级:同市场、同机制且锚干净的高相似先例均因工具无法取得历史K线而未形成统计,不能用HMY的双位数涨幅机械设定止盈。
形态:未取得足够样本来判断铜矿FID是否系统性见光死;当前HBM盘后涨幅温和且近20日下跌,未见典型利好抢跑后的高开封死。
历史先例(按相似度)
- 相似度 8/10 HBM.US 2025-08-13 Hudbay宣布三菱以6亿美元取得Copper World 30%权益并推进2026年批准。 原文 ↗
拟测HBM.US公告后1/3/5日反应;工具因历史K线锚数据不足未纳入定价统计。
相似度依据:同一项目的关键去风险事件,引入三菱6亿美元资金,但当时尚未正式FID。
经验:同一增长项目的合资融资可被市场视为去风险,但本次FID才是建设阶段的状态迁移。 - 相似度 8/10 TECK.US 2018-12-04 Teck宣布住友参与并批准QB2建设,交易规模12亿美元。 原文 ↗
拟测TECK.US公告后1/3/5日反应;工具因历史K线锚数据不足未纳入定价统计。
⚠来源层级不符(声明issuer/实为media) — 该行涨幅别用来定止盈止损
相似度依据:北美铜生产商在引入日本合作方后批准大型绿地铜矿建设,机制和融资结构高度相近。
经验: partner-backed大型铜矿FID可降低股权融资压力,但项目后续资本超支仍会影响长期股价。 - 相似度 7/10 CS.US 2025-08-08 Capstone批准Mantoverde Optimized棕地扩建项目。 原文 ↗
拟测CS.US公告后1/3/5日反应;工具无可用美股K线。
⚠来源层级不符(声明issuer/实为media) — 该行涨幅别用来定止盈止损
相似度依据:同属铜生产商项目sanction,但为棕地扩产、资本和增量小于Copper World。
经验:较小的棕地扩建若回报明确,也可成为正向催化,但弹性通常低于产量翻倍的绿地项目。 - 相似度 6/10 CS.US 2025-10-13 Capstone宣布Orion最高3.6亿美元取得Santo Domingo 25%权益。 原文 ↗
拟测CS.US公告后1/3/5日反应;工具无可用美股K线。
⚠来源层级不符(声明issuer/实为media) — 该行涨幅别用来定止盈止损
相似度依据:铜矿项目引入外部资本分担开发风险,但并非最终建设批准。
经验:项目融资伙伴消息能改善资金可获得性,但状态迁移强度低于正式FID。 - 相似度 5/10 HMY.US 2025-11-24 Harmony批准高毛利、长寿命Eva铜矿开发。 原文 ↗
事件后 +1日 +6.8% · +2日 +9.1% · +3日 +16.1% · +4日 +18.2% · +5日 +16.2%
相似度依据:同为矿业公司批准大型铜矿开发,但公司主业为黄金且项目在澳大利亚,跨商品和跨主体可比性有限。
经验:唯一成功取价的类比显示重大矿山开发获批可能带来连续重定价,但样本仅1条,不能直接外推涨幅。
工具执行结果 · 成功 15 · 降级 1 · 失败 1 · 取消 0
- search_processed_events 成功 stock_tools HTTP · 3,488 ms
{"result": "search_processed_events:agent query=`hbm copper world definitive feasibility study 102000 tonnes $2.07 billion sanction | hudbay copper world final investment decision construction mitsubishi dfs october 21 2026 | hud`;结构化索引覆盖完整 72 小时;旧记录兼容扫描近 72.0/72 小时、27540 条本臂决策(完整),返回 0 条候选。未命中只表示这些 - stock_quote 成功 stock_tools HTTP · 1,355 ms
{ - search_case_library 成功 stock_tools HTTP · 16 ms
{"result": "search_case_library「HBM.US」无历史决策命中(我们过去没在这些标的上决策过,或历史尚未回填)。\n◆ HBM.US:相关历史决策 4 条 · 其中该标的 ENTER 0 条(0.0%) · 我们从没在这只票上 ENTER 过"} - web_search 成功 doubao_search · 1,309 ms
豆包搜索结果(原始查询:Hudbay Copper World final investment decision October 21 2026 market reaction shares;API SearchType:web) - web_search 成功 doubao_search · 1,799 ms
豆包搜索结果(原始查询:copper mine final investment decision shares reaction feasibility study approval mining company;API SearchType:web) - kb_search 失败 stock_tools HTTP · 10,011 ms
kb_search 暂不可用;这不是一条知识库命中,也不能据此推断没有资料。 - web_search 成功 doubao_search · 353 ms
web_search「site:sec.gov/Archives/edgar/data copper project "final investment decision" "approve" construction mining company」无结果。 - web_search 成功 doubao_search · 1,808 ms
豆包搜索结果(原始查询:copper miner approves construction final investment decision shares rose percent TSX;API SearchType:web) - web_search 成功 doubao_search · 1,638 ms
豆包搜索结果(原始查询:Teck Resources QB2 final investment decision approves construction date share price reaction;API SearchType:web) - web_search 成功 doubao_search · 1,266 ms
豆包搜索结果(原始查询:First Quantum approves final investment decision copper project construction press release;API SearchType:web) - web_search 成功 doubao_search · 1,761 ms
豆包搜索结果(原始查询:Hudbay Copper World analyst reaction FID DFS capital cost 2026 $2.07 billion;API SearchType:web) - web_search 成功 doubao_search · 1,200 ms
豆包搜索结果(原始查询:Capstone Copper Santo Domingo final investment decision construction approved 2025 Orion;API SearchType:web) - web_search 成功 doubao_search · 1,538 ms
豆包搜索结果(原始查询:Hudbay Mitsubishi $600 million Copper World August 13 2025 press release;API SearchType:web) - web_search 成功 doubao_search · 1,661 ms
豆包搜索结果(原始查询:Teck QB2 construction proceed December 4 2018 press release $1.2 billion Sumitomo;API SearchType:web) - web_search 成功 doubao_search · 1,570 ms
豆包搜索结果(原始查询:copper project board sanction construction approval "October" miner press release 2024;API SearchType:web) - web_search 成功 doubao_search · 1,724 ms
豆包搜索结果(原始查询:Copper Mountain Mining approves expansion project final investment decision press release;API SearchType:web) - event_study 降级 stock_tools HTTP · 3,606 ms
5 precedent(s) rejected; 0 benchmark warning(s)
原文全文
展开原文 · 77,908 字
6-K
1
form6k.htm
FORM 6-K
Hudbay Minerals Inc.: Form 6-K - Filed by newsfilecorp.com
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13A-16 OR 15D-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
For the month of
October 2026
Commission File Number:
001-34244
HUDBAY MINERALS INC.
(Translation of registrant’s name into English)
25 York Street, Suite 800
Toronto, Ontario
M5J 2V5, Canada
(Address of principal executive offices)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [ ] Form 40-F [X]
Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
Yes [ ] No [X]
If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82- _____________________________
EXPLANATORY NOTE
On October 21, 2026, Hudbay Minerals Inc. (“Hudbay”) filed on the Canadian Securities Administrators’ System for Electronic Document Analysis and Retrieval (SEDAR) website at www.sedarplus.ca the following documents: (1) News Release dated October 21, 2026.
Copies of the filings are attached to this Form 6-K and incorporated herein by reference, as follows:
Exhibit 99.1 — News Release dated October 21, 2026
2
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
HUDBAY MINERALS INC.
(registrant)
By:
/s/ Mark Haber
Name:
Mark Haber
Title:
Vice President, Legal & Corporate Secretary
Date: October 21, 2026
3
EXHIBIT INDEX
The following exhibits are furnished as part of this Form 6-K:
Exhibit
Description
99.1
News Release dated October 21, 2026
4
----- exhibit99-1.htm -----
EX-99.1
2
exhibit99-1.htm
EXHIBIT 99.1
Hudbay Minerals Inc.: Exhibit 99.1 - Filed by newsfilecorp.com
TSX, NYSE - HBM
2026 No. 27
25 York Street, Suite 800
Toronto, Ontario
Canada M5J 2V5
tel
416 362-8181
fax 416 362-7844
hudbay.com
News Release
Hudbay and Mitsubishi Approve Copper World Project Construction; Advancing Next Major U.S. Copper Mine Towards First Production in 2029
Toronto, Ontario, October 21, 2026 - Hudbay Minerals Inc. ("Hudbay" or the "Company") (TSX, NYSE: HBM)
today announced the results of the definitive feasibility study and related pre-feasibility studies (collectively, the "DFS") for its 70%-owned Copper World project in Arizona, located approximately 50 kilometres (31 miles) southeast of Tucson. Copper World is 30%-owned by Mitsubishi Corporation ("Mitsubishi") pursuant to a joint venture agreement entered into with Hudbay in January 2026. Supported by a robust DFS, Hudbay and Mitsubishi have formally approved the final investment decision to proceed with the construction and development of Copper World as the next major copper mine in the U.S. with first production targeted for the second half of 2029. Hudbay will be filing a technical report pursuant to National Instrument 43-101 containing the results of the DFS for Copper World. All dollar amounts are in U.S. dollars, unless otherwise noted. "Tonnes" refer to metric tonnes and "tons" refer to imperial or U.S. short tons.
Copper World Will Be One of the Largest Open-Pit Copper Mines in the United States, Doubling Hudbay's Annual Copper Production Levels
●
With first production projected in the second half of 2029, Copper World will be the first of the next generation of long-life, low-cost copper mines in the Americas.
●
Copper World DFS outlines annual copper production of 102,000 tonnes over the first 10 years, an 11% increase when compared to 92,000 tonnes in Hudbay's 2023 pre-feasibility study for Copper World ("2023 PFS").
●
Average annual cash costs
i
of $1.65 per pound over the first 10 years continues to position Copper World as one of the lowest cost open-pit copper mines in the U.S.
ii
●
Hudbay's consolidated annual copper production is expected to increase to approximately 250,000 tonnes, doubling current production levels, with other brownfield growth projects underway.
Robust Base Case Project Economics and Strong Returns with Unique Extension Optionality
●
The base case for the Copper World project ("Base Case") contemplates a 15-year mine life utilizing mineral reserves, requires only state and local permits and contemplates a comparable total mill feed tonnage to the 2023 PFS. Base Case after-tax net present value (8%) of $1.2 billion and internal rate of return of 17% at a long-term copper price of $5.00 per pound, increasing to $2.3 billion and 22%, respectively, at a copper price of $6.00 per pound.
●
Base Case further optimizes the 2023 PFS mine plan with an in-pit crushing and conveying system in year four and an expansion of the concentrator from 60,000 tons per day to 90,000 tons per day in year five. Concentrator expansion enables a 43% increase in average annual copper production to 120,000 tonnes in years six to 10 compared to 84,000 tonnes over the first five years.
●
The extension case for the Copper World project contemplates a 37-year mine life utilizing only measured and indicated mineral resources and expands mining activities onto federal lands in year 10, subject to obtaining federal permits ("Extension Case"), maintaining annual copper production of 117,000 tonnes from years 11 to 20. The Extension Case incorporates and further optimizes the second phase from Hudbay's 2022 preliminary economic assessment ("2022 PEA") with less additional growth capital. Extension Case after-tax net present value (8%) of $2.5 billion and internal rate of return of 19% at a long-term copper price of $5.00 per pound, increasing to $4.0 billion and 24%, respectively, at a copper price of $6.00 per pound.
1
TSX, NYSE - HBM
2026 No. 27
Copper World is One of the Lowest Capital Intensity Copper Projects, Prudently Funded with Low-Leverage Financing Plan
●
Initial growth capital of $2.07 billion
iii
($1.84 billion net of precious metals stream deposit) includes approximately $200 million related to changes in project scope since the 2023 PFS providing an optimized pathway to the expansion to 90,000 tons per day in year five.
●
Copper World maintains an attractive capital intensity of approximately $22,600 per annual copper tonne using average production in years five to twelve, including the expansion capital in years three and four.
●
Well balanced project funding plan with initial capital provided by Mitsubishi's $600 million initial joint venture equity investment and Wheaton Precious Metals Corp.'s ("Wheaton") $230 million deposit for the existing precious metals stream, followed by approximately $650 million in anticipated project-level debt financing, representing less than 30% leverage. Balance of funding from Hudbay and Mitsubishi's pro-rata equity capital contributions is deferred to 2028.
Transformative Copper World Project to be Delivered with Disciplined Capital Allocation and Prudent Funding Plan Leading to Superior IRRs for Hudbay
●
With the successful execution of its disciplined capital allocation strategy, attracting Mitsubishi as a long-term strategic joint venture partner and prudent project funding plan, Hudbay's Copper World capital contributions are expected to be approximately $500 million, representing less than 25% of the initial growth capital, with capital contributions not required until 2028. Hudbay is well-positioned to fund capital contributions from its existing cash balance and liquidity, as well as projected strong free cash flow from its diversified operations during Copper World's project development.
●
The levered IRR to Hudbay increases to 32% at $5.00 per pound of copper long-term in the Base Case and to 44% at $6.00 per pound of copper in the Extension Case. Copper World's final investment decision enables Hudbay to deliver on its growth initiatives and maximize long-term risk-adjusted returns, while maintaining strong financial discipline within Hudbay's holistic capital allocation framework.
●
Copper World is expected to deliver average annual EBITDA
iv
of $661 million over the first 10 years in the Base Case and $735 million over the next 10 years in the Extension Case at a copper price of $5.00 per pound. Using a copper price of $6.00 per pound, Copper World's annual EBITDA over these periods increases to $859 million and $963 million in the Base Case and Extension Case, respectively, representing an 80% to 90% increase in Hudbay's consolidated annual EBITDA as compared to 2025.
●
Copper World project sanctioning is supported by Hudbay's strong balance sheet, which has been further improved with a proactive two-year extension of the Company's senior secured revolving credit facilities from November 2028 to November 2030 and an upsize of the facilities to $700 million. Closing of the upsized credit facilities is expected in the fourth quarter and the extended term will provide increased financial flexibility to manage the maturity of the Company's 6.125% coupon 2029 senior unsecured notes and develop the Copper World project. The amended credit facilities also include an improved pricing grid reflecting the enhanced financial position of Hudbay and feature an opportunity to increase the facility by an additional $150 million at Hudbay's discretion during the four-year tenor, providing additional financial flexibility.
Copper World Expected to Deliver Strong Benefits to All Stakeholders for Decades
●
Copper World is one of the highest-grade open pit copper projects in the Americas
v
with proven and probable mineral reserves of 390 million tonnes at 0.47% copper and a 15-year mine life with a low strip ratio of 1.5.
●
Measured and indicated resources of 1.2 billion tonnes (inclusive of reserves) at 0.40% copper have the potential to extend the mine life for decades, to a total of 37 years, as demonstrated by the Extension Case.
●
Significant benefits for the community and local economy in Arizona through payments of $1.1 billion to $3.7 billion in total U.S. taxes and the creation of over 1,000 construction jobs, 500 permanent, multi-generational jobs and up to 3,000 indirect jobs.
2
TSX, NYSE - HBM
2026 No. 27
●
The fully permitted concentrate leach facility-which would produce "Made in America" copper cathode for the U.S. critical minerals supply chain-represents a key future upside opportunity. Backed by advanced engineering work, it has the potential to add approximately $377 million of additional after-tax net present value to Copper World
v
i
.
"The approval of the development of Copper World represents a significant milestone for Hudbay, our partners at Mitsubishi, our stakeholders, and the copper landscape in the U.S.," said Peter Kukielski, Hudbay's Chief Executive Officer. "Copper World is one of the most attractive copper growth projects in the Americas, offering some of the highest copper grades, lowest cash costs and favourable capital intensity. This project adds more than 100,000 tonnes of annual copper production over the first 10 years, and the DFS demonstrates the full potential of the project in the Extension Case, delivering higher annual copper production for more than 30 years. It also adds a fourth operating asset to our diversified operating platform and further enhances our tier one operating jurisdictions profile with the addition of the U.S. We are continuing to set the new gold standard in copper as we embark on building a leading copper district in Arizona."
"The robust Copper World DFS and our joint final investment decision paves the road to production in the second half of 2029, establishing a low-capital intensity, high-margin operation that will generate strong long-term returns for Hudbay, Mitsubishi and our stakeholders," said Eugene Lei, Hudbay's President and Chief Financial Officer and Chair of the Copper World Joint Venture Board. "We successfully executed a disciplined capital allocation strategy and ideal funding plan that only requires Hudbay to fund one-quarter of the project capital cost and defers Hudbay's first capital contribution to 2028, resulting in superior IRRs. We are well-positioned to fund our share of the Copper World project capital and make generational investments in our operating mines with existing cash on hand and strong free cash flow from our diversified operations to double our copper production per share."
"The final investment decision for Copper World marks the beginning of a new phase for the joint venture," said Taro Abe, Mitsubishi's Critical Minerals Division COO, Mineral Resources Group. "We are pleased to move forward with the project and advance it toward first production in the second half of 2029. Copper World is important to our growth strategy and the U.S. copper landscape, with the potential to deliver lasting benefits to communities and stakeholders. As a committed long-term partner, we continue to leverage our broad business footprint in North America and extensive experience in mining project development and marketing to maximize the value of the Copper World joint venture."
Copper World De-Risked and Optimized Through Feasibility and Pre-feasibility Studies
The Copper World project includes four deposits discovered in 2021, together with the East deposit. Copper World is planned to be a traditional open pit shovel and truck operation with a conventional flotation concentrator producing copper concentrate and molybdenum concentrate. A new resource model was completed for the 2022 PEA, which contemplated a two-phased mine plan with Phase I as a stand-alone operation requiring state and local permits only and Phase II expanding onto federal lands requiring federal permits. Phase I contemplated a 60,000 tons per day sulfide concentrator and Phase II assumed an expansion of the concentrator to 90,000 tons per day.
In September 2023, Hudbay released the 2023 PFS for Copper World reflecting the results of further technical work on Phase I of the project. Phase I had a mine life of 20 years, reflecting a 60,000 tons per day sulfide concentrator that would produce copper concentrate as a final product. The 2023 PFS also contemplated the addition of a concentrate leach facility and a solvent extraction and electrowinning plant in year five that would allow the project to produce copper cathode.
Since 2023, Hudbay has focused on metallurgical testing and progressing the engineering of the initial operation to a feasibility study level, in addition to completing related pre-feasibility studies on the mill expansion and IPCC projects listed below, trade-off studies and de-risking activities. Hudbay has also received all major permits required to bring the mine plan into operation under the 60,000 tons per day concentrator scenario and secured Mitsubishi as a 30% joint venture partner.
3
TSX, NYSE - HBM
2026 No. 27
The principal enhancements since the 2023 PFS include several optimizations:
●
Concentrator Expansion to 90,000 tons per day
- The current plan contemplates an expansion of the milling capacity starting in year five to 90,000 tons per day from 60,000 tons per day. The $443 million in capital invested in year four for the concentrator expansion is expected to be funded from cash flows from the operation and a $70 million additional payment from Wheaton in year five.
●
In-Pit Crushing and Conveying ("IPCC")
- Copper World's development plan contemplates the addition of an IPCC system starting in year four to efficiently manage the higher mined material tonnages to match the concentrator expansion throughput in year five. The IPCC system will have a nominal design capacity of 100,000 tons per day and forms a critical component of the mine plan that will convey ore from the East pit to stockpiles and the processing plant. The IPCC will enable fewer haul trucks and lower emissions and operating costs.
●
Enhanced Tailings Strategy
- The current plan contemplates a conversion from conventional tailings deposition to filtered tailings for approximately one-third of the total volume of tailings in the Base Case starting in year five, enabling the concentrator expansion with no additional water supply required.
●
Lower Mine Strip Ratio
- The mine plan has been optimized for space constraints for tailings and waste rock disposition in the Base Case, reflecting a new flotation recovery formulation with updated price and cost assumptions and resulting in an approximately 20% smaller East pit with a significant reduction in the strip ratio through lower waste mined.
●
Extension Case Illustrates Project's Full Potential
- Pre-feasibility work has been advanced on the scenario that contemplates an extension of mining activities onto Copper World's unpatented claims and the associated federal lands in year 10, subject to obtaining federal permits. The Extension Case incorporates and further optimizes the second phase from Hudbay's 2022 PEA, illustrating the full potential of Copper World and extending the mine life to 37 years. Under FAST41, mining projects in Arizona have received federal permits in approximately three years.
●
Concentrate Leach Facility Continues to Provide Future Optionality
- Significant engineering work has advanced to pre-feasibility level on the concentrate leach facility to establish its technical viability and provide the option to produce "Made in America" copper cathode in the future. The Company will continue to evaluate Copper World's concentrate leach facility considering future market conditions, such as premiums for copper metal in the U.S., and the unique strategic opportunity it presents as one of the few fully permitted domestic copper cathode producing facilities in the U.S. It also presents opportunities to unlock potential synergies with Hudbay's Cactus project in Arizona.
2026 DFS Summary
The
Base Case
presented in the DFS is used to support the mineral reserve estimates of 390 million tonnes with strong copper grades of 0.47% over a 15 year mine plan. Total mill feed tonnage in the Base Case is comparable to the 2023 PFS. The Base Case is limited to the exterior boundary of Copper World's private landholdings requiring only state and local permits. All major permits have been obtained for construction and initial operations. Please refer to Figure 1 for an overview of the site layout in the Base Case.
●
Base Case after-tax net present value (8%) is $1.2 billion with an internal rate of return of 17% and an initial payback period of 5.4 years at a long-term copper price of $5.00 per pound. At a copper price of $6.00 per pound, the after-tax net present value (8%) increases to $2.3 billion and the internal rate of return increases to 22%.
●
Base Case average annual copper production is 102,000 tonnes over the first 10 years at average cash costs
i
and sustaining cash costs
i
of $1.65 and $2.22 per pound of copper, respectively.
●
Base Case annual average EBITDA is $566 million at a long-term copper price of $5.00 per pound, increasing to $742 million at a long-term copper price of $6.00 per pound.
The
Extension Case
reflects a phased development approach that minimizes initial waste rock movement while operations remain constrained to the existing exterior boundary over the first 10 years and then expand beyond Copper World's private property and onto its unpatented lode and mill site claims starting in year 10 to achieve and sustain a higher total material movement capacity. The Extension Case contemplates a 37-year mine life utilizing only measured and indicated mineral resources totalling 1,048 million tonnes and requires federal permits by year 10 of operations.
●
Extension Case after-tax net present value (8%) is $2.5 billion with an internal rate of return of 19% and an initial payback period of 5.4 years at a long-term copper price of $5.00 per pound. At a copper price of $6.00 per pound, the after-tax net present value (8%) increases to $4.0 billion and the internal rate of return increases to 24%.
4
TSX, NYSE - HBM
2026 No. 27
●
Extension Case average annual copper production over the first 10 years is similar to the Base Case with 101,000 tonnes and increases to 117,000 tonnes on over the period from year 11 to 20. Average cash costs
i
and sustaining cash costs
i
over the 10-year period from year 11 to 20 are expected to be $1.76 and $2.20 per pound of copper, respectively.
●
Extension Case average annual EBITDA is $522 million over the mine life and $735 million over the period from year 11 to 20 at a long-term copper price of $5.00 per pound.
As shown in Figure 2, following the concentrator expansion in year five, annual copper production increases to an average of 122,000 tonnes between year five and year twelve in the Base Case, excluding low-grade stockpile years at the end of the mine life, and average annual cash costs
i
decrease to $1.46 per pound of copper over this period. The elevated production levels further extend to beyond year 20 in the Extension Case as additional resources are mined and utilize the larger concentrator capacity.
A summary of key valuation, production and cost details can be found below. For further details, including operating and cash flow metrics provided on an annual basis, please refer to Exhibit 1 at the end of this news release.
BASE CASE - Summary of Key Metrics (at $5.00/lb Cu long-term)
Valuation Metrics (Unlevered)
1
Unit
Base Case
Net present value @ 8%
$ millions
$1,241
Internal rate of return
%
16.8%
Payback period
# years
5.4
Initial & Expansionary Capital
Unit
Base Case
Growth capital - initial (year -3 to year -1)
2
$ millions
$2,070
Growth capital - molybdenum plant (year 1)
$ millions
$25
Growth capital - IPCC (year 3)
3
$ millions
$242
Growth capital - concentrator expansion (year 4)
3
$ millions
$443
Operating Metrics
Unit
Years
1-5
Years
6-10
Years
11-15
Years
1-10
LOM
Copper production (annual avg.)
4
000 tonnes
84
120
77
102
95
EBITDA (annual avg.)
5
$ millions
$531
$791
$377
$661
$566
Sustaining capital (annual avg.)
$ millions
$50
$35
$11
$43
$32
Cash cost
6
$/lb Cu
$1.80
$1.55
$1.85
$1.65
$1.70
Sustaining cash cost
6
$/lb Cu
$2.57
$1.98
$2.17
$2.22
$2.21
BASE CASE - Copper Price Sensitivity Analysis
Unit
$4.50/lb
Base Case
$5.00/lb
$5.50/lb
$6.00/lb
$6.50/lb
Net present value
1
@ 8%
$ millions
$663
$1,241
$1,725
$2,258
$2,783
Net present value
1
@ 10%
$ millions
$345
$845
$1,254
$1,708
$2,156
Internal rate of return
1
%
12.9%
16.8%
19.5%
22.5%
25.2%
Payback period
# years
5.9
5.4
5.1
4.8
4.5
EBITDA (annual avg.)
5
$ millions
$471
$566
$652
$742
$833
EXTENSION CASE - Summary of Key Metrics (at $5.00/lb Cu long-term)
Valuation Metrics (Unlevered)
1
Unit
Extension Case
Net present value @ 8%
$ millions
$2,510
Internal rate of return
%
18.8%
Payback period
7
# years
5.4
Initial & Expansionary Capital
Unit
Extension Case
Growth capital - initial (year -3 to year -1)
2
$ millions
$2,070
Growth capital - molybdenum plant (year 1)
$ millions
$25
Growth capital - IPCC (year 3)
3
$ millions
$242
Growth capital - concentrator expansion (year 4)
3
$ millions
$443
Growth capital - filtered tailings and starter dams (years 10 and 11)
3
$ millions
$395
Operating Metrics
Unit
Years
1-10
Years
11-20
Years
21-30
Years
31-37
Years
1-30
LOM
Copper production (annual avg.)
4
000 tonnes
101
117
88
33
102
89
EBITDA (annual avg.)
5
$ millions
$634
$735
$513
$73
$627
$522
Sustaining capital (annual avg.)
$ millions
$38
$24
$19
$10
$27
$24
Cash cost
6
$/lb Cu
$1.79
$1.76
$1.94
$3.51
$1.82
$1.94
Sustaining cash cost
6
$/lb Cu
$2.32
$2.20
$2.31
$3.88
$2.27
$2.38
5
TSX, NYSE - HBM
2026 No. 27
EXTENSION CASE - Copper Price Sensitivity Analysis
Unit
$4.50/lb
Ext. Case
$5.50/lb
$6.00/lb
$6.50/lb
Net present value
1
@ 8%
$ millions
$1,702
$2,510
$3,225
$3,983
$4,726
Net present value
1
@ 10%
$ millions
$1,033
$1,685
$2,247
$2,851
$3,440
Internal rate of return
1
%
15.5%
18.8%
21.2%
23.9%
26.3%
Payback period
# years
5.9
5.4
5.1
4.8
4.5
EBITDA (annual avg.)
5
$ millions
$433
$522
$608
$695
$782
1
Calculated assuming the following long-term commodity prices: copper price of $5.00 per pound ($5.50 per pound in year 1 and $5.13 per pound in year 2), gold stream price of $540 per ounce (15% of market price), silver stream price of $6.75 per ounce (15% of market price), and molybdenum price of $17.50 per pound. Reflects the terms of the amended Wheaton stream agreement, including an upfront deposit of $230 million in the first year of construction in exchange for the delivery of 92.5% of the gold and silver contained in the mineral production, followed by an additional deposit of $70 million five years after commercial production is achieved, subject to the concentrator expansion reaching 90,000 tons per day.
2
Total initial growth capital expenditures are in 2026 dollars and net of $127 million of anticipated equipment financing. Equipment financing payments are incorporated in sustaining cash costs.
3
Expansion project capital estimates are based on pre-feasibility studies.
4
Copper production includes copper contained in concentrate sold. Average annual copper production excludes partial year of production in year 15 in the Base Case.
5
EBITDA is a non-GAAP financial performance measure with no standardized definition under IFRS. For further information, please refer to the Company's most recent Management's Discussion and Analysis for the three and six months ended June 30, 2026.
6
By-product credits calculated using amortization of deferred revenue for gold and silver stream sales as per the Company's approach in its quarterly financial reporting. Sustaining cash cost includes sustaining capital expenditures and royalties. Cash cost and sustaining cash cost are non-GAAP financial performance measures with no standardized definition under IFRS. For further information, please refer to the Company's most recent Management's Discussion and Analysis for the three and six months ended June 30, 2026.
7
Payback period in Extension Case does not include filtered tailings capital in years 10 and 11.
Initial Growth Capital Represents Attractive Capital Intensity of $22,600 per tonne
Growth capital includes two phases of construction. The first phase consists of the mine, 60,000 tons per day concentrator process plant, and related infrastructure totalling $2,070 million
iii
in 2026 dollars ($1,840 million net of the precious metal stream payment) to be incurred over a 36-month period prior to commercial production in the second half of 2029. This includes approximately $200 million of initial growth capital related to project scope changes since the 2023 PFS. The second phase of construction consists of optimizations including the molybdenum processing plant, the IPCC system and the concentrator expansion. The molybdenum processing plant is planned for year one of operations and totals $25 million. The IPCC investment totals $242 million and is planned for year three in order to optimize hauling and rehandling costs starting in year four as the mine operations approach the East pit. The concentrator expansion capital totals $443 million and is planned for year four of operations to expand the daily processing capacity to 90,000 tons per day starting in year five, incorporating additional equipment and construction activities. The expansion capital in the second phase of construction is based on feasibility and pre-feasibility level studies and is expected to be fully funded by the cash flow generated by the operation. For further details on the capital cost estimates, timing and cash flows, please refer to Exhibit 1.
Copper World's capital intensity is approximately $22,600 per annual copper tonne using the increased average annual production in years five to twelve and reflecting the initial growth capital of $2,070 million
iii
, IPCC expansion growth capital of $242 million in year three and concentrator expansion growth capital of $443 million in year four. This favourably positions Copper World at a lower capital intensity cost than peer copper projects and recent builds, as shown in Figure 3.
Hudbay's 2026 growth capital spending guidance related to the Copper World joint venture includes approximately $135 million of expenditures before project sanctioning, as previously disclosed. With the sanctioning of Copper World, the Company now expects growth expenditures related to the Copper World joint venture to total $245 million in 2026, reflecting an increase of $110 million related to project construction and development costs in the fourth quarter of 2026.
6
TSX, NYSE - HBM
2026 No. 27
Mineral Reserve and Resource Estimates
The changes between the 2023 and 2026 mineral resource estimates inclusive of mineral reserves represent the impacts of changes in the technical and economic criteria used to report resources, including the use of a NSR cut-off replacing a copper cut-off, updated metal prices, use of a new flotation recovery formulation and removal of the leachable mineral resource estimates. The change in copper metal contained in the measured and indicated mineral resource estimates is negligible, while the metal content in inferred mineral resource estimates has increased by 5% and presents additional upside potential in the future to enhance the production profile and further extend mine life beyond the Extension Case. The overall reduction in head grade is due to the replacement of high-grade leachable resources at low recoveries with lower grade flotation resources but with higher processing recovery.
The 2026 mineral reserve estimates of 390 million tonnes at 0.47% copper represent a comparable tonnage at a lower average copper grade to the 2023 PFS mineral reserve estimates of 385 million tonnes at 0.54% copper. The reduction in grade is related to a change in the mine planning strategy aiming at an approximately 20% smaller pit compared to the 2023 PFS, resulting in a significant reduction in the strip ratio. As the space for tailings and waste rock disposal is the main constraint on mine planning in the Base Case, the significant reduction in the strip ratio offsets the loss in metal production while also considering the new flotation recovery formulation and updated metal price forecast and cost assumptions. The higher-grade mineralization to be recovered at the expense of more waste excavation is not lost and is later recovered in the mine plan of the Extension Case which is not subject to the same land constraints for waste and tailings disposal.
The current mineral reserve and resource estimates for Copper World (effective as of August 1, 2026) are summarized below and replace the prior mineral reserve and resource estimates set forth in the 2023 PFS.
Copper World Project
Mineral Reserve and Resource Estimates
1,2,3,4
,5
,6
Tonnes
(millions)
Cu Grade
(%)
Mo Grade
(g/t)
Au Grade
(g/t)
Ag Grade
(g/t)
Proven reserves
330
0.47
105
0.024
5.25
Probable reserves
60
0.46
94
0.018
4.14
Total Proven and Probable Reserves
390
0.47
103
0.023
5.08
Measured resources (inclusive of reserves)
890
0.42
124
0.022
4.43
Indicated resources (inclusive of reserves)
347
0.35
109
0.015
3.32
Total Measured and Indicated (inclusive of reserves)
1,236
0.40
120
0.020
4.12
Inferred resources
309
0.30
103
0.012
2.69
Note: totals may not add up correctly due to rounding.
1
CIM Definition Standards (2014) were used for reporting the mineral reserves and mineral resources.
2
Mineral resources are estimated as of August 1, 2026. Mineral resource estimates are inclusive of mineral reserves and have been calculated using the following assumptions: metal prices of $5.00 per pound copper, $20.00 per pound molybdenum, $3,600 per ounce gold and $50.00 per ounce silver; operating costs of $1.61 per ton mined, $5.34 per ton processed, G&A costs of $0.69 per ton processed; metallurgical recovery rates vary according to elemental content and are based on preliminary metallurgical test work.
3
Mineral resource estimates that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates are based on resource pit design and do not include factors for mining recovery or dilution.
4
An NSR cut-off value of $5.80 per ton was used to define material reserve estimates. A minimum copper grade of 0.1% and a minimum copper recovery of 48% were also applied to mineral reserves due to the limited tailings capacity.
5
An NSR cut-off value of $6.03 per ton was used to define mineral resource estimates.
6
Mineral resources are not mineral reserves as they do not have demonstrated economic viability.
7
TSX, NYSE - HBM
2026 No. 27
Copper World Comparison of Mineral Resource Estimates
1
2023 PFS
2
2026 DFS
% Change
Tonnes
(millions)
Cu
(%)
Cu
(000 tonnes)
Tonnes
(millions)
Cu
(%)
Cu
(000 tonnes)
Cu
(000 tonnes)
Measured and indicated
1,205
0.42
5,061
1,236
0.40
4,993
-1%
Inferred
275
0.32
880
309
0.30
927
5%
Note: totals may not add up correctly due to rounding.
1
Mineral resource estimates are inclusive of mineral reserve estimates.
2
Refer to the 2023 PFS for the differing technical and economic criteria that were used in the 2023 mineral resource estimate.
Executed a Disciplined Capital Allocation Strategy to Deliver Superior Financial Returns with Significant Financial Flexibility
In 2022, Hudbay introduced a three prerequisites ("3-P") plan for Copper World that included a prudent financial strategy and balance sheet targets that would need to be achieved prior to a final investment decision. The Company successfully completed all of the key elements of the 3-P plan with the completion of the joint venture transaction with Mitsubishi, the enhanced precious metals stream agreement with Wheaton and the achievement of stated balance sheet targets well ahead of schedule. In early 2026, Hudbay implemented a holistic capital allocation framework to maintain strong financial discipline, deliver growth initiatives and maximize long-term risk-adjusted returns. The final investment decision to proceed with the development of Copper World is fully aligned with Hudbay's capital allocation framework.
Secured the Premier Joint Venture Partner to Develop Copper World
- In August 2025, Hudbay announced a $600 million strategic investment from Mitsubishi for a 30% joint venture interest in Copper World, securing a long-term strategic partner with one of the largest Japanese trading houses with a global mining presence and a significant U.S. based business. Mitsubishi was the strategic partner of choice with investments in a world-class portfolio of large and high-quality copper assets, including five of the top twenty copper mines globally. The final investment decision for the construction of Copper World by Mitsubishi validates the attractive long-term value of Copper World as a world-class copper asset and endorses the strong technical capabilities of Hudbay. In addition to the initial strategic investment, as part of the final investment decision, Mitsubishi will contribute up to $423 million in future pro-rata equity contributions for the development of Copper World. Assuming $650 million of project-level debt in the Copper World funding plan, Mitsubishi's pro-rata equity contribution would be reduced to be approximately $218 million.
Enhanced the Precious Metals Stream
-
In 2025, Hudbay agreed on terms with Wheaton to amend the existing precious metals streaming agreement. Wheaton is expected to contribute its $230 million stream deposit within the first four months of the final investment decision. Recognizing the long-term potential at Copper World, Wheaton agreed to provide an additional contingent payment of up to $70 million on a future mill expansion. The terms also amended ongoing payments for gold and silver from fixed pricing to 15% of spot prices to provide Hudbay with upside exposure to higher precious metals prices.
Achieved Balance Sheet Targets to Position for Low-Leverage Project Development
- Hudbay achieved more than $600 million of cash and cash equivalents in mid-2025, before accounting for the proceeds from the joint venture transaction, ahead of schedule. The Company also far exceeded its net debt to adjusted EBITDA
iv
target of less than 1.2x, and as of June 30, 2026, reported a net debt to adjusted EBITDA
iv
of negative 0.1x. Copper World funding plan anticipates approximately $650 million of project-level debt, prudently representing less than 30% project financial leverage, maintaining low consolidated Hudbay debt leverage levels below 1.0x net debt to adjusted EBITDA.
As a result of Hudbay's disciplined capital allocation strategy and prudent funding plan for Copper World, the Company's first capital contribution is deferred to 2028 after Mitsubishi's $600 million initial investment, Wheaton $230 million deposit for the existing precious metals stream, $127 million of equipment financing, approximately $650 million of low-cost debt financing at the asset level, alongside Mitsubishi's future pro-rata equity capital contributions, as shown in Figure 4. This results in an increase in the expected Copper World project's levered IRR to Hudbay to 32% in the Base Case at a long-term price of $5.00 per pound of copper and 44% in the Extension Case at a long-term price of $6.00 per pound of copper.
Hudbay is well-positioned to fund its capital contributions through the Company's existing cash balance, continued free cash flow generation from the existing operations and significant undrawn availability under its credit facilities. Hudbay has recently improved long-term balance sheet resilience with a proactive two-year extension and upsize of the Company's senior secured credit facilities which is expected to close in the fourth quarter. Under the revised terms, the size of the credit facilities has been increased to $700 million from the existing $450 million and the term has been extended from November 2028 to November 2030, providing additional financial flexibility to manage the maturity of the 6.125% coupon 2029 senior unsecured notes and develop the Copper World project. The upsized $700 million revolving credit facility includes an improved pricing grid reflecting the enhanced financial position of Hudbay and features an opportunity to increase the facility by an additional $150 million at Hudbay's discretion during the four-year tenor, providing additional financial flexibility. After adjusting for the expected increase in size of the credit facilities, Hudbay's proforma liquidity as of June 30, 2026 is approximately $1.3 billion.
8
TSX, NYSE - HBM
2026 No. 27
Copper World Generates Significant Social & Environmental Benefits
Global copper market fundamentals are expected to be strong with a structural deficit emerging in the near to medium term. Global mine production is expected to struggle to keep pace with metal demand from electrification and the rapid expansion of datacentres. The U.S. is expected to remain a copper metal importer during this period, and domestic supply will be required to help meet growing U.S. metal demand related to increased manufacturing capacity, infrastructure development, bolstering the country's energy independence and national security needs.
The Copper World project is expected to generate significant benefits for the community and local economy in Arizona through significant job creation, tax revenue, economic development and the ability to produce "Arizona Copper Made for America". Over the anticipated 15-year life of the operation in the Base Case, the Company expects to contribute more than $1.1 billion in total U.S. taxes, including approximately $200 million in taxes to the state of Arizona and $362 million in local property taxes. This increases to $3.7 billion in total U.S. taxes over the 37-year mine life in the Extension Case. Hudbay expects Copper World to create more than 1,000 construction jobs, 500 permanent operating roles and up to 3,000 indirect employment opportunities in Arizona.
Significant engineering work has been advanced on the concentrate leach facility, including the recent completion of a PFS that confirmed the technical viability of the facility for Copper World and the ability to produce copper cathode. Using the Extension Case, the concentrate leach facility adds approximately $226 million to the after-tax net present value (8%), which increases to $377 million at time of sanctioning the construction of the facility, assuming a 10% cathode premium to the long-term copper price of $5.00 per pound. Producing copper cathode is expected to reduce the logistics costs and greenhouse gas emissions associated with overseas shipping, and smelting and refining activities related to copper concentrate The Company will continue to evaluate the concentrate leach facility considering future market conditions, such as premiums for copper metal in the U.S., potential government incentives and the unique strategic opportunity it presents as one of the few fully permitted domestic copper cathode producing facilities in the U.S. Copper World's concentrate leach facility also has the potential to unlock synergies with Hudbay's Cactus project in Arizona.
Non-IFRS Financial Performance Measures
This news release contains certain non-IFRS financial performance measures. Cash cost and sustaining cash cost per pound of copper produced are shown because the Company believes they help investors and management assess the performance of its operations, including the margin generated by the operations and the Company. Unit operating costs are shown because Hudbay believes they help investors and management assess the cost structure and margins that are not impacted by variability in by-product commodity prices. EBITDA is shown to help users analyze Hudbay's results and to provide additional information about the Company's ongoing cash generating potential in order to assess its capacity to service and repay debt, carry out investments and cover working capital needs. These measures are non-GAAP performance measures and do not have a meaning prescribed by IFRS and are therefore unlikely to be comparable to similar measures presented by other issuers. These measures should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS and are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently. For further details on these measures, please refer to Hudbay's management's discussion and analysis for the three and six months ended June 30, 2026 available on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov.
Qualified Person and NI 43-101
The scientific and technical information contained in this news release has been approved by Olivier Tavchandjian, P. Geo, Hudbay's Senior Vice President, Exploration and Technical Services. Mr. Tavchandjian is a qualified person pursuant to Canadian Securities Administrators' National Instrument 43-101 -
Standards of Disclosure for Mineral Projects
("NI 43-101").
9
TSX, NYSE - HBM
2026 No. 27
A copy of the NI 43-101 technical report for the DFS (the "Technical Report") will be filed on Hudbay's SEDAR+ profile at
www.sedarplus.ca
and on Hudbay's EDGAR profile at
www.sec.gov
. The Technical Report supports the disclosure in this news release and will be the current technical report in respect of all the mineral properties that form part of the Copper World project and shall supersede and replace the 2023 PFS in its entirety.
Cautionary Note to United States Investors
This news release has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of United States securities laws. Canadian reporting requirements for disclosure of mineral properties are governed NI 43-101.
For this reason, information contained in this news release in respect of the Copper World project may not be comparable to similar information made public by United States companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. For further information on the differences between the disclosure requirements for mineral properties under the United States federal securities laws and NI 43-101, please refer to the Company's most recent annual information form, a copy of which has been filed under Hudbay's profile on SEDAR+ at www.sedarplus.ca and the Company's most recent Form 40-F, a copy of which has been filed under Hudbay's profile on EDGAR at www.sec.gov.
Cautionary Note Regarding Forward-Looking Information
This news release contains forward-looking information within the meaning of applicable Canadian and United States securities legislation. All information contained in this news release, other than statements of current and historical fact, is forward-looking information. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "expects", "budget", "guidance", "scheduled", "estimates", "forecasts", "strategy", "target", "intends", "objective", "goal", "understands", "anticipates" and "believes" (and variations of these or similar words) and statements that certain actions, events or results "may", "could", "would", "should", "might" "occur" or "be achieved" or "will be taken" (and variations of these or similar expressions). All of the forward-looking information in this news release is qualified by this cautionary note.
Forward-looking information includes, but is not limited to, the results and findings of the DFS, including the production, operating cost, capital cost and cash cost estimates, the projected valuation metrics and rates of return, the cash flow and EBITDA projections, statements regarding the anticipated permitting requirements and project design, including processing and tailings facilities, metal recoveries, mine life and production rates for the Copper World project, the expected funding requirements for the Copper World project, the potential to further enhance the economics of the Copper World project and optimize the design in the future, including with respect to the potential extension of the mine activities onto federal lands as part of the Extension Case described herein and the potential to advance and possibly implement the Concentrate Leach Facility option, the possibility of extending the life of the mine, and the expected social and environmental benefits of the Copper World project, including with respect to the local communities and stakeholders. Forward-looking information is not, and cannot be, a guarantee of future results or events. Forward-looking information is based on, among other things, opinions, assumptions, estimates and analyses that, while considered reasonable by us at the date the forward-looking information is provided, inherently are subject to significant risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the forward-looking information.
The material factors or assumptions that Hudbay identified and were applied by the Company in drawing conclusions or making forecasts or projections set out in the forward-looking information include, but are not limited to:
•
the ability to achieve production and cost estimates described in this news release on expected timelines;
•
the ability to obtain and maintain all required permits and authorizations to develop and operate the Copper World project in accordance with the Base Case presented in this news release;
•
the accuracy of the feasibility and pre-feasibility estimates of costs presented in this news release;
•
no capital cost escalation on the growth capital presented in this news release due to inflationary or other factors;
•
if a decision is made at a future date to pursue the Extension Case, the ability to obtain and maintain all additional permits and authorizations required to develop and operate the Copper World project in accordance with the Extension Case presented in this news release;
10
TSX, NYSE - HBM
2026 No. 27
•
the feasibility of aspects of the Base Case and Extension Case that to date have been completed to pre-feasibility levels;
•
no delays or disruptions due to litigation challenging the permitting requirements, permits, land or other authorizations for the Copper World project and no significant unanticipated litigation;
•
the potential advancement and implementation of the Concentrate Leach Facility;
•
the ability to acquire additional small parcels of land within Copper World's property boundary;
•
the potential extension of the mine activities onto federal lands;
•
the success of exploration and development activities;
•
the accuracy of geological, mining and metallurgical estimates;
•
anticipated metals prices and the costs of production;
•
the supply and demand for metals the Copper World project produces;
•
the supply and availability of groundwater and surface water;
•
the supply and availability of all forms of energy, fuels and other consumables at reasonable prices;
•
no significant unanticipated operational or technical difficulties;
•
the availability of additional financing, if needed;
•
the stability of the joint venture partnership with Mitsubishi;
•
the ability to complete Copper World project targets on time and on budget;
•
the availability of personnel for exploration, development and operational projects and ongoing employee relations;
•
the ability to maintain working relations with the local communities, including the neighbouring communities and local governments in Arizona;
•
no significant unanticipated challenges with Pima County or other stakeholders at Copper World;
•
no significant unanticipated events or changes relating to regulatory, environmental, health and safety matters;
•
no contests over title to Hudbay's properties, including as a result of rights or claimed rights of Indigenous peoples or challenges to the validity of its unpatented mining claims;
•
the ability to receive the upfront stream deposit of $230 million from Wheaton at the commencement of construction in accordance with the amended and restated precious metals purchase agreement;
•
no disputes in respect of agreements that were previously entered into by Augusta Resource Corporation ("Augusta") in respect of the former Rosemont Copper project;
•
certain tax matters, including, but not limited to the mining tax regime in Arizona; and
•
no significant and continuing adverse changes in general economic conditions or conditions in the financial markets (including commodity prices and foreign exchange rates).
The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information may include, but are not limited to, risks generally associated with the mining industry and the current geopolitical environment, including future commodity prices, currency and interest rate fluctuations, water availability, energy and consumable prices, supply chain constraints and general cost escalation in the current inflationary environment, risks related to project delivery and financing; risks and uncertainties related to obtaining the permit amendments required to implement the expansion projects contemplated in the Base Case; risks and uncertainties related to the pre-feasibility study level of the engineering and cost estimates in respect of the expansion projects included in the Base Case; ongoing and potential litigation processes and other legal challenges that could affect the Copper World project (including in respect of any future authorizations or agreements that may be required), risks related to acquiring additional small parcels of land within Copper World's property boundary, risks related to political or social instability and changes in government and government policy, risks related to changes in law, risks in respect of community relations, risks related to contracts that were entered into by Augusta in respect of the former Rosemont Copper project, uncertainties related to the geology, continuity, grade and estimates of mineral reserves and resources, and the potential for variations in grade and recovery rates, risks related to the timing and implementation of the Concentrate Leach Facility, climate change related risks and uncertainties, as well as the risks discussed elsewhere in the Technical Report, under the heading "Risk Factors" in Hudbay's most recent annual information form and under the heading "Financial Risk Management" in Hudbay's most recent annual management's discussion and analysis.
Should one or more risk, uncertainty, contingency or other factor materialize or should any factor or assumption prove incorrect, actual results could vary materially from those expressed or implied in the forward-looking information. Accordingly, you should not place undue reliance on forward-looking information. The Company does not assume any obligation to update or revise any forward-looking information after the date of this news release or to explain any material difference between subsequent actual events and any forward-looking information, except as required by applicable law.
11
TSX, NYSE - HBM
2026 No. 27
About Hudbay
Hudbay (TSX, NYSE: HBM) is a copper-focused critical minerals mining company with three long-life operations and a world-class pipeline of copper growth projects in tier-one mining jurisdictions of Canada, Peru and the United States.
Hudbay's operating portfolio includes the Constancia mine in Cusco (Peru), the Snow Lake operations in Manitoba (Canada) and the Copper Mountain mine in British Columbia (Canada). Copper is the primary metal produced by the Company, which is complemented by meaningful gold production and by-product zinc, silver and molybdenum. Hudbay's growth pipeline includes the Copper World project in Arizona (United States), the Cactus project in Arizona (United States), the Mason project in Nevada (United States), the Llaguen project in La Libertad (Peru) and several expansion and exploration opportunities near its existing operations.
The value Hudbay creates and the impact it has is embodied in its purpose statement: "We care about our people, our communities and our planet. Hudbay provides the metals the world needs. We work sustainably, transform lives and create better futures for communities." Hudbay's mission is to create sustainable value and strong returns by leveraging its core strengths in community relations, focused exploration, mine development and efficient operations.
For further information, please contact:
Candace Brûlé
Senior Vice President, Capital Markets & Corporate Affairs
(416) 362-8181
investor.relations@hudbay.com
____________________
i
By-products calculated assuming the following long-term commodity prices: gold stream price of $540 per ounce (representing 15% of market price), silver stream price of $6.75 per ounce (representing 15% of market price), and molybdenum price of $17.50 per pound. By-product credits calculated using amortization of deferred revenue for gold and silver stream sales as per the Company's approach in its quarterly financial reporting. Sustaining cash costs includes sustaining capital expenditures, equipment financing and royalties. Cash costs and sustaining cash costs are non-GAAP financial performance measures with no standardized definition under IFRS. For further details on why Hudbay believes cash costs are a useful performance indicator, please refer to the Company's most recent Management's Discussion and Analysis for the three and six months ended June 30, 2026.
ii
Cost comparison based on U.S. open pit copper mines 2025 actual cash costs sourced from public disclosure, compared to the Copper World project Base Case 8-year post-expansion average cash cost.
iii
Total initial growth capital expenditures less $127 million of equipment financing. Equipment financing payments are incorporated in sustaining cash costs.
iv
EBITDA and net debt to EBITDA are non-GAAP financial performance measures with no standardized definition under IFRS. For further information, please refer to the Company's most recent Management's Discussion and Analysis for the three and six months ended June 30, 2026.
v
Peer comparison data of greenfield, open pit, copper porphyry sulphide projects with reserves located in the Americas and LOM average Cu production of +60ktpa. Sourced from public disclosure as of October 2026.
v
i
Concentrate leach facility after-tax net present value (8%) at time of sanctioning the construction of the facility and assumes a 10% cathode premium in the U.S. in the Extension Case.
12
TSX, NYSE - HBM
2026 No. 27
Exhibit 1: Copper World Detailed Cash Flow Model and Key Assumptions - Base Case
A detailed cash flow model containing annual production and cost information is shown below. Overall assumptions for commodity prices, marketing parameters, operating costs and capital costs are also provided.
BASE CASE -
Production
Unit
LOM
Y-03
Y-02
Y-01
Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Material Moved
1
Ore mined
Mtonne
401
-
0.9
6.1
23.8
29.5
35.7
36.5
39.4
38.4
41.0
31.0
29.3
34.3
42.1
12.5
-
-
-
Waste mined
Mtonne
589
-
3.5
22.6
28.2
54.6
64.1
63.3
60.4
61.2
58.8
68.5
61.1
38.0
4.3
0.1
-
-
-
Rehandle
Mtonne
131
-
-
-
3.6
4.1
6.5
4.6
5.8
1.1
-
5.8
5.2
1.0
-
17.0
29.5
29.7
17.6
Total Material Moved
Mtonne
1,121
-
4.4
28.8
55.6
88.2
106.3
104.4
105.5
100.7
99.8
105.3
95.6
73.2
46.4
29.6
29.5
29.7
17.6
Strip Ratio
waste:ore
1.47
-
3.80
3.69
1.18
1.85
1.79
1.73
1.53
1.59
1.43
2.21
2.09
1.11
0.10
0.01
-
-
-
Ore Milled
Ore milled
Mtonne
389
-
-
-
15.0
19.8
19.9
19.9
29.8
29.6
29.8
29.9
29.8
29.8
29.8
29.4
29.5
29.7
17.6
Copper head grade
%
0.47
-
-
-
0.66
0.64
0.49
0.49
0.62
0.78
0.50
0.45
0.42
0.49
0.63
0.41
0.17
0.15
0.14
Gold head grade
g/tonne
0.03
-
-
-
0.02
0.02
0.02
0.01
0.03
0.04
0.04
0.02
0.02
0.03
0.05
0.03
0.01
0.01
0.01
Silver head grade
g/tonne
5.60
-
-
-
4.46
3.90
3.92
5.37
8.28
9.94
5.96
4.77
5.19
5.95
8.53
5.61
3.21
3.14
2.82
Molybdenum head grade
%
0.01
-
-
-
0.02
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
Recovery
Copper recovery
%
73.8
-
-
-
56.7
65.2
72.6
76.6
73.7
78.3
76.7
71.8
74.5
77.1
80.3
76.8
70.4
67.3
66.4
Gold recovery
%
56.8
-
-
-
38.7
35.5
31.3
36.8
58.5
62.8
62.9
57.2
58.2
61.8
62.9
56.9
59.9
50.5
46.3
Silver recovery
%
55.3
-
-
-
39.0
53.0
55.5
58.2
54.8
56.0
56.1
57.2
56.5
55.9
56.1
54.1
56.6
57.1
53.1
Molybdenum recovery
%
35.6
-
-
-
-
34.7
32.7
35.1
41.8
41.5
39.4
38.9
37.0
35.5
36.9
41.0
36.8
42.0
40.6
Concentrate Production
Copper concentrate
Ktonne
5,424
-
-
-
224
333
310
308
518
687
450
389
381
467
595
361
185
137
81
Cu Concentrate grade
% Cu
24.76
-
-
-
24.92
24.83
23.01
24.25
26.18
26.36
25.36
25.04
24.35
24.37
25.31
25.37
19.28
21.39
20.84
Molybdenum concentrate
Ktonne
29
-
-
-
-
1.9
1.9
1.5
3.0
2.6
3.2
2.3
2.3
1.9
2.3
2.4
1.2
1.4
0.8
Mo Concentrate grade
% Mo
50
-
-
-
-
50
50
50
50
50
50
50
50
50
50
50
50
50
50
Contained Metal in Concentrate Produced
Copper
Ktonne
1,343
-
-
-
56
83
71
75
136
181
114
97
93
114
150
92
36
29
17
Gold
Koz
179
-
-
-
4
4
3
3
16
22
22
13
14
18
28
17
8
5
3
Silver
Koz
38,736
-
-
-
836
1,314
1,389
1,999
4,345
5,305
3,199
2,620
2,811
3,190
4,580
2,871
1,722
1,709
847
Molybdenum
Ktonne
14
-
-
-
-
0.9
0.9
0.8
1.5
1.3
1.6
1.1
1.2
0.9
1.2
1.2
0.6
0.7
0.4
Copper Eq. Production
Ktonne
1,609
-
-
-
60
92
81
87
164
215
140
116
113
136
182
113
47
40
23
1
Material moved includes pre-stripping shown in Y-02 and Y-01
13
TSX, NYSE - HBM
2026 No. 27
BASE CASE -
Unit Costs
1,3
Unit
LOM
Y-03
Y-02
Y-01
Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Mining
Mining
$/tonne moved
1.56
-
-
-
1.77
1.47
1.27
1.39
1.41
1.45
1.57
1.47
1.57
1.80
2.22
2.45
1.61
1.42
1.81
Mining (ex. capitalized stripping)
$/tonne moved
1.37
-
-
-
1.46
1.08
0.91
0.84
1.41
1.44
1.57
1.20
1.33
1.80
2.22
2.45
1.61
1.42
1.81
Processing
Processing
$/tonne milled
6.34
-
-
-
7.14
6.74
6.86
6.89
6.18
6.20
6.17
6.16
6.19
6.19
6.22
6.30
6.28
6.24
6.22
Onsite G&A
Onsite G&A
$/tonne milled
0.80
-
-
-
1.49
1.04
1.04
1.03
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.70
0.70
0.69
1.17
Cost per pound of copper produced, net of by-product credits
Cash cost
2
$/lb
1.70
-
-
-
2.38
1.76
2.01
1.85
1.44
1.12
1.62
1.83
1.89
1.63
1.10
1.46
3.31
3.72
4.32
Sustaining cash cost
2
$/lb
2.21
-
-
-
3.82
2.46
2.83
2.95
1.77
1.42
1.98
2.40
2.41
2.16
1.38
1.75
3.71
4.19
4.79
1
Mining unit exclude pre-stripping costs that are presented as part of initial growth capital
2
By-product credits calculated using amortization of deferred revenue for gold and silver stream sales as per the Company's approach in its quarterly financial reporting.
3
Cash cost and sustaining cash costs, net of by-product credits, per pound of copper produced are non-GAAP financial performance measures with no standardized definition under IFRS. For further information, please refer to the Company's most recent Management's Discussion and Analysis for the three and six months ended June 30, 2026.
14
TSX, NYSE - HBM
2026 No. 27
BASE CASE -
Cash Flow
Unit
LOM
Y-03
Y-02
Y-01
Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Cash generated from operating activities
Gross Revenue
$M
15,158
-
-
-
654
940
796
830
1,529
2,014
1,300
1,098
1,048
1,267
1,680
1,044
410
347
199
Treatment & refining costs
$M
(577)
-
-
-
(17)
(29)
(27)
(27)
(80)
(64)
(45)
(43)
(42)
(50)
(65)
(41)
(20)
(16)
(9)
Mining operating cost
$M
(1,493)
-
-
-
(81)
(96)
(97)
(88)
(149)
(145)
(157)
(126)
(127)
(132)
(103)
(72)
(47)
(42)
(32)
Processing cost
$M
(2,469)
-
-
-
(107)
(133)
(136)
(137)
(184)
(184)
(184)
(184)
(185)
(185)
(185)
(185)
(185)
(185)
(109)
Onsite G&A cost
$M
(310)
-
-
-
(22)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
Freight and transportation
$M
(971)
-
-
-
(40)
(60)
(55)
(55)
(93)
(123)
(81)
(70)
(68)
(84)
(106)
(65)
(33)
(25)
(15)
Royalties and other
$M
(417)
-
-
-
(20)
(28)
(24)
(26)
(47)
(63)
(42)
(35)
(33)
(40)
(54)
(34)
(14)
(13)
(8)
Taxes
1
$M
(1,126)
(57)
-
-
(34)
(32)
(31)
(29)
(49)
(132)
(96)
(77)
(93)
(138)
(230)
(119)
(4)
(2)
(2)
Closure cost
2
$M
(138)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Change in trade and other receivables and payables
$M
-
91
73
(48)
(79)
(41)
57
30
(109)
(16)
40
10
6
(3)
(24)
16
18
2
(6)
Change in stream deposit
$M
300
230
-
-
-
-
-
-
70
-
-
-
-
-
-
-
-
-
-
Operating Cash Flow
$M
7,956
264
73
(48)
253
500
462
477
867
1,266
716
553
485
615
892
523
103
46
(2)
Cash used in investing activities
Growth capital
$M
(2,907)
(498)
(996)
(704)
(25)
-
(242)
(443)
-
-
-
-
-
-
-
-
-
-
-
Sustaining capital
$M
(629)
-
-
-
(197)
(29)
(64)
(49)
(21)
(47)
(29)
(30)
(32)
(68)
(20)
(16)
(10)
(10)
(7)
Capitalized stripping
$M
(199)
-
-
-
(17)
(34)
(38)
(58)
-
(1)
-
(29)
(23)
-
-
-
-
-
-
Cash from Investing
$M
(3,736)
(498)
(996)
(704)
(239)
(63)
(344)
(550)
(21)
(47)
(29)
(59)
(55)
(68)
(20)
(16)
(10)
(10)
(7)
Cash used in financing activities
Equipment financing
$M
404
2
77
49
75
0
35
1
37
44
38
1
21
2
3
14
1
0
2
Equipment financing payments
3
$M
(486)
-
(1)
(19)
(31)
(49)
(49)
(57)
(38)
(36)
(28)
(37)
(29)
(34)
(25)
(15)
(10)
(10)
(5)
Cash from Financing
$M
(81)
2
76
30
45
(49)
(14)
(56)
(1)
9
9
(36)
(8)
(32)
(23)
(1)
(9)
(9)
(3)
Net Cash Flow
$M
4,139
(231)
(847)
(722)
59
389
104
(128)
845
1,227
696
458
422
515
850
506
84
26
(12)
Financial Return Metrics
Net Present Value (8%)
$M
1,241
Net Present Value (10%)
$M
845
Internal Rate of Return
%
16.8%
1
Taxes include federal, state and property taxes.
2
Post closure costs are reflected in the cash flows starting in year 16.
3
Equipment financing payments include principal and interest.
15
TSX, NYSE - HBM
2026 No. 27
Exhibit 2: Copper World Detailed Cash Flow Model and Key Assumptions - Extension Case
A detailed cash flow model containing annual production and cost information is shown below. Overall assumptions for commodity prices, marketing parameters, operating costs and capital costs are also provided.
EXTENSION -
Production
Unit
LOM
Y-03
Y-02
Y-01
Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Y16
Y17
Y18
Y19
Y20
Y21
Y22
Y23
Y24
Y25
Y26
Y27
Y28
Y29
Y30
Y31
Y32
Y33
Y34
Y35
Y36
Y37
Material Moved
1
Ore Mined
Mtonne
1,047.6
-
1.1
6.6
25.5
38.0
39.2
36.5
40.8
38.1
38.6
37.1
30.9
32.9
37.0
34.1
38.5
35.6
24.3
25.2
35.4
43.3
43.0
36.6
37.0
34.7
27.2
38.6
41.7
37.4
38.4
33.8
31.0
9.4
-
-
-
-
-
-
-
Waste Mined
Mtonne
1,879.5
-
3.3
19.7
26.0
61.8
60.6
54.2
59.0
55.1
58.5
61.6
56.1
94.1
90.0
92.9
86.7
91.4
102.7
101.8
91.6
83.7
84.0
90.4
90.0
81.6
86.7
40.3
19.5
12.7
8.0
5.5
7.0
3.0
-
-
-
-
-
-
-
Rehandle
Mtonne
266.9
-
-
-
-
-
-
1.9
5.5
0.3
0.6
2.5
3.6
4.9
-
-
-
-
11.0
10.4
-
-
-
-
-
-
7.5
-
-
-
-
-
-
20.4
29.8
29.8
29.8
29.8
29.8
29.8
19.4
Total Material Moved
Mtonne
3,194.0
-
4.4
26.3
51.5
99.8
99.8
92.6
105.3
93.5
97.7
101.3
90.6
131.9
127.0
127.0
125.3
127.0
138.0
137.4
127.0
127.0
127.0
127.0
127.0
116.2
121.4
78.8
61.1
50.1
46.4
39.3
38.0
32.8
29.8
29.8
29.8
29.8
29.8
29.8
19.4
Strip ratio
waste: ore
1.79
-
2.98
2.99
1.02
1.63
1.55
1.49
1.45
1.45
1.52
1.66
1.81
2.86
2.44
2.73
2.25
2.57
4.22
4.04
2.59
1.93
1.95
2.47
2.43
2.35
3.18
1.04
0.47
0.34
0.21
0.16
0.23
0.32
-
-
-
-
-
-
-
Ore Milled
Ore milled
Mtonne
1,047.6
-
-
-
14.9
19.9
19.9
19.9
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
29.8
19.4
Copper head grade
%
0.42
-
-
-
0.59
0.68
0.50
0.48
0.60
0.78
0.47
0.50
0.44
0.45
0.58
0.64
0.63
0.56
0.34
0.32
0.42
0.57
0.56
0.57
0.50
0.46
0.37
0.42
0.38
0.32
0.34
0.34
0.30
0.28
0.20
0.20
0.19
0.14
0.14
0.17
0.17
Gold head grade
g/tonne
0.02
-
-
-
0.02
0.02
0.01
0.01
0.03
0.03
0.03
0.02
0.03
0.02
0.04
0.04
0.03
0.02
0.02
0.01
0.02
0.02
0.02
0.03
0.03
0.03
0.02
0.02
0.02
0.02
0.03
0.03
0.02
0.02
0.01
0.01
0.01
0.01
0.01
0.01
0.01
Silver head grade
g/tonne
4.34
-
-
-
4.39
3.58
3.95
4.55
7.14
9.23
5.31
4.74
5.36
4.49
5.96
8.14
5.31
5.42
3.00
2.59
2.95
4.12
4.62
5.54
4.79
5.16
3.29
3.22
4.41
4.02
4.09
4.66
4.71
4.48
2.32
2.29
2.27
2.02
2.10
2.75
2.75
Molybdenum head grade
%
0.01
-
-
-
0.02
0.02
0.02
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.02
0.02
0.01
0.02
0.01
0.01
0.02
0.02
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
Recovery
Copper recovery
%
74.9
-
-
-
57.1
66.3
73.4
75.2
72.9
78.6
77.5
70.1
74.5
70.0
78.4
81.3
79.0
74.0
73.6
72.6
67.7
72.8
73.3
78.0
80.7
82.3
73.3
74.7
77.4
79.0
82.3
83.7
85.3
77.8
66.4
66.4
67.2
76.4
74.5
58.5
58.5
Gold recovery
%
60.1
-
-
-
40.8
32.5
32.8
37.4
58.3
62.6
62.4
61.1
60.3
58.9
62.9
62.9
62.9
61.8
57.0
56.0
62.9
62.8
62.9
62.9
62.9
62.9
62.2
62.9
62.9
62.9
62.9
62.9
62.9
61.7
56.6
56.3
56.5
58.3
58.1
56.9
56.9
Silver recovery
%
55.6
-
-
-
39.9
51.7
56.9
56.2
55.4
56.0
56.0
56.0
56.0
55.2
56.1
56.1
56.1
55.2
55.2
54.1
56.1
56.0
56.1
56.1
56.1
56.1
56.0
56.1
56.1
56.1
56.1
56.1
56.1
56.0
56.2
56.2
56.2
56.1
56.0
54.9
54.9
Molybdenum recovery
%
36.2
-
-
-
-
33.3
33.1
35.2
41.8
41.5
39.3
38.3
38.0
36.8
34.4
39.7
34.2
36.7
40.1
38.7
37.1
35.8
34.1
32.2
34.1
36.6
33.9
32.7
34.3
33.7
36.2
39.2
46.4
38.4
38.4
38.5
38.2
36.1
36.4
43.3
43.3
Concentrate Production
Copper concentrate
Ktonne
13,718
-
-
-
201
367
311
297
500
694
434
417
395
388
558
600
599
489
298
320
352
495
508
569
504
466
360
430
395
351
358
351
305
277
185
182
182
184
178
132
86
Cu Concentrate grade
% Cu
23.95
-
-
-
24.99
24.55
23.60
24.19
26.16
26.34
25.26
25.12
24.78
24.40
24.52
25.69
24.63
25.14
24.68
21.86
24.29
24.91
24.25
23.47
23.75
24.40
22.45
21.69
21.99
21.53
23.09
24.27
25.39
23.56
21.61
21.55
21.26
16.88
17.46
22.44
22.44
Molybdenum concentrate
Ktonne
91.3
-
-
-
-
2.0
2.1
1.4
3.1
2.5
3.0
2.1
2.3
1.7
2.3
2.3
2.8
3.2
2.9
2.0
2.0
3.0
2.5
2.7
4.4
4.0
2.5
3.0
2.9
2.6
4.7
5.2
3.5
2.6
1.7
1.7
1.6
1.5
1.4
1.2
0.8
Mo Concentrate grade
% Mo
50
-
-
-
-
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
Contained Metal in Concentrate Produced
Copper
Ktonne
3,286
-
-
-
50
90
73
72
131
183
110
105
98
95
137
154
148
123
74
70
85
123
123
133
120
114
81
93
87
75
83
85
77
65
40
39
39
31
31
30
19
Gold
Koz
436
-
-
-
4
3
3
3
15
19
20
14
15
12
21
22
21
14
9
6
9
13
14
16
16
17
10
11
13
14
17
16
13
11
7
7
7
8
7
5
4
Silver
Koz
81,257
-
-
-
841
1,181
1,435
1,632
3,789
4,956
2,848
2,542
2,876
2,372
3,203
4,374
2,853
2,866
1,584
1,344
1,587
2,214
2,479
2,974
2,574
2,772
1,765
1,731
2,371
2,159
2,196
2,504
2,531
2,403
1,246
1,235
1,223
1,085
1,124
1,447
942
Molybdenum
Ktonne
45.6
-
-
-
-
1.0
1.0
0.7
1.5
1.3
1.5
1.1
1.1
0.9
1.1
1.2
1.4
1.6
1.4
1.0
1.0
1.5
1.3
1.4
2.2
2.0
1.3
1.5
1.4
1.3
2.4
2.6
1.8
1.3
0.9
0.8
0.8
0.7
0.7
0.6
0.4
Copper Eq. Production
Ktonne
3,919
-
-
-
55
99
84
82
157
214
133
123
118
111
161
183
171
145
88
81
98
142
142
156
143
138
96
109
106
93
106
110
98
83
50
49
49
41
41
39
26
1
Material moved includes pre-stripping shown in Y-02 and Y-01
16
TSX, NYSE - HBM
2026 No. 27
EXTENSION - Unit Costs
1,3
Unit
LOM
Y-03
Y-02
Y-01
Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Y16
Y17
Y18
Y19
Y20
Y21
Y22
Y23
Y24
Y25
Y26
Y27
Y28
Y29
Y30
Y31
Y32
Y33
Y34
Y35
Y36
Y37
Mining
1
Mining
$/tonne moved
1.41
-
-
-
1.92
1.42
1.31
1.40
1.34
1.44
1.39
1.37
1.47
1.29
1.26
1.32
1.26
1.23
1.15
1.23
1.33
1.24
1.21
1.25
1.30
1.37
1.35
1.75
1.93
2.13
2.21
2.47
2.50
2.08
1.53
1.37
1.34
1.31
1.30
1.20
1.48
Mining (ex. capitalized stripping)
$/tonne moved
1.21
-
-
-
1.59
1.11
0.88
1.01
1.34
1.44
1.39
1.37
1.47
0.88
1.08
1.05
1.14
0.91
0.61
0.53
1.09
1.24
1.21
1.06
1.11
1.21
0.98
1.75
1.93
2.13
2.21
2.47
2.50
2.08
1.53
1.37
1.34
1.31
1.30
1.20
1.48
Processing
Processing
$/tonne milled
6.40
-
-
-
7.14
6.71
6.86
6.90
6.18
6.17
6.17
6.17
6.19
6.19
6.42
6.42
6.42
6.42
6.42
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.40
6.46
Onsite G&A
Onsite G&A
$/tonne milled
0.73
-
-
-
1.49
1.04
1.04
1.04
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
1.06
Cost per pound of copper produced, net of by-product credits
Cash cost
2
$/lb
1.94
-
-
-
2.63
1.75
1.91
2.02
1.52
1.29
1.75
1.94
1.99
2.14
1.57
1.38
1.47
1.64
2.28
2.49
2.39
1.81
1.83
1.66
1.71
1.64
2.34
2.23
2.04
2.23
1.80
1.65
1.90
2.12
3.21
3.19
3.05
3.84
3.82
3.84
4.19
Sustaining cash cost
2
$/lb
2.38
-
-
-
4.22
2.39
2.73
2.88
1.87
1.55
2.06
2.29
2.37
2.86
1.96
1.77
1.78
2.09
3.08
3.52
2.91
2.09
2.10
2.02
2.09
2.05
3.00
2.57
2.38
2.55
2.10
1.95
2.22
2.45
3.60
3.54
3.39
4.21
4.19
4.22
4.60
1
Mining unit costs exclude pre-stripping costs that are presented as part of initial growth capital
2
By-product credits calculated using amortization of deferred revenue for gold and silver stream sales as per the Company's approach in its quarterly financial reporting.
3
Cash cost and sustaining cash costs, net of by-product credits, per pound of copper produced are non-GAAP financial performance measures with no standardized definition under IFRS. For further information, please refer to the Company's most recent Management's Discussion and Analysis for the three and six months ended June 30, 2026.
17
TSX, NYSE - HBM
2026 No. 27
EXTENSION -
Cash Flow
Unit
LOM
Y-03
Y-02
Y-01
Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Y14
Y15
Y16
Y17
Y18
Y19
Y20
Y21
Y22
Y23
Y24
Y25
Y26
Y27
Y28
Y29
Y30
Y31
Y32
Y33
Y34
Y35
Y36
Y37
Y38
Y39
Y40
Cash generated from operating activities
Gross Revenue
$M
37,248
-
-
-
589
1,023
822
796
1,478
2,029
1,246
1,171
1,103
1,054
1,519
1,715
1,643
1,386
847
786
956
1,383
1,373
1,487
1,371
1,306
915
1,056
991
863
985
1,023
910
760
464
455
449
361
361
346
225
-
-
-
Treatment & refining costs
$M
(1,784)
-
-
-
(16)
(32)
(28)
(26)
(76)
(100)
(43)
(45)
(44)
(63)
(59)
(65)
(63)
(80)
(51)
(53)
(55)
(78)
(80)
(90)
(86)
(53)
(58)
(79)
(43)
(38)
(44)
(44)
(38)
(33)
(21)
(20)
(20)
(19)
(19)
(16)
(10)
-
-
-
Mining operating cost
$M
(3,842)
-
-
-
(82)
(111)
(88)
(93)
(142)
(135)
(136)
(139)
(133)
(116)
(138)
(133)
(143)
(116)
(85)
(73)
(139)
(158)
(153)
(135)
(142)
(140)
(119)
(138)
(118)
(106)
(102)
(97)
(95)
(68)
(46)
(41)
(40)
(39)
(39)
(36)
(29)
-
-
-
Processing cost
$M
(6,705)
-
-
-
(107)
(133)
(136)
(137)
(184)
(184)
(184)
(184)
(185)
(185)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(191)
(125)
-
-
-
Onsite G&A cost
$M
(763)
-
-
-
(22)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
(21)
-
-
-
Freight and transportation
$M
(2,457)
-
-
-
(36)
(66)
(56)
(53)
(90)
(124)
(78)
(75)
(71)
(69)
(100)
(107)
(107)
(88)
(53)
(57)
(63)
(89)
(91)
(102)
(90)
(84)
(64)
(77)
(71)
(63)
(64)
(63)
(55)
(50)
(33)
(33)
(33)
(33)
(32)
(24)
(15)
-
-
-
Royalties and other
$M
(1,109)
-
-
-
(19)
(31)
(25)
(25)
(46)
(62)
(40)
(37)
(36)
(32)
(48)
(54)
(51)
(42)
(26)
(24)
(29)
(41)
(41)
(44)
(41)
(41)
(28)
(31)
(32)
(28)
(32)
(33)
(30)
(25)
(16)
(16)
(15)
(13)
(13)
(13)
(9)
58
-
-
Taxes
1
$M
(3,713)
(57)
-
-
(34)
(33)
(31)
(29)
(48)
(137)
(106)
(113)
(123)
(89)
(186)
(233)
(228)
(176)
(74)
(54)
(95)
(189)
(188)
(204)
(179)
(171)
(87)
(119)
(118)
(97)
(121)
(129)
(107)
(82)
(28)
(27)
(16)
(2)
(2)
(2)
(2)
-
-
-
Closure cost
2
$M
(194)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(57)
(57)
(30)
Change in trade & other receivables and payables
$M
1
91
74
(51)
(72)
(48)
51
35
(103)
(22)
42
7
14
43
(42)
(22)
2
7
20
1
(5)
(13)
0
3
1
(4)
14
(7)
(1)
2
(6)
(3)
3
2
6
(0)
(2)
4
(1)
(1)
(5)
(7)
-
(9)
Change in stream deposit
$M
300
230
-
-
-
-
-
-
70
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Operating Cash Flow
$M
16,981
264
74
(51)
201
549
489
448
839
1,244
682
566
506
523
735
888
842
681
366
315
359
604
610
703
623
602
362
393
397
322
405
443
378
292
115
107
111
48
45
44
9
(6)
(57)
(39)
Cash used in investing activities
Growth capital
$M
(3,300)
(498)
(1,005)
(692)
(25)
-
(242)
(443)
-
-
-
-
-
(276)
(118)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Sustaining capital
$M
(1,186)
-
-
-
(197)
(31)
(27)
(34)
(32)
(30)
(24)
(27)
(80)
(35)
(29)
(38)
(37)
(27)
(42)
(27)
(28)
(30)
(31)
(66)
(49)
(27)
(27)
(22)
(27)
(19)
(15)
(16)
(18)
(17)
(13)
(14)
(11)
(12)
(10)
(11)
(8)
-
-
-
Capitalized stripping
$M
(604)
-
-
-
(17)
(31)
(43)
(37)
-
-
-
-
-
(54)
(23)
(35)
(14)
(40)
(74)
(96)
(30)
-
-
(24)
(23)
(19)
(45)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Cash from Investing
$M
(5,090)
(498)
(1,005)
(692)
(238)
(62)
(311)
(513)
(32)
(30)
(24)
(27)
(80)
(365)
(170)
(73)
(51)
(68)
(116)
(123)
(58)
(30)
(31)
(89)
(71)
(46)
(72)
(22)
(27)
(19)
(15)
(16)
(18)
(17)
(13)
(14)
(11)
(12)
(10)
(11)
(8)
-
-
-
Cash used in financing activities
Equipment financing
$M
643
2
85
40
74
1
1
1
41
26
36
1
52
0
5
16
14
5
42
2
5
13
15
42
31
4
3
5
13
22
11
3
4
5
6
5
1
2
2
3
1
1
-
-
Equipment financing payments
3
$M
(773)
-
(1)
(21)
(31)
(48)
(49)
(48)
(28)
(29)
(17)
(25)
(25)
(38)
(28)
(23)
(18)
(21)
(10)
(20)
(19)
(16)
(16)
(19)
(18)
(26)
(25)
(23)
(20)
(14)
(11)
(13)
(13)
(13)
(11)
(7)
(5)
(5)
(5)
(4)
(3)
(2)
(2)
(2)
Cash from Financing
$M
(130)
2
85
19
44
(47)
(48)
(47)
13
(2)
19
(24)
27
(37)
(23)
(7)
(4)
(16)
33
(18)
(14)
(3)
(1)
23
13
(22)
(22)
(18)
(7)
9
(0)
(11)
(9)
(8)
(5)
(2)
(5)
(3)
(3)
(1)
(2)
(1)
(2)
(2)
Net Cash Flow
$M
11,762
(231)
(846)
(725)
7
440
130
(113)
820
1,212
676
515
453
121
542
809
787
598
283
173
288
571
578
637
564
534
268
353
363
311
389
417
351
268
97
91
95
33
32
32
(0)
(6)
(59)
(40)
Financial Return Metrics
Net Present Value (8%)
$M
2,510
Net Present Value (10%)
$M
1,685
Internal Rate of Return
%
18.8
1
Taxes include federal, state and property taxes.
2
Post closure costs are reflected in the cash flows starting in year 38.
3
Equipment financing payments include principal and interest.
18
TSX, NYSE - HBM
2026 No. 27
Figure 1: Copper World Base Case Site Plan Layout
Copper World is designed as a conventional open-pit, truck-and-shovel mining operation across four primary pits, East, Broadtop, West, and Peach-Elgin. The overall mine plan integrates essential supporting infrastructure, including waste rock facilities (WRFs), grade-segregated ore stockpiles, a tailings storage facility (TSF), and an in-pit crushing and conveying (IPCC) system.
19
TSX, NYSE - HBM
2026 No. 27
Figure 2: Copper World Production and Operating Cost Profile
Following the concentrator expansion in year five, annual copper production increases to an average of 122,000 tonnes between year five and year twelve in the Base Case, and that elevated profile further extends to beyond year 20 in the Extension Case.
20
TSX, NYSE - HBM
2026 No. 27
Figure 3: Copper World Attractive Capital Intensity
Copper World continues to be well-positioned when compared to peer copper projects and recently completed builds.
21
TSX, NYSE - HBM
2026 No. 27
Figure 4: Hudbay's First Capital Contribution Deferred to 2028
Hudbay has executed a prudent financial strategy for the funding of Copper World, including a minority joint venture transaction with Mitsubishi, a renegotiated precious metals stream agreement with Wheaton and plans to implement low-cost debt financing at the asset level, resulting in Hudbay's first capital contribution not expected until 2028 and an increase in the expected levered IRR to Hudbay to 32% in the Base Case.
22
决策记录链 · 只追加
每次领取产生一条记录,重新决策追加一条并以 supersedes 指向被替代的记录(ADR 0014)。
59abfcfe55· 2026-10-22 06:46 · doubao / doubao-seed-evolving-latest-version · 策略包658c0c1e2ba5当前