🇺🇸 SECTRX GOLD CorpDoubao · 实盘可交易 · 做多市场:加股▲ 赚 +14.19% · 浮动把握 5/10
北京时间·🕒 发布 18:30:04·⟳ 抓取 18:30:47 +43s·⚡ 决策 09-14 18:33:49 +3m02s·42.9 天前
TRX Gold:Q4产量创纪录、全年达指引上限,并获纳入MVIS全球初级金矿商指数
一手6-K确认产量达指引上限、金价创纪录与指数纳入三重实质利好;股价近20日仅+7.5%且呈震荡、未抢跑,存在短期事件驱动edge;但财务数据为初步、类比先例显示纳入利好第2日后易回落,故以小仓、短持有期参与。
📄 原文TRX GOLD Corp↗ 原文
----- exh_991.htm ----- EX-99.1 2 exh_991.htm PRESS RELEASE EdgarFiling EXHIBIT 99.1 TRX Gold Delivers Record Q4 2026;…
浮动 +14.19%入场 09-14 当日开盘 @1.550 → 等下一常规开盘离场,浮动至 09-17 收盘
日 K 取自复盘打分切片 · 蓝点/蓝虚线 = 纸面入场价 · 灰虚线 = 纸面离场 · 持有期红底 = 赚(价格在入场线上方)、绿底 = 亏
💡 交易逻辑产量达指引上限+金价创纪录+纳入GDXJ标的指数,事件新鲜且未抢跑
怎么买 开盘买入 不高于昨收 +5%(超上限不成交)
怎么卖 止盈 +5%(半仓)/+9%(清仓) · 止损 -7% · 时间止损 4日
不做 TRX Gold Corporation(TRX.US)
NYSE American盘前买卖价差约20%、成交极薄,同一敞口改由TSX主上市TRX.TO执行
展开详情(成交明细 / 研究档案 / 原文全文 / 决策记录链)
分时走势
做多 TRX.CA TRX Gold Corporation
该市场暂无分钟数据,保留日线图
成交明细 · 纸面
做多 TRX.CA TRX Gold Corporation
| 收益状态 | 无法定价 no_provider |
|---|---|
| 进场成交 | 2026-09-14 · 当日开盘 · @1.55 · 成交 31% |
| 离场成交 | — |
| 浮动(最新收盘) | +14.19% |
| 建仓日 | 2026-09-14 · 进场不早于新闻时刻 + 2 分钟 |
收益口径 event_time_plus_2min_10min_walk_open_topup_to_next_open_exchange_calendar_fill_model_local_notional_v9 · method_id m8db1cbc8f2d · 截至 2026-10-27 16:44
研究档案
结论摘要
TRX Gold Q4产量8,173盎司创纪录、全年产量达指引上限,叠加金价约4,386美元/盎司与MVGDXJ纳入带来的被动资金预期,基本面与资金面共振;股价尚未明显抢跑,可在TSX次日开盘小仓参与,但类比指数纳入案例第3–5日多见回吐,须在生效日前后止盈。
消息传播链
- Q3 2026指数季度再平衡公告,TRX Gold获纳入MVGDXJ;当日TRX.TO收涨1.95%,反应温和
- 公司同时发布Q4/FY2026创纪录初步产量新闻稿与指数纳入确认新闻稿(Exhibit 99.1/99.2),为本次全新增量信息
- 2026-09-14 06:27 ET市场反应futu盘前报价非一手TRX.US盘前1.14美元、仅+0.9%、成交不足7千股且买卖价差极宽,消息尚未被实质定价
关键理由
- 全年29,650盎司(同比+57%)达指引上限且Q4均价4,233美元/盎司,量价齐升使Q4/全年收入显著增长,而市场此前仅有9月11日指数公告、对产量beat尚无定价
- MVGDXJ纳入对应GDXJ等基金被动买盘,9月18日前后生效提供明确的短期资金流催化,且近20日股价仅+7.5%、无异常抢跑
主要风险
- 初步数据无成本/利润口径,11月正式财报若现金成本高于预期会修正利好;指数纳入属'卖事实'高发事件,类比案例第3–5日大幅回落
- 市值约3.7亿美元的小盘金矿股波动大,TSX若次日高开超过5%则风险回报恶化,应放弃追价
反向证据
- 做多前查反向 · 来源 web · 影响 none
新闻稿自称资产负债表强劲、扩建以经营现金流资助;未检索到近期砍单、下修、增发或停产等实质反证,但正式成本/利润数据要到11月才披露
检索:TRX Gold Buckreef cost overruns guidance miss financing dilution operational issue 2026 - 做多前查反向 · 来源 filing · 日期 2026-09-14 · 影响 weakens
6-K仅给产量与金价、明确财务数据为初步且11月才出财报,成本与利润率无法验证,构成主要不确定性
检索:TRX Gold Q4 2026 preliminary results cash cost AISC margin 原文 ↗
先例如何影响了这次决策
对本次决策的影响:先例使仓位从normal降为probe/small、TP保守并缩短持有期,不改变做多方向
方向:唯一可得类比先例指向纳入公告首日正收益、但持续性差,第3–5日大概率回落;由于锚不干净且无产量beat叠加,仅作弱方向参考
涨幅量级:无同市场、干净首发的aligned先例,不能据其数字校准涨幅;TP采用保守的5%–9%
形态:类比案例显示'纳入催化见光死'模式(第2日见顶后第5日-12.5%),因此time_stop收紧到4个交易日、覆盖指数生效日即退
历史先例(按相似度)
- 相似度 5/10 VOXR 2026-03-16 Vox Royalty 2026-03-16宣布纳入MVIS全球初级金矿商指数及GDXJ,公告前股价已连续回落 原文 ↗
事件后 +1日 +3.9% · +2日 +6.5% · +3日 -2.9% · +4日 -11.1% · +5日 -12.5%
⚠非首发(转载/聚合)·来源层级不符(声明media/实为aggregator)·锚前1-2日已异动8.2%>锚定日3.9% — 该行涨幅别用来定止盈止损
相似度依据:同为北美上市小型黄金板块公司宣布纳入MVGDXJ/GDXJ,资金流机制一致;但VOXR为特许权公司、无产量beat叠加,且样本锚不干净
经验:指数纳入公告后首日上涨(+3.9%),但第3日转跌、第5日-12.5%,属典型'纳入前买、生效前后卖',持有窗口须短
工具执行结果 · 成功 3 · 降级 2 · 失败 0 · 取消 0
- search_processed_events 成功 stock_tools HTTP · 18 ms
{"result": "search_processed_events:agent query=`trx gold buckreef 6-k september 14 2026 | trx gold mvis global junior gold miners index inclusion gdxj | trx gold q4 2026 record production 8173 ounces guidance top end`;结构化索引覆盖完整 72 小时;旧记录兼容扫描近 0.0/72 小时、0 条本臂决策(完整),返回 0 条候选。未命中只表示这些 agent query 表达式没 - stock_quote 降级 stock_tools HTTP · 1,401 ms
{ - web_search 成功 doubao_search · 1,712 ms
豆包搜索结果(原始查询:MVIS Global Junior Gold Miners Index Q3 2026 review additions TRX Gold effective date September 2026;API SearchType:web) - stock_quote 降级 stock_tools HTTP · 10,947 ms
{ - event_study 成功 stock_tools HTTP · 115 ms
{
原文全文
展开原文 · 22,733 字
----- exh_991.htm -----
EX-99.1
2
exh_991.htm
PRESS RELEASE
EdgarFiling
EXHIBIT 99.1
TRX Gold Delivers Record Q4 2026; Achieves Top End of Production Guidance
TORONTO, Sept. 14, 2026 (GLOBE NEWSWIRE) -- TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) (the “Company” or “TRX Gold”) is pleased to announce preliminary results for Q4 2026
1
.
Record Fourth Quarter Results Lead to Achieving Top End of Fiscal 2026 Production Guidance
: In Q4 2026, the Company delivered record quarterly gold production of 8,173 ounces, up 28% from 6,404 ounces in Q4 2025. On a full year basis, the Company delivered record annual gold production of 29,650 ounces, an increase of 57% from 18,935 ounces in 2025, and achieved the top end of its full-year production guidance range of 25,000 to 30,000 ounces.
Record Gold Price Realization
: During Q4 2026, the Company benefited from a robust average market price for gold of approximately $4,233 per ounce (London PM fix), a 26% increase over the prior year comparative period (Q4 2025: $3,369 per ounce). Combined with higher year over year production, revenue is expected to be significantly higher in Q4 2026 than in the prior year comparative period. On a full year basis, the Company benefited from a record annual average market price for gold of approximately $4,386 per ounce (London PM fix), a 46% increase over the prior year comparative period (2025: $2,999 per ounce). On a full year basis, revenue is expected to be significantly higher in 2026 than in 2025.
Process Plant Upgrades Lead to Improved Throughput, Recovery and Gold Production:
During Q4 2026 the Company continued to make progress on upgrades to the existing 2,000 tpd processing plant. Notable upgrades to the existing processing plant include a pre-leach thickener, upgraded agitators & interstage screens, Aachen reactor, oxygen plant, Adsorption, Desorption and Recovery (“ADR”) plant, new gold room, apron feeder, belt magnet, and new tertiary crusher. The plant upgrades are in various stages of completion and have already begun to boost plant reliability and performance as evidenced by an increase in plant throughput, gold recovery and gold production in Q4 2026 versus the prior year comparative period.
Advancing Process Plant Expansion to Significantly Increase Future Production Capacity:
The Company continues to advance its processing plant expansion, a key catalyst for future growth. As previously reported, recent metallurgical test work has led the Company to specify a Semi Autogenous Grind (“SAG”) / Ball mill combination of 3,500 tpd as part of its next processing plant expansion based on optimal grind size for achievable mine feed from the mine plan. Final contract execution for the new SAG / Ball mill was completed in early Q4 2026, initial downpayments have been made, and estimated completion is expected over the next 12 – 18 months. The existing, upgraded 2,000 tpd processing plant will be available to continue operating in conjunction with the new 3,500 tpd SAG / Ball mill processing plant, providing a significant upgrade in processing capacity versus the 3,000 tpd assumed in the PEA. The increase in throughput from the expanded processing plant is expected to produce average annual gold production in excess of the 62,000 ounces of gold originally anticipated in the PEA.
Exploration to Ramp-Up Significantly:
During fiscal 2026, Buckreef Gold drilled approximately 175 drill holes for a total of 14,500 meters across resource definition, geotechnical, sterilization and greenfield exploration. This was predominantly completed in the second half of fiscal 2026 utilizing one Company owned reverse circulation (“RC”) drill rig and one contractor diamond drill (“DD”) rig. The RC drill rig was commissioned in March 2026 and the DD rig in April 2026. Buckreef Gold also utilized the RC drill rig for ongoing grade control drilling for normal course operations. Buckreef Gold has also purchased: (i) an additional DD drill rig which is currently onsite and being commissioned; (ii) a new RC drill rig which is expected to be onsite in the next 2-4 weeks; and (iii) a new RC/DD combination drill rig which is expected to arrive in the next 4-6 months. These purchases in combination with existing drill rigs on site will significantly increase Buckreef Gold’s drilling capacity and will be utilized for grade control, resource definition, geotechnical, sterilization and greenfield exploration drilling. Given the significant increase in drilling capacity, there will be a significant increase in greenfield exploration, including: (i) the anomalies from the comprehensive geophysics study which identified ten promising targets; and (ii) Stamford Bridge and the Anfield Zone.
Stephen Mullowney, TRX Gold CEO commented: “We are very pleased to have delivered record quarterly and annual gold production in fiscal 2026, achieving the top end of our production guidance while continuing to improve the performance and reliability of our processing plant. The combination of higher production, a robust gold price environment and a strong balance sheet positions us well as we continue to build momentum across the business. Our accelerated plant expansion is laying the foundation for the next stage of growth at Buckreef Gold. The addition of a 3,500 tpd SAG/Ball mill circuit, together with significant upgrades to our existing 2,000 tpd plant, will provide combined processing capacity well beyond the 3,000 tpd capacity contemplated in our PEA last year, unlocking significant value. The improvements we have already made to the existing plant are contributing to higher throughput, recovery and production, while the new SAG/Ball mill represents a significant step forward in our ability to support significantly higher gold production in the years ahead. With a strong balance sheet and a clear path to increased production, we are well positioned to execute on our growth plans and create long-term value for our shareholders.”
About TRX Gold Corporation
TRX Gold is a high margin and growing gold company advancing the Buckreef Gold Project in Tanzania. Buckreef Gold includes an established open pit operation and 2,000 tonnes per day process plant with upside potential demonstrated in the May 2025 Preliminary Economic Assessment (the “PEA”). The PEA outlines average gold production of 62,000 oz per annum over 17.6 years at 3,000 tonnes per day of throughput capacity, and a US$1.9 –US$2.6 billion pre-tax NPV
5%
at average life of mine gold prices of US$4,000-US$5,000/oz
2
. The Buckreef Gold Project hosts a Measured and Indicated Mineral Resource of 10.8 million tonnes (“MT”) at 2.57 grams per tonne (“g/t”) gold containing 893,000 ounces (“oz”) of gold and an Inferred Mineral Resource of 9.1 MT at 2.47 g/t gold for 726,000 oz of gold. The leadership team is focused on creating both near-term and long-term shareholder value by increasing gold production to generate positive cash flow to fund the expansion as outlined in the PEA and grow Mineral Resources through exploration. TRX Gold’s actions are led by the highest environmental, social and corporate governance (“ESG”) standards, evidenced by the relationships and programs that the Company has developed during its nearly two decades of presence in the Geita Region, Tanzania.
Qualified Person
Mr. Richard Boffey, BE Mining (Hons) F AusIMM, Chief Operating Officer of TRX Gold Corporation, is the Company’s in-house Qualified Person under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes responsibility for the scientific and technical content in this press release.
For investor or shareholder inquiries, please contact:
Investor Relations
IR@TRXgold.com
+1-437-224-5241
+1 844 GOLD TRX (844-465-3879)
www.TRXgold.com
Forward-Looking and Cautionary Statements
This press release contains certain forward-looking statements as defined in the applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “hopes”, “intends”, “estimated”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved. Forward-looking statements relate to future events or future performance and reflect TRX Gold management’s expectations or beliefs regarding future events and include, but are not limited to, statements with respect to future gold prices, continued operating cash flow, expansion of its process plant, estimation of mineral resources, ability to develop value creating activities, recoveries, subsequent project testing, success, scope and viability of mining operations, the timing and amount of estimated future production, and capital expenditure.
Although TRX Gold believes the expectations expressed in such forward-looking statements and the preliminary data included in this press release are based on reasonable assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other future events or conditions may differ materially from those reflected in the preliminary data and forward-looking statements due to a variety of risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic, competitive, political, regulatory and social uncertainties; actual results from operations, exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business. These risks are set forth in reports that TRX Gold files with the SEC and the various Canadian securities authorities. You can review and obtain copies of these filings from the SEC's website at
http://www.sec.gov/edgar.shtml
and the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR+”) at
www.sedarplus.ca
.
The disclosure contained in this press release of a scientific or technical nature relating to the Company’s Buckreef Project has been summarized or extracted from the technical report prepared in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects on the Buckreef Gold Project (“Buckreef Gold”) titled Preliminary Economic Assessment and Updated Mineral Resource Estimate of the Buckreef Gold Mine Project, Tanzania (“PEA”) with an effective date of April 15, 2025. The PEA was prepared in accordance with NI 43-101 guidelines by P&E Mining Consultants Inc. (“P&E”). Input to this PEA was also provided by D.E.N.M. Engineering Ltd. (“D.E.N.M.”). The information contained herein is subject to all of the assumptions, qualifications and procedures set out in, and is qualified in its entirety by reference to the full text of, the PEA and reference should be made to the full details of the PEA which has been filed with the applicable regulatory authorities and is available on the Company’s profile at www.sedarplus.ca.
The information contained in this press release is as of the date of the press release and TRX Gold assumes no duty to update such information.
1
TRX Gold will provide additional discussion and analysis regarding its Q4 2026 production, sales and financial results when the Company reports its financial statements and Management’s Discussion and Analysis in November 2026. Financial figures quoted throughout are preliminary in nature, unaudited and subject to change.
2
Base case NPV
5%
of US$701.0 million pre-tax, or US$442.2 million after tax at consensus forecast case gold prices (US$2,707/oz year 1, US$2,646/oz year 2, US$2,495/oz year 3, US$2,400/oz year 4, US$2,245/oz thereafter).
----- exh_992.htm -----
EX-99.2
3
exh_992.htm
PRESS RELEASE
EdgarFiling
EXHIBIT 99.2
TRX Gold Announces Major Milestone with Addition to the MVIS® Global Junior Gold Miners Index
TORONTO, Sept. 14, 2026 (GLOBE NEWSWIRE) -- TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) (the “Company” or “TRX Gold”) is pleased to report that the Company has been added to the MVIS
®
Global Junior Gold Miners Index (“MVGDXJ”) following the Q3 2026 index rebalance announcement on September 11, 2026.
Stephen Mullowney, TRX Gold CEO commented: “Following our addition to the S&P/TSX Global Mining Index announced on March 28, I am very pleased to announce that TRX Gold has now also met the criteria for inclusion in the MVGDXJ, which is designed to track the overall performance of small-capitalization companies that are involved primarily in the mining of gold and/or silver
1
. TRX Gold’s inclusion in this major index has the potential to maintain and attract additional global institutional investment into the Company and increase liquidity, with the MVGDXJ being an important benchmark requirement for many large investment funds. This addition also positions the Company for possible inclusion in related funds and ETFs, including the Van Eck Junior Gold Miners ETF (“GDXJ
®
”) which seeks to replicate as closely as possible, before fees and expenses, the price and yield performance of the MVGDXJ. Congratulations to the entire team on achieving this important milestone!”
For the MVIS Global Junior Gold Miners Index (MVGDXJ), the Q3 2026 rebalance schedule is as follows:
Index data / reference date: August 31, 2026
Rebalance announcement: September 11, 2026
Index Implementation / rebalance date: September 18, 2026
New composition becomes effective: September 21, 2026, the next trading day after implementation.
About MVGDXJ
1
The MVIS
®
Global Junior Gold Miners Index (MVGDXJ) tracks the performance of the most liquid small-cap companies in the global gold and silver mining industries. This is a modified market cap-weighted index, and only includes companies that generate at least 50% of their revenue from gold or silver mining, or at least 50% of their mining mineral resources are from gold or silver. For more information about the MVIS
®
Global Junior Gold Miners Index, please visit the index provider’s website.
1
Source: https://www.marketvector.com/indexes/hard-asset/mvis-global-junior-gold-miners
About TRX Gold Corporation
TRX Gold is a high margin and growing gold company advancing the Buckreef Gold Project in Tanzania. Buckreef Gold includes an established open pit operation and 2,000 tonnes per day process plant with upside potential demonstrated in the May 2025 Preliminary Economic Assessment (the “PEA”). The PEA outlines average gold production of 62,000 oz per annum over 17.6 years at 3,000 tonnes per day of throughput capacity, and a US$1.9 –US$2.6 billion pre-tax NPV
5%
at average life of mine gold prices of US$4,000-US$5,000/oz. The Buckreef Gold Project hosts a Measured and Indicated Mineral Resource of 10.8 million tonnes (“MT”) at 2.57 grams per tonne (“g/t”) gold containing 893,000 ounces (“oz”) of gold and an Inferred Mineral Resource of 9.1 MT at 2.47 g/t gold for 726,000 oz of gold. The leadership team is focused on creating both near-term and long-term shareholder value by increasing gold production to generate positive cash flow to fund the expansion as outlined in the PEA and grow Mineral Resources through exploration. TRX Gold’s actions are led by the highest environmental, social and corporate governance (“ESG”) standards, evidenced by the relationships and programs that the Company has developed during its nearly two decades of presence in the Geita Region, Tanzania.
Qualified Person
Mr. Richard Boffey, BE Mining (Hons) F AusIMM, Chief Operating Officer of TRX Gold Corporation, is the Company’s in-house Qualified Person under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes responsibility for the scientific and technical content in this press release.
For investor or shareholder inquiries, please contact:
Investor Relations
IR@TRXgold.com
+1-437-224-5241
+1 844 GOLD TRX (844-465-3879)
www.TRXgold.com
Forward-Looking and Cautionary Statements
This press release contains certain forward-looking statements as defined in the applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “hopes”, “intends”, “estimated”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved. Forward-looking statements relate to future events or future performance and reflect TRX Gold management’s expectations or beliefs regarding future events and include, but are not limited to, statements with respect to future inclusion of TRX Gold in additional indices or funds, ability to attract investors or increase liquidity as a result of being included in any index or for any other reason, future gold prices, continued operating cash flow, expansion of its process plant, estimation of mineral resources, ability to develop value creating activities, recoveries, subsequent project testing, success, scope and viability of mining operations, the timing and amount of estimated future production and capital expenditures.
Although TRX Gold believes the expectations expressed in such forward-looking statements and the preliminary data included in this press release are based on reasonable assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other future events or conditions may differ materially from those reflected in the preliminary data and forward-looking statements due to a variety of risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic, competitive, political, regulatory and social uncertainties; actual results from operations, exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business. These risks are set forth in reports that TRX Gold files with the SEC and the various Canadian securities authorities. You can review and obtain copies of these filings from the SEC's website at
http://www.sec.gov/edgar.shtml
and the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR+”) at
www.sedarplus.ca
.
The disclosure contained in this press release of a scientific or technical nature relating to the Company’s Buckreef Project has been summarized or extracted from the technical report prepared in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects on the Buckreef Gold Project (“Buckreef Gold”) titled Preliminary Economic Assessment and Updated Mineral Resource Estimate of the Buckreef Gold Mine Project, Tanzania (“PEA”) with an effective date of April 15, 2025. The PEA was prepared in accordance with NI 43-101 guidelines by P&E Mining Consultants Inc. (“P&E”). Input to this PEA was also provided by D.E.N.M. Engineering Ltd. (“D.E.N.M.”). The information contained herein is subject to all of the assumptions, qualifications and procedures set out in, and is qualified in its entirety by reference to the full text of, the PEA and reference should be made to the full details of the PEA which has been filed with the applicable regulatory authorities and is available on the Company’s profile at www.sedarplus.ca.
The information contained in this press release is as of the date of the press release and TRX Gold assumes no duty to update such information.
----- f6k_091326.htm -----
6-K
1
f6k_091326.htm
FORM 6-K
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of September 2026
Commission File Number: 001-32500
TRX Gold Corporation
(Translation of registrant's name into English)
277 Lakeshore Road East, Suite 403
Oakville, Ontario Canada L6J 6J3
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [ ] Form 40-F [ X ]
Explanatory Note
On September 14, 2026, the Registrant issued press releases entitled “TRX Gold Delivers Record Q4 2026; Achieves Top End of Production Guidance” and TRX Gold Announces Major Milestone with Addition to the MVIS® Global Junior Gold Miners Index copies of which are furnished as Exhibits 99.1 and 99.2 to this Form 6-K.
The information contained in this report and the exhibits hereto shall not be deemed to be “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, and shall not be deemed incorporated by reference into any filings made by the Company under the Securities Act of 1933, as amended, or the Exchange Act, except as may be expressly set forth by specific reference in such filing.
Exhibit
The following exhibit is furnished as part of this Form 6-K.
Exhibit No.
Description
99.1
Press Release dated September 14, 2026, entitled "TRX Gold Delivers Record Q4 2026; Achieves Top End of Production Guidance"
99.2
Press Release dated September 14, 2026, entitled "TRX Gold Announces Major Milestone with Addition to the MVIS® Global Junior Gold Miners Index"
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
TRX Gold Corporation
(Registrant)
Date: September 14, 2026
By:
/s/ Michael Leonard
Michael Leonard
Chief Financial Officer
EX-99.1
2
exh_991.htm
PRESS RELEASE
EdgarFiling
EXHIBIT 99.1
TRX Gold Delivers Record Q4 2026; Achieves Top End of Production Guidance
TORONTO, Sept. 14, 2026 (GLOBE NEWSWIRE) -- TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) (the “Company” or “TRX Gold”) is pleased to announce preliminary results for Q4 2026
1
.
Record Fourth Quarter Results Lead to Achieving Top End of Fiscal 2026 Production Guidance
: In Q4 2026, the Company delivered record quarterly gold production of 8,173 ounces, up 28% from 6,404 ounces in Q4 2025. On a full year basis, the Company delivered record annual gold production of 29,650 ounces, an increase of 57% from 18,935 ounces in 2025, and achieved the top end of its full-year production guidance range of 25,000 to 30,000 ounces.
Record Gold Price Realization
: During Q4 2026, the Company benefited from a robust average market price for gold of approximately $4,233 per ounce (London PM fix), a 26% increase over the prior year comparative period (Q4 2025: $3,369 per ounce). Combined with higher year over year production, revenue is expected to be significantly higher in Q4 2026 than in the prior year comparative period. On a full year basis, the Company benefited from a record annual average market price for gold of approximately $4,386 per ounce (London PM fix), a 46% increase over the prior year comparative period (2025: $2,999 per ounce). On a full year basis, revenue is expected to be significantly higher in 2026 than in 2025.
Process Plant Upgrades Lead to Improved Throughput, Recovery and Gold Production:
During Q4 2026 the Company continued to make progress on upgrades to the existing 2,000 tpd processing plant. Notable upgrades to the existing processing plant include a pre-leach thickener, upgraded agitators & interstage screens, Aachen reactor, oxygen plant, Adsorption, Desorption and Recovery (“ADR”) plant, new gold room, apron feeder, belt magnet, and new tertiary crusher. The plant upgrades are in various stages of completion and have already begun to boost plant reliability and performance as evidenced by an increase in plant throughput, gold recovery and gold production in Q4 2026 versus the prior year comparative period.
Advancing Process Plant Expansion to Significantly Increase Future Production Capacity:
The Company continues to advance its processing plant expansion, a key catalyst for future growth. As previously reported, recent metallurgical test work has led the Company to specify a Semi Autogenous Grind (“SAG”) / Ball mill combination of 3,500 tpd as part of its next processing plant expansion based on optimal grind size for achievable mine feed from the mine plan. Final contract execution for the new SAG / Ball mill was completed in early Q4 2026, initial downpayments have been made, and estimated completion is expected over the next 12 – 18 months. The existing, upgraded 2,000 tpd processing plant will be available to continue operating in conjunction with the new 3,500 tpd SAG / Ball mill processing plant, providing a significant upgrade in processing capacity versus the 3,000 tpd assumed in the PEA. The increase in throughput from the expanded processing plant is expected to produce average annual gold production in excess of the 62,000 ounces of gold originally anticipated in the PEA.
Exploration to Ramp-Up Significantly:
During fiscal 2026, Buckreef Gold drilled approximately 175 drill holes for a total of 14,500 meters across resource definition, geotechnical, sterilization and greenfield exploration. This was predominantly completed in the second half of fiscal 2026 utilizing one Company owned reverse circulation (“RC”) drill rig and one contractor diamond drill (“DD”) rig. The RC drill rig was commissioned in March 2026 and the DD rig in April 2026. Buckreef Gold also utilized the RC drill rig for ongoing grade control drilling for normal course operations. Buckreef Gold has also purchased: (i) an additional DD drill rig which is currently onsite and being commissioned; (ii) a new RC drill rig which is expected to be onsite in the next 2-4 weeks; and (iii) a new RC/DD combination drill rig which is expected to arrive in the next 4-6 months. These purchases in combination with existing drill rigs on site will significantly increase Buckreef Gold’s drilling capacity and will be utilized for grade control, resource definition, geotechnical, sterilization and greenfield exploration drilling. Given the significant increase in drilling capacity, there will be a significant increase in greenfield exploration, including: (i) the anomalies from the comprehensive geophysics study which identified ten promising targets; and (ii) Stamford Bridge and the Anfield Zone.
Stephen Mullowney, TRX Gold CEO commented: “We are very pleased to have delivered record quarterly and annual gold production in fiscal 2026, achieving the top end of our production guidance while continuing to improve the performance and reliability of our processing plant. The combination of higher production, a robust gold price environment and a strong balance sheet positions us well as we continue to build momentum across the business. Our accelerated plant expansion is laying the foundation for the next stage of growth at Buckreef Gold. The addition of a 3,500 tpd SAG/Ball mill circuit, together with significant upgrades to our existing 2,000 tpd plant, will provide combined processing capacity well beyond the 3,000 tpd capacity contemplated in our PEA last year, unlocking significant value. The improvements we have already made to the existing plant are contributing to higher throughput, recovery and production, while the new SAG/Ball mill represents a significant step forward in our ability to support significantly higher gold production in the years ahead. With a strong balance sheet and a clear path to increased production, we are well positioned to execute on our growth plans and create long-term value for our shareholders.”
About TRX Gold Corporation
TRX Gold is a high margin and growing gold company advancing the Buckreef Gold Project in Tanzania. Buckreef Gold includes an established open pit operation and 2,000 tonnes per day process plant with upside potential demonstrated in the May 2025 Preliminary Economic Assessment (the “PEA”). The PEA outlines average gold production of 62,000 oz per annum over 17.6 years at 3,000 tonnes per day of throughput capacity, and a US$1.9 –US$2.6 billion pre-tax NPV
5%
at average life of mine gold prices of US$4,000-US$5,000/oz
2
. The Buckreef Gold Project hosts a Measured and Indicated Mineral Resource of 10.8 million tonnes (“MT”) at 2.57 grams per tonne (“g/t”) gold containing 893,000 ounces (“oz”) of gold and an Inferred Mineral Resource of 9.1 MT at 2.47 g/t gold for 726,000 oz of gold. The leadership team is focused on creating both near-term and long-term shareholder value by increasing gold production to generate positive cash flow to fund the expansion as outlined in the PEA and grow Mineral Resources through exploration. TRX Gold’s actions are led by the highest environmental, social and corporate governance (“ESG”) standards, evidenced by the relationships and programs that the Company has developed during its nearly two decades of presence in the Geita Region, Tanzania.
Qualified Person
Mr. Richard Boffey, BE Mining (Hons) F AusIMM, Chief Operating Officer of TRX Gold Corporation, is the Company’s in-house Qualified Person under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes responsibility for the scientific and technical content in this press release.
For investor or shareholder inquiries, please contact:
Investor Relations
IR@TRXgold.com
+1-437-224-5241
+1 844 GOLD TRX (844-465-3879)
www.TRXgold.com
Forward-Looking and Cautionary Statements
This press release contains certain forward-looking statements as defined in the applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “hopes”, “intends”, “estimated”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved. Forward-looking statements relate to future events or future performance and reflect TRX Gold management’s expectations or beliefs regarding future events and include, but are not limited to, statements with respect to future gold prices, continued operating cash flow, expansion of its process plant, estimation of mineral resources, ability to develop value creating activities, recoveries, subsequent project testing, success, scope and viability of mining operations, the timing and amount of estimated future production, and capital expenditure.
Although TRX Gold believes the expectations expressed in such forward-looking statements and the preliminary data included in this press release are based on reasonable assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other future events or conditions may differ materially from those reflected in the preliminary data and forward-looking statements due to a variety of risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic, competitive, political, regulatory and social uncertainties; actual results from operations, exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business. These risks are set forth in reports that TRX Gold files with the SEC and the various Canadian securities authorities. You can review and obtain copies of these filings from the SEC's website at
http://www.sec.gov/edgar.shtml
and the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR+”) at
www.sedarplus.ca
.
The disclosure contained in this press release of a scientific or technical nature relating to the Company’s Buckreef Project has been summarized or extracted from the technical report prepared in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects on the Buckreef Gold Project (“Buckreef Gold”) titled Preliminary Economic Assessment and Updated Mineral Resource Estimate of the Buckreef Gold Mine Project, Tanzania (“PEA”) with an effective date of April 15, 2025. The PEA was prepared in accordance with NI 43-101 guidelines by P&E Mining Consultants Inc. (“P&E”). Input to this PEA was also provided by D.E.N.M. Engineering Ltd. (“D.E.N.M.”). The information contained herein is subject to all of the assumptions, qualifications and procedures set out in, and is qualified in its entirety by reference to the full text of, the PEA and reference should be made to the full details of the PEA which has been filed with the applicable regulatory authorities and is available on the Company’s profile at www.sedarplus.ca.
The information contained in this press release is as of the date of the press release and TRX Gold assumes no duty to update such information.
1
TRX Gold will provide additional discussion and analysis regarding its Q4 2026 production, sales and financial results when the Company reports its financial statements and Management’s Discussion and Analysis in November 2026. Financial figures quoted throughout are preliminary in nature, unaudited and subject to change.
2
Base case NPV
5%
of US$701.0 million pre-tax, or US$442.2 million after tax at consensus forecast case gold prices (US$2,707/oz year 1, US$2,646/oz year 2, US$2,495/oz year 3, US$2,400/oz year 4, US$2,245/oz thereafter).
----- exh_992.htm -----
EX-99.2
3
exh_992.htm
PRESS RELEASE
EdgarFiling
EXHIBIT 99.2
TRX Gold Announces Major Milestone with Addition to the MVIS® Global Junior Gold Miners Index
TORONTO, Sept. 14, 2026 (GLOBE NEWSWIRE) -- TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) (the “Company” or “TRX Gold”) is pleased to report that the Company has been added to the MVIS
®
Global Junior Gold Miners Index (“MVGDXJ”) following the Q3 2026 index rebalance announcement on September 11, 2026.
Stephen Mullowney, TRX Gold CEO commented: “Following our addition to the S&P/TSX Global Mining Index announced on March 28, I am very pleased to announce that TRX Gold has now also met the criteria for inclusion in the MVGDXJ, which is designed to track the overall performance of small-capitalization companies that are involved primarily in the mining of gold and/or silver
1
. TRX Gold’s inclusion in this major index has the potential to maintain and attract additional global institutional investment into the Company and increase liquidity, with the MVGDXJ being an important benchmark requirement for many large investment funds. This addition also positions the Company for possible inclusion in related funds and ETFs, including the Van Eck Junior Gold Miners ETF (“GDXJ
®
”) which seeks to replicate as closely as possible, before fees and expenses, the price and yield performance of the MVGDXJ. Congratulations to the entire team on achieving this important milestone!”
For the MVIS Global Junior Gold Miners Index (MVGDXJ), the Q3 2026 rebalance schedule is as follows:
Index data / reference date: August 31, 2026
Rebalance announcement: September 11, 2026
Index Implementation / rebalance date: September 18, 2026
New composition becomes effective: September 21, 2026, the next trading day after implementation.
About MVGDXJ
1
The MVIS
®
Global Junior Gold Miners Index (MVGDXJ) tracks the performance of the most liquid small-cap companies in the global gold and silver mining industries. This is a modified market cap-weighted index, and only includes companies that generate at least 50% of their revenue from gold or silver mining, or at least 50% of their mining mineral resources are from gold or silver. For more information about the MVIS
®
Global Junior Gold Miners Index, please visit the index provider’s website.
1
Source: https://www.marketvector.com/indexes/hard-asset/mvis-global-junior-gold-miners
About TRX Gold Corporation
TRX Gold is a high margin and growing gold company advancing the Buckreef Gold Project in Tanzania. Buckreef Gold includes an established open pit operation and 2,000 tonnes per day process plant with upside potential demonstrated in the May 2025 Preliminary Economic Assessment (the “PEA”). The PEA outlines average gold production of 62,000 oz per annum over 17.6 years at 3,000 tonnes per day of throughput capacity, and a US$1.9 –US$2.6 billion pre-tax NPV
5%
at average life of mine gold prices of US$4,000-US$5,000/oz. The Buckreef Gold Project hosts a Measured and Indicated Mineral Resource of 10.8 million tonnes (“MT”) at 2.57 grams per tonne (“g/t”) gold containing 893,000 ounces (“oz”) of gold and an Inferred Mineral Resource of 9.1 MT at 2.47 g/t gold for 726,000 oz of gold. The leadership team is focused on creating both near-term and long-term shareholder value by increasing gold production to generate positive cash flow to fund the expansion as outlined in the PEA and grow Mineral Resources through exploration. TRX Gold’s actions are led by the highest environmental, social and corporate governance (“ESG”) standards, evidenced by the relationships and programs that the Company has developed during its nearly two decades of presence in the Geita Region, Tanzania.
Qualified Person
Mr. Richard Boffey, BE Mining (Hons) F AusIMM, Chief Operating Officer of TRX Gold Corporation, is the Company’s in-house Qualified Person under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes responsibility for the scientific and technical content in this press release.
For investor or shareholder inquiries, please contact:
Investor Relations
IR@TRXgold.com
+1-437-224-5241
+1 844 GOLD TRX (844-465-3879)
www.TRXgold.com
Forward-Looking and Cautionary Statements
This press release contains certain forward-looking statements as defined in the applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “hopes”, “intends”, “estimated”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved. Forward-looking statements relate to future events or future performance and reflect TRX Gold management’s expectations or beliefs regarding future events and include, but are not limited to, statements with respect to future inclusion of TRX Gold in additional indices or funds, ability to attract investors or increase liquidity as a result of being included in any index or for any other reason, future gold prices, continued operating cash flow, expansion of its process plant, estimation of mineral resources, ability to develop value creating activities, recoveries, subsequent project testing, success, scope and viability of mining operations, the timing and amount of estimated future production and capital expenditures.
Although TRX Gold believes the expectations expressed in such forward-looking statements and the preliminary data included in this press release are based on reasonable assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other future events or conditions may differ materially from those reflected in the preliminary data and forward-looking statements due to a variety of risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic, competitive, political, regulatory and social uncertainties; actual results from operations, exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business. These risks are set forth in reports that TRX Gold files with the SEC and the various Canadian securities authorities. You can review and obtain copies of these filings from the SEC's website at
http://www.sec.gov/edgar.shtml
and the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR+”) at
www.sedarplus.ca
.
The disclosure contained in this press release of a scientific or technical nature relating to the Company’s Buckreef Project has been summarized or extracted from the technical report prepared in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects on the Buckreef Gold Project (“Buckreef Gold”) titled Preliminary Economic Assessment and Updated Mineral Resource Estimate of the Buckreef Gold Mine Project, Tanzania (“PEA”) with an effective date of April 15, 2025. The PEA was prepared in accordance with NI 43-101 guidelines by P&E Mining Consultants Inc. (“P&E”). Input to this PEA was also provided by D.E.N.M. Engineering Ltd. (“D.E.N.M.”). The information contained herein is subject to all of the assumptions, qualifications and procedures set out in, and is qualified in its entirety by reference to the full text of, the PEA and reference should be made to the full details of the PEA which has been filed with the applicable regulatory authorities and is available on the Company’s profile at www.sedarplus.ca.
The information contained in this press release is as of the date of the press release and TRX Gold assumes no duty to update such information.
----- f6k_091326.htm -----
6-K
1
f6k_091326.htm
FORM 6-K
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of September 2026
Commission File Number: 001-32500
TRX Gold Corporation
(Translation of registrant's name into English)
277 Lakeshore Road East, Suite 403
Oakville, Ontario Canada L6J 6J3
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [ ] Form 40-F [ X ]
Explanatory Note
On September 14, 2026, the Registrant issued press releases entitled “TRX Gold Delivers Record Q4 2026; Achieves Top End of Production Guidance” and TRX Gold Announces Major Milestone with Addition to the MVIS® Global Junior Gold Miners Index copies of which are furnished as Exhibits 99.1 and 99.2 to this Form 6-K.
The information contained in this report and the exhibits hereto shall not be deemed to be “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, and shall not be deemed incorporated by reference into any filings made by the Company under the Securities Act of 1933, as amended, or the Exchange Act, except as may be expressly set forth by specific reference in such filing.
Exhibit
The following exhibit is furnished as part of this Form 6-K.
Exhibit No.
Description
99.1
Press Release dated September 14, 2026, entitled "TRX Gold Delivers Record Q4 2026; Achieves Top End of Production Guidance"
99.2
Press Release dated September 14, 2026, entitled "TRX Gold Announces Major Milestone with Addition to the MVIS® Global Junior Gold Miners Index"
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
TRX Gold Corporation
(Registrant)
Date: September 14, 2026
By:
/s/ Michael Leonard
Michael Leonard
Chief Financial Officer
决策记录链 · 只追加
每次领取产生一条记录,重新决策追加一条并以 supersedes 指向被替代的记录(ADR 0014)。
这条决策早于决策账本(2026-10-08 起逐条追加),没有追加记录。