🇺🇸 SECBlue Moon Metals Inc.Doubao · 实盘可交易 · 做多市场:美股▼ 亏 -12.65% · 已结算把握 5/10
北京时间·🕒 发布 18:58:22·⟳ 抓取 18:58:52 +30s·⚡ 决策 09-14 19:01:44 +2m52s·43.1 天前
Blue Moon联手Elmet与EQ Resources,拟向内华达Springer钨矿投入1.5–1.75亿美元,绑定美国战争部钨供应链投资
过去24小时同一标的已存在入场,抑制重复下注:ELMT.US
📄 原文Blue Moon Metals Inc.↗ 原文
----- ex991_1.htm ----- EX-99.1 2 ex991_1.htm EXHIBIT 99.1 Exhibit 99.1 Date: News Release: Ticker Symbols: September 1…
▼ 亏 -12.65%入场 09-14 盘前首笔 @6.503 → 离场 09-15 开盘 @5.690
日 K 取自复盘打分切片 · 蓝点/蓝虚线 = 纸面入场价 · 灰虚线 = 纸面离场 · 持有期红底 = 赚(价格在入场线上方)、绿底 = 亏
💡 交易逻辑战争部背书1.5亿美元注入Springer,溢价入股+预付款去风险,盘前仅+18%未充分定价
怎么买 限价买入 不高于昨收 +12%、仅下一个交易日,不成交作废
怎么卖 止盈 +12%(半仓)/+25%(清仓) · 止损 -10% · 时间止损 5日
不做 EQ Resources Limited(EQR.AU)
虽获8年offtake与10% JV权益、管理层称transformational,但当前ASX非交易时段、未核验实时行情与市值弹性,且本信号主标的为Blue Moon,留待澳股开盘前另行评估
展开详情(成交明细 / 研究档案 / 原文全文 / 决策记录链)
分时走势
做多 BMM.US Blue Moon Metals Inc.
5 个交易日均已收盘,数据完整 · 美股含盘前盘后(灰底:美东 04:00 至收盘后 4 小时)
- 发布 09-14 18:58 北京(美东 09-14 06:58)
- 抓取 09-14 18:58 北京(美东 09-14 06:58)
- 决策 09-14 19:01 北京(美东 09-14 07:01)
- 入场 09-14 19:02 北京(美东 09-14 07:02) · 盘前首笔 @6.503
- 离场 09-15 21:30 北京(美东 09-15 09:30) · 开盘 @5.690
时间轴只含交易时段(午休、隔夜已压缩);横轴为北京时间,悬停看当地时间;蓝虚线 = 纸面入场价;建仓日图红线在昨收上方、绿线在下方
成交明细 · 纸面
做多 BMM.US Blue Moon Metals Inc.
| 收益状态 | -12.65% 已平仓 |
|---|---|
| 进场成交 | 2026-09-14 · 盘前首笔 · 09-14 19:02 北京 · @6.5032 |
| 离场成交 | 2026-09-15 · 开盘 · @5.69 |
| 毛收益 | -12.50% |
| 成本 | +0.14% |
| 净收益 | -12.65% |
| 计入收益 | -12.65% |
| 建仓日 | 2026-09-14 · 进场不早于新闻时刻 + 2 分钟 |
收益口径 event_time_plus_2min_10min_walk_open_topup_to_next_open_exchange_calendar_fill_model_local_notional_v9 · method_id m8db1cbc8f2d · 截至 2026-10-27 21:01
研究档案
结论摘要
战争部4.5亿美元背书下,TEG拟向Blue Moon的Springer钨项目投入约1.5亿美元并组建APT合资公司,直接解决小盘矿企开发资金、验证资产价值;盘前BMM+18%、ELMT+48%反映即时重定价,开盘限价小仓参与,意向书未转最终协议则退。
消息传播链
- TEG率先发布战争部4.5亿美元承诺投资及部署计划,为本次交易的资金来源锚点
- 三方联合披露Springer 1.5–1.75亿美元交易结构,随后由Blue Moon以6-K提交SEC
- Blue Moon向SEC提交6-K并附新闻稿,法定披露确认交易内容
- 2026-09-14 11:00 UTC市场反应futu盘前报价非一手盘前BMM报6.44美元(+18.1%,约4.3万股)、ELMT报23.92美元(+47.7%,约65万股),市场正在实时重定价但尚未进入正式时段市场反应:BMM +18% / ELMT +48% 盘前
关键理由
- Blue Moon直接获约7500万美元现金支持(5000万预付款+2500万溢价31.8%入股),相对其约5.7亿美元市值是约13%的非稀释/部分溢价资金注入,并保留矿山100%权益与JV 20%股权
- 战争部4.5亿美元承诺投资把商业交易升级为国家安全供应链主题,NEPA已完成、 bonding已于8月20日获批,融资与许可两条主线同时去风险
主要风险
- 目前仅为具约束力意向书,交割取决于尽调、TSXV批准与最终协议,存在告吹或条款缩水风险
- 盘前ELMT已+48%、BMM+18%且盘前成交偏薄,开盘可能冲高回落;2天后FOMC加剧小盘股波动,历史资源量亦未经QP验证
- TEG认股权证及未来pro-rata参与权意味着Blue Moon仍有后续摊薄
反向证据
- 做多前查反向 · 来源 filing · 日期 2026-09-14 · 影响 weakens
新闻稿自述:交易为具约束力意向书,需尽调、TSXV及监管批准、最终协议;1984年历史资源量未经QP验证、不能依赖
检索:Blue Moon Springer transaction risks due diligence TSXV approval historical resource not verified 原文 ↗ - 做多前查反向 · 来源 web · 日期 2026-09-14 · 影响 weakens
检索到Blue Moon此前另有C$1.5亿bought deal融资与Nussir/Springer最终投资决定相关6-K,提示公司处于持续股权融资摊薄期
检索:Blue Moon Metals C$150 million bought deal financing dilution 2026 原文 ↗
先例如何影响了这次决策
对本次决策的影响:样本不足直接导致仓位降为small/probe、采用限价开盘而非市价追高,并设置较紧止损
方向:未取得可核验首发锚点的同类先例,不据记忆编造涨幅
涨幅量级:缺乏aligned先例,tp/sl仅按小盘关键矿产融资跳空的经验区间保守设定,不作为高置信目标价
形态:无法用先例判断见光死概率;以盘前跳空幅度大、意向书附条件为依据主动压仓并限价
工具执行结果 · 成功 5 · 降级 0 · 失败 0 · 取消 0
- search_processed_events 成功 stock_tools HTTP · 73 ms
{"result": "search_processed_events:agent query=`blue moon metals springer tungsten elmet group us$150 million investment jv | bmm moon eq resources apt plant nevada binding letter agreement | elmet group elmt department of war u`;结构化索引覆盖完整 72 小时;旧记录兼容扫描近 0.0/72 小时、0 条本臂决策(完整),返回 0 条候选。未命中只表示这些 agen - stock_quote 成功 stock_tools HTTP · 290 ms
{ - stock_quote 成功 stock_tools HTTP · 544 ms
{ - web_search 成功 doubao_search · 2,088 ms
豆包搜索结果(原始查询:Department of War US$450 million Elmet Group tungsten investment September 2026;API SearchType:web) - web_search 成功 doubao_search · 1,550 ms
豆包搜索结果(原始查询:Blue Moon Metals Springer tungsten Elmet EQ Resources $150 million binding agreement;API SearchType:web)
原文全文
展开原文 · 24,239 字
----- ex991_1.htm -----
EX-99.1
2
ex991_1.htm
EXHIBIT 99.1
Exhibit 99.1
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
Blue Moon, The Elmet Group, and EQ Resources Announce a US$150-$175 Million Investment into the Springer Tungsten Complex, Nevada, to Strengthen the U.S. Tungsten Supply Chain
TORONTO, Ontario, September 14, 2026
–
Blue Moon Metals
Inc.
(“
Blue Moon
” or the “
Company
”) (
TSXV: MOON
;
NASDAQ:
BMM
),
along with The Elmet Group Co. (“
Elmet
” or “
TEG
”)
(
NASDAQ: ELMT
), and EQ Resources Limited (“
EQ
”) (
ASX: EQR
)
(together the “
Parties
” or “
Party
”), are pleased to announce
signing a binding letter agreement dated September 11, 2026 regarding a series
of strategic transactions intended to unlock the value of Blue Moon’s Springer
Tungsten Complex (“
Springer
”), located in Imlay, Nevada.
Springer historically was one of the largest tungsten
mines in the United States, and consisting of open pit and underground mines, a
1,200 Tpd mill and an Ammonium Paratungstate (“
APT
”) plant capable of
potentially producing up to 4,000 Tpa (collectively, the “
Springer Project
”).
The facility is permitted for construction and received approval of its bonding
requirements from the State of Nevada to start construction and redevelopment
of the mine on August 20, 2026.
The facility is largely on fee lands, and contains a historical
mineral resource from General Electric and Utah International Inc. of 10.7 MT
of 0.45% WO
3
based on historical data and reports prepared by the
prior operators in 1984, as well as access to water, electricity, natural gas
and tailings capacity and is a few miles away from the Union Pacific rail-line
and the I-80 highway. The Company has not completed the work necessary to have
the historical mineral resource estimate verified by a QP. The Company is not
treating the estimate as a current NI 43-101 defined resource and the
historical resource estimate should not be relied upon. Further drilling this
year and next year will be used to update the resource estimate, which will
subsequently be reported in accordance with NI 43-101 standards. On September 3,
2026, Blue Moon acquired additional water rights and land to access the Union
Pacific rail-line, with the potential to install a load-on/out facility.
Figure 1: The Springer Project
Blue Moon has previously indicated the Springer mine and
mill are expected to be back in production in Q4-2027, and the APT plant is
expected to be restarted 2H-2028, which will be potentially the first material tungsten
concentrate production in North America and a significant new source of APT for
the U.S. market.
The contemplated transactions include: i) the formation
of a joint venture entity (the “
JV Entity
”) among the Parties to own and
operate the APT Plant (the mine and mill will remain owned by Blue Moon), (ii)
an equity investment by TEG into Blue Moon, (iii) TEG's receipt of board
representation in both Blue Moon and the Springer Project JV Entity; (iv) a
supply agreement for EQ and Blue Moon tungsten concentrate offtakes to the APT
plant at market pricing, (v) a tungsten prepayment facility provided by TEG to
Blue Moon to be repaid through a credit against sales of concentrate from
Springer, and (vi) a site sharing agreement between Blue Moon and the JV
Entity, covering the land, buildings, utilities, water, and services
arrangements between the JV Entity and Blue Moon (collectively, the "
Transactions
").
Page 1 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
The Transactions contemplate a total investment from TEG
of approximately US$150 million, split between, (i) investments in Blue Moon’s
activities at the Springer Site (the "
Blue Moon Investment
");
and (ii) a contribution to the JV Entity (the "
JV Investment
"
and, together with the Blue Moon Investment, the "
Project Investment
").
An additional US$25 million has been set aside by TEG and EQ for additional
standby requirements if needed to place the APT plant back in production.
All Parties involved are arms-length.
Collectively, these Transactions are all part of the
broader TEG Landmark Initiative with the U.S. Department of War (the “
DoW
”)
to Secure America’s Tungsten Supply Chain. The DoW has been supportive in advancing
the Transactions, including completing a NEPA review of Springer.
Earlier today, the DoW announced a US$450 million
investment into TEG, of which US$150 million has been designated as use of
proceeds for the Transactions. This Transaction is intended to solidify the U.S.
tungsten supply chain for primary supply to aerospace and defense contractors
plus support for critical U.S. industrial segments such as Semiconductor,
Energy, Medical and Industrial.
In relation to this Transaction, The Elmet Group has
established Elmet Refining & Trading (ERT) as a new division.
Christian Kargl-Simard, CEO and Director of Blue Moon
states, “This is a great day for the U.S. with regards to providing a major
boost to the U.S. tungsten supply chain. We are very appreciative of the
commitment of all stakeholders to advance Springer as a team. This Transaction,
along with our previously announced acquisition of 33 western U.S. based
tungsten and antimony projects, and our Apex germanium and gallium mine in
Utah, should position Blue Moon as an important name in the domestic industrial
metal supply chain.”
Peter V. Anania, Chairman and CEO of The Elmet Group
states, “We believe this investment represents a significant step forward in
rebuilding a secure, integrated U.S. tungsten supply chain - from domestic
mineral production and processing through the advanced manufacturing
capabilities required by critical U.S. industries and defense applications. By
working in collaboration with Blue Moon and EQ at Springer, we hope to bring
together critical resources, processing expertise, and downstream manufacturing
capabilities to create a more resilient source of tungsten materials for the
United States and its allies. The Elmet Group is proud to help establish and
advance the infrastructure necessary to reduce our reliance on foreign sources
of tungsten while strengthening American manufacturing and national security.”
Craig Bradshaw, Managing Director of EQ Resources states,
“This transaction is transformational for EQR. It delivers a 10% interest in
what will be a significant new APT facility in North America, an eight-year
offtake agreement for 4,000 tonnes of contained WO₃ from our mines, and a
leading role in the engineering and project delivery of the APT plant, all
while validating the ore-sorting technology we have developed across our
operations. Partnering with Blue Moon and The Elmet Group, with the sponsorship
of the U.S. Department of War, cements EQR's position as a important supplier
of this critical mineral and opens a strategic new market for our Australian
and Spanish production.”
Project Investment Details
a)
Tungsten Prepayment Facility (US$50 million).
As part of the Blue Moon Investment, TEG shall provide Blue Moon and its U.S. affiliates (the “
BM Group
”) with a prepayment facility in the aggregate principal amount of US$50 million (the "
Tungsten Prepayment Facility
"), to be funded in two tranches as follows:
i.
Tranche 1:
The first tranche, in the amount of US$25 million ("
Tranche 1
"), shall be funded at the closing of the Tungsten Prepayment Facility, which is expected within forty-five (45) days of today.
ii.
Tranche 2:
The second tranche, in the amount of US$25 million ("
Tranche 2
"), shall be funded upon completion of agreed milestones to be set forth in the definitive agreements, aligned with Blue Moon's readiness covenants relating to the mine, mill/concentrate plant, and flotation circuit, and, if test work is favorable, ore sorting progress. Tranche 2 shall be funded only upon satisfactory completion of the construction milestones applicable to Tranche 1, as mutually determined by the Parties acting reasonably.
Page 2 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
Repayment:
The Tungsten Prepayment Facility shall be repaid through
a twenty-five percent (25%) credit against sales of Springer Concentrate.
b)
TEG Warrants.
In connection with the Tungsten Prepayment Facility, TEG shall, pursuant to exemptions from registration, qualification and/or prospectus requirements under applicable securities laws, grant Blue Moon warrants to acquire common shares of TEG with an aggregate exercise price of US$25 million (the "
TEG Warrants
"), to be issued on the fifth (5th) business day following today. The TEG Warrants shall have a strike price equal to the greater of: (i) the five (5)-day volume-weighted average price (the "
VWAP
") of TEG's shares ending on the fifth business day following today, or (ii) the Nasdaq minimum price under Nasdaq Rule 5635. The TEG Warrants shall have a term of three (3) years from the date of issuance and shall not be exercisable during the six (6)-month period following issuance.
c)
Equity Subscription.
TEG shall subscribe for and purchase US$25 million of new equity in Blue Moon, pursuant to exemptions from registration, qualification and/or prospectus requirements under applicable securities laws, within forty-five (45) days of the Announcement Date (the "
Equity Subscription
"), consisting of 3,500,000 units of Blue Moon (each, a "
Unit
") at a price of C$10.00 per Unit or a 31.8% premium to the closing price of Blue Moon on September 11. Each Unit shall be made up of one (1) common share of Blue Moon (each a "
Unit Share
") and one (1) common share purchase warrant (each, a "
Warrant
"). Each Warrant shall entitle the holder thereof to purchase one (1) additional common share of Blue Moon (each, a "
Warrant Share
"). Subject to the approval of the TSXV, the exercise price of each Warrant Share shall be C$10.80. The Warrants shall be exercisable for a period of three (3) years following the closing of the Equity Subscription.
d)
JV Investment.
US$75 million capital injection into the APT plant by TEG. Equity ownership interests in the JV Entity shall be allocated as follows post investment: TEG – 70%, Blue Moon – 20% and EQ – 10%. TEG will operate the APT plant. Blue Moon's initial capital contribution to the JV Entity shall consist of the APT Plant and associated infrastructure along with its off-take commitment as outlined below.
Proceeds of the Blue Moon Investment shall be limited to
use solely in connection with the Springer Project, with all mine and mill
proceeds earmarked for tungsten development purposes only.
Completion of the Transactions described herein is
subject to receipt of, among other things, acceptable due diligence results for
any non-equity deal components; all requisite approvals of the TSXV and other
regulatory authorities; and approval, execution and delivery of the required
definitive agreements. Within 45 days, TEG is expected to close on a US$50
million investment in the BM Group as defined below, half of which is the
Equity Subscription and half of which is the Tranche 1 investment.
Blue Moon and TEG shall enter into a mutually agreed
investor rights agreement (the "
Investor Rights Agreement
")
providing TEG with customary pro-rata equity participation rights in future
Blue Moon financings and a board seat upon completion of the Equity Financing.
JV Investment and Off-take Mechanics
Under the currently contemplated terms of the
Transaction, BM Group shall maintain complete ownership and operation of the
mine and mill at the Springer Project, including holding all permits to operate
at the site. The BM Group shall retain ownership of certain ancillary assets on
behalf of the JV Entity, including but not limited to utilities
interconnections, water rights, and tailings facilities. A site master plan
will be entered into by the JV entity, covering aspects such as real estate and
access, concentrate receiving, production and shipping, development of solar
and natural gas power facilities and other expansions, laboratory, utilities,
and waste/tailings with a capital recovery costs and site wide water rights.
Page 3 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
APT production is anticipated to be phased as follows on
the Springer site:
1.
Phase 1 APT (“
Phase 1 APT
”) shall target 4,000 tons of APT production capacity per year including infrastructure for blue tungsten oxide ("
BTO
") capacity and an additional leaching line.
2.
Subsequent phased expansions of the APT Plant’s production capacity shall be driven by demand and the need to support Blue Moon’s mine concentrate production,
EQ’s
current and new mines concentrate production and other new mines (including
EQ's
mines), funded pro-rata among the Parties after Phase 1 APT is completed (assuming less than US$100 million capital cost).
Sourcing of concentrate for the APT plant, and off-takes,
are expected to be as follows:
a)
TEG Years 1-5: The JV Entity will allocate up to 75% of input volume to Springer Project production annually. If Blue Moon lacks sufficient production to fill this threshold, TEG may source material from other offtake agreements to which it is a party (entered into at the request of, and with support from, DoW).
b)
EQ Years 1-5: Subject to a cap of 1,000 tons of production capacity per year, the JV Entity will allocate 25% of input volume to EQ concentrate annually. If EQ production is insufficient to provide 25% of the APT Plant input capacity annualized or if EQ does not take its allocation annually, any unused volume shall be available to tungsten concentrates produced from the Springer Mine (“
Springer Concentrate
”) and/or the third-party sourcing described in (a) above.
c)
After Year 5: Blue Moon shall be granted a proportional “most-favored-nation” right to the APT Plant capacity for 90% of the capacity, with EQ having 10%.
d)
Blue Moon Offtake: The JV Entity will enter into an agreement for the right to 100% offtake of Springer Concentrate, so long as the JV Entity has the capacity to process 100% of the Springer Concentrate. Any excess Springer Concentrate will be placed by the JV Entity by best possible process.
e)
EQ Offtake: The JV Entity and EQ shall enter into an off-take agreement for 4,000
tonnes
of WO
3
contained in EQ concentrate over an eight (8) year period commencing upon APT Plant commissioning (the “
EQ Offtake Agreement
”).
Blue Moon shall sell the Springer Concentrate to the JV
Entity at the same pricing terms that EQ receives for its offtake into the APT
Plant pursuant to the EQ Offtake Agreement. Until commercial production is
achieved at the APT Plant, the JV Entity shall sell the Springer Concentrate
into the open market, with best efforts by all Parties to place volumes into
the market to mutually agreed upon facilities at the best possible price.
Separately, EQ is completing preliminary ore sorting work
at the Springer mill using its proprietary technology. Initial results have
been positive, with further test work recommended. Pending the outcome of the
additional test work, it is the intention of all Parties to install ore sorting
at the Springer mill.
Other aspects of the JV Entity include supermajority
rights on certain decisions standard for joint venture arrangements,
operatorship requirements, cross-party security, step-in rights and remedies,
standard dispute mechanisms and ordinary representation and warranties for such
a transaction. Blue Moon also has certain minimum delivery requirements into
the APT plant, which if they cannot be cured, could mean cancellation of the
Blue Moon Offtake.
The Parties have third-party legal representation for
Blue Moon at Bennett Jones LLP, TEG at Ellenoff Grossman & Schole LLP, and
EQ at
Sidley Austin LLP.
Qualified Persons
The technical and scientific information of
this news release has been reviewed and approved by Mr. Reza Ehsani, P.Eng., a
Blue Moon Officer as SVP Projects, and a non-Independent Qualified Person, as
defined by NI 43-101.
Page 4 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
About Blue Moon
Blue Moon is advancing 5 brownfield
polymetallic projects, including the Nussir copper-gold-silver project in
Norway, the NSG copper-zinc-gold-silver project in Norway, the Blue Moon
zinc-gold-silver-copper project in the United States, the Springer
tungsten-molybdenum project in the United States and the Apex
germanium-gallium-copper project in the United States
. All 5 projects are well located with
existing local infrastructure including roads, power and historical infrastructure.
Zinc, copper and tungsten are currently on the USGS and EU list of metals
critical to the global economy and national security and germanium and gallium
are also on the USGS list of critical metals. Major shareholders include Teck
Resources Limited, funds managed by Oaktree Capital Management, Hartree
Partners LP, Wheaton Precious Metals, Altius Minerals Corporation, Baker Steel
Resources Trust, LNS and Monial. More information is available on the Company’s
website (
www.bluemoonmetals.com
).
About The Elmet Group
The Elmet Group is a U.S.-based
provider of precision-engineered components and advanced high-energy systems
for the Aerospace, Defense and Government, Industrial, Medical, Semiconductor
and Electronics, and Energy industries. TEG operates through three segments,
Critical Materials Components (CMC), Engineered Microwave Products (EMP), and
Elmet Refining & Trading (ERT), leveraging materials science and precision
engineering expertise to deliver high-performance solutions. The Elmet Group is
dedicated to strengthening domestic manufacturing capabilities to support the
U.S. and its allies’ needs in both critical materials and advanced high-power
microwave systems.
About EQ Resources
EQ Resources Limited is a leading
global tungsten mining company dedicated to sustainable mining and processing
practices. EQ is listed on the Australian Securities Exchange, with a focus on
expanding its world-class tungsten assets at Mt Carbine in North Queensland
(Australia) and at Barruecopardo in the Salamanca Province (Spain). EQ
leverages advanced minerals processing technology and unexploited resources
across multiple jurisdictions, with the aim of being a globally leading
supplier of the critical mineral, tungsten. EQ aims to create shareholder value
through the exploration and development of its current project portfolio whilst
continuing to evaluate corporate and exploration opportunities within the new
economy and critical minerals sector globally.
For further
information:
Blue Moon Metals
Inc.
Christian Kargl-Simard
CEO
and Director
Phone: (416) 230-3440
Email:
christian@bluemoonmetals.com
Neither TSX
Venture Exchange nor its Regulation Services Provider (as that term is defined
in policies of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.
Page 5 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
CAUTIONARY DISCLAIMER - FORWARD LOOKING
STATEMENTS
This news release contains forward-looking
statements and forward-looking information (collectively "forward-looking
information") within the meaning of applicable Canadian and United States
securities laws. All statements included herein, other than statements of
historical fact, may be forward-looking information and such information
involves various risks and uncertainties. Forward-looking information is often,
but not always, identified by the use of words such as "seek",
"anticipate", "plan", "continue",
"estimate", "expect", "may", "will",
"project", "predict", "potential",
"targeting", "intend", "could",
"might", "should", "believe" and similar
expressions.
Without limiting the generality of the
foregoing, this news release contains forward-looking information pertaining to
the following: the completion of the Transactions, the expected benefits and
synergies from the Transactions; and other matters ancillary or incidental to
the foregoing.
A number of risks, uncertainties and other
factors could cause actual results and events to differ materially from those
expressed or implied in the forward-looking information or could cause the
Company's current objectives, strategies and intentions to change. These risks
and uncertainties include but are not limited to: the inability of Blue Moon to
complete and integrate the Transaction; risks associated with the integration
of Springer project operations; risks associated with mining operations in Nevada;
regulatory and permitting risks at the state and federal level including with
respect to the development of Springer; and management’s ability to anticipate
and manage the factors and risks referred to herein. A comprehensive discussion
of other risks that impact Blue Moon can also be found in its public reports
and filings which are available at
www.sedarplus.ca
and on the
website of the U.S. Securities and Exchange Commission at
www.sec.gov
.
The forward-looking information is based on
certain key expectations and assumptions made by Blue Moon’s management,
including but not limited to: expectations concerning prevailing commodity
prices; the ability to obtain, renew and extend permits as required; estimates
of reserves and resources at Springer; potential volumes of production tied to
Springer; availability of utilities; and the execution at Springer.
Any forward-looking information contained in
this news release represents management's current expectations and is based on
information currently available to management and is subject to change after
the date of this news release. Accordingly, the Company warns investors to
exercise caution when considering statements containing forward-looking
information and that it would be unreasonable to rely on such statements as
creating legal rights regarding the Company's future results or plans.
The Company cannot guarantee that any
forward-looking information will materialize and readers are cautioned not to
place undue reliance on this forward-looking information. Except as required by
applicable securities laws, the Company is under no obligation to update or
revise any forward-looking information, whether as a result of new information,
future events or otherwise, except as expressly required by law. All of the
forward-looking information in this news release is qualified by the cautionary
statements herein.
Page 6 of 6
----- MainDocument.htm -----
6-K
1
MainDocument.htm
6-K
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of September 2026
Commission File Number:
001-43058
BLUE MOON METALS INC.
(Translation of registrant’s name into English)
220 Bay Street, Suite 550, Toronto, Ontario, M5J 2W4 Canada
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annu
al reports under cover of Form 20-F or Form 40-F.
Form 20-F
Form 40-F
DOCUMENTS INCLUDED AS PART OF THIS FORM 6-K
On September 14 2026, the Registrant filed with the Canadian Securities Regulatory Authorities on the System for Electronic D
ata Analysis and Retrieval + a press release, a copy of which is attached hereto as Exhibit 99.1, and which is incorporated herein by reference.
The inclusion of any website address herein, including in any exhibit attached hereto, is intended to be an inactive textual reference only and not an active hyperlink. The information contained in, or that can be accessed through, each such website is not part of this Form 6-K nor is it incorporated herein.
See “Exhibits” below.
Exhibits
Exhibit
Number
Description
99.1
Press release dated September 14, 2026
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
BLUE MOON METALS INC.
By:
/s/ Frances Kwong
Name:
Frances Kwong
Title:
Chief Financial Officer and Corporate Secretary
Date: September 14, 2026
EX-99.1
2
ex991_1.htm
EXHIBIT 99.1
Exhibit 99.1
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
Blue Moon, The Elmet Group, and EQ Resources Announce a US$150-$175 Million Investment into the Springer Tungsten Complex, Nevada, to Strengthen the U.S. Tungsten Supply Chain
TORONTO, Ontario, September 14, 2026
–
Blue Moon Metals
Inc.
(“
Blue Moon
” or the “
Company
”) (
TSXV: MOON
;
NASDAQ:
BMM
),
along with The Elmet Group Co. (“
Elmet
” or “
TEG
”)
(
NASDAQ: ELMT
), and EQ Resources Limited (“
EQ
”) (
ASX: EQR
)
(together the “
Parties
” or “
Party
”), are pleased to announce
signing a binding letter agreement dated September 11, 2026 regarding a series
of strategic transactions intended to unlock the value of Blue Moon’s Springer
Tungsten Complex (“
Springer
”), located in Imlay, Nevada.
Springer historically was one of the largest tungsten
mines in the United States, and consisting of open pit and underground mines, a
1,200 Tpd mill and an Ammonium Paratungstate (“
APT
”) plant capable of
potentially producing up to 4,000 Tpa (collectively, the “
Springer Project
”).
The facility is permitted for construction and received approval of its bonding
requirements from the State of Nevada to start construction and redevelopment
of the mine on August 20, 2026.
The facility is largely on fee lands, and contains a historical
mineral resource from General Electric and Utah International Inc. of 10.7 MT
of 0.45% WO
3
based on historical data and reports prepared by the
prior operators in 1984, as well as access to water, electricity, natural gas
and tailings capacity and is a few miles away from the Union Pacific rail-line
and the I-80 highway. The Company has not completed the work necessary to have
the historical mineral resource estimate verified by a QP. The Company is not
treating the estimate as a current NI 43-101 defined resource and the
historical resource estimate should not be relied upon. Further drilling this
year and next year will be used to update the resource estimate, which will
subsequently be reported in accordance with NI 43-101 standards. On September 3,
2026, Blue Moon acquired additional water rights and land to access the Union
Pacific rail-line, with the potential to install a load-on/out facility.
Figure 1: The Springer Project
Blue Moon has previously indicated the Springer mine and
mill are expected to be back in production in Q4-2027, and the APT plant is
expected to be restarted 2H-2028, which will be potentially the first material tungsten
concentrate production in North America and a significant new source of APT for
the U.S. market.
The contemplated transactions include: i) the formation
of a joint venture entity (the “
JV Entity
”) among the Parties to own and
operate the APT Plant (the mine and mill will remain owned by Blue Moon), (ii)
an equity investment by TEG into Blue Moon, (iii) TEG's receipt of board
representation in both Blue Moon and the Springer Project JV Entity; (iv) a
supply agreement for EQ and Blue Moon tungsten concentrate offtakes to the APT
plant at market pricing, (v) a tungsten prepayment facility provided by TEG to
Blue Moon to be repaid through a credit against sales of concentrate from
Springer, and (vi) a site sharing agreement between Blue Moon and the JV
Entity, covering the land, buildings, utilities, water, and services
arrangements between the JV Entity and Blue Moon (collectively, the "
Transactions
").
Page 1 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
The Transactions contemplate a total investment from TEG
of approximately US$150 million, split between, (i) investments in Blue Moon’s
activities at the Springer Site (the "
Blue Moon Investment
");
and (ii) a contribution to the JV Entity (the "
JV Investment
"
and, together with the Blue Moon Investment, the "
Project Investment
").
An additional US$25 million has been set aside by TEG and EQ for additional
standby requirements if needed to place the APT plant back in production.
All Parties involved are arms-length.
Collectively, these Transactions are all part of the
broader TEG Landmark Initiative with the U.S. Department of War (the “
DoW
”)
to Secure America’s Tungsten Supply Chain. The DoW has been supportive in advancing
the Transactions, including completing a NEPA review of Springer.
Earlier today, the DoW announced a US$450 million
investment into TEG, of which US$150 million has been designated as use of
proceeds for the Transactions. This Transaction is intended to solidify the U.S.
tungsten supply chain for primary supply to aerospace and defense contractors
plus support for critical U.S. industrial segments such as Semiconductor,
Energy, Medical and Industrial.
In relation to this Transaction, The Elmet Group has
established Elmet Refining & Trading (ERT) as a new division.
Christian Kargl-Simard, CEO and Director of Blue Moon
states, “This is a great day for the U.S. with regards to providing a major
boost to the U.S. tungsten supply chain. We are very appreciative of the
commitment of all stakeholders to advance Springer as a team. This Transaction,
along with our previously announced acquisition of 33 western U.S. based
tungsten and antimony projects, and our Apex germanium and gallium mine in
Utah, should position Blue Moon as an important name in the domestic industrial
metal supply chain.”
Peter V. Anania, Chairman and CEO of The Elmet Group
states, “We believe this investment represents a significant step forward in
rebuilding a secure, integrated U.S. tungsten supply chain - from domestic
mineral production and processing through the advanced manufacturing
capabilities required by critical U.S. industries and defense applications. By
working in collaboration with Blue Moon and EQ at Springer, we hope to bring
together critical resources, processing expertise, and downstream manufacturing
capabilities to create a more resilient source of tungsten materials for the
United States and its allies. The Elmet Group is proud to help establish and
advance the infrastructure necessary to reduce our reliance on foreign sources
of tungsten while strengthening American manufacturing and national security.”
Craig Bradshaw, Managing Director of EQ Resources states,
“This transaction is transformational for EQR. It delivers a 10% interest in
what will be a significant new APT facility in North America, an eight-year
offtake agreement for 4,000 tonnes of contained WO₃ from our mines, and a
leading role in the engineering and project delivery of the APT plant, all
while validating the ore-sorting technology we have developed across our
operations. Partnering with Blue Moon and The Elmet Group, with the sponsorship
of the U.S. Department of War, cements EQR's position as a important supplier
of this critical mineral and opens a strategic new market for our Australian
and Spanish production.”
Project Investment Details
a)
Tungsten Prepayment Facility (US$50 million).
As part of the Blue Moon Investment, TEG shall provide Blue Moon and its U.S. affiliates (the “
BM Group
”) with a prepayment facility in the aggregate principal amount of US$50 million (the "
Tungsten Prepayment Facility
"), to be funded in two tranches as follows:
i.
Tranche 1:
The first tranche, in the amount of US$25 million ("
Tranche 1
"), shall be funded at the closing of the Tungsten Prepayment Facility, which is expected within forty-five (45) days of today.
ii.
Tranche 2:
The second tranche, in the amount of US$25 million ("
Tranche 2
"), shall be funded upon completion of agreed milestones to be set forth in the definitive agreements, aligned with Blue Moon's readiness covenants relating to the mine, mill/concentrate plant, and flotation circuit, and, if test work is favorable, ore sorting progress. Tranche 2 shall be funded only upon satisfactory completion of the construction milestones applicable to Tranche 1, as mutually determined by the Parties acting reasonably.
Page 2 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
Repayment:
The Tungsten Prepayment Facility shall be repaid through
a twenty-five percent (25%) credit against sales of Springer Concentrate.
b)
TEG Warrants.
In connection with the Tungsten Prepayment Facility, TEG shall, pursuant to exemptions from registration, qualification and/or prospectus requirements under applicable securities laws, grant Blue Moon warrants to acquire common shares of TEG with an aggregate exercise price of US$25 million (the "
TEG Warrants
"), to be issued on the fifth (5th) business day following today. The TEG Warrants shall have a strike price equal to the greater of: (i) the five (5)-day volume-weighted average price (the "
VWAP
") of TEG's shares ending on the fifth business day following today, or (ii) the Nasdaq minimum price under Nasdaq Rule 5635. The TEG Warrants shall have a term of three (3) years from the date of issuance and shall not be exercisable during the six (6)-month period following issuance.
c)
Equity Subscription.
TEG shall subscribe for and purchase US$25 million of new equity in Blue Moon, pursuant to exemptions from registration, qualification and/or prospectus requirements under applicable securities laws, within forty-five (45) days of the Announcement Date (the "
Equity Subscription
"), consisting of 3,500,000 units of Blue Moon (each, a "
Unit
") at a price of C$10.00 per Unit or a 31.8% premium to the closing price of Blue Moon on September 11. Each Unit shall be made up of one (1) common share of Blue Moon (each a "
Unit Share
") and one (1) common share purchase warrant (each, a "
Warrant
"). Each Warrant shall entitle the holder thereof to purchase one (1) additional common share of Blue Moon (each, a "
Warrant Share
"). Subject to the approval of the TSXV, the exercise price of each Warrant Share shall be C$10.80. The Warrants shall be exercisable for a period of three (3) years following the closing of the Equity Subscription.
d)
JV Investment.
US$75 million capital injection into the APT plant by TEG. Equity ownership interests in the JV Entity shall be allocated as follows post investment: TEG – 70%, Blue Moon – 20% and EQ – 10%. TEG will operate the APT plant. Blue Moon's initial capital contribution to the JV Entity shall consist of the APT Plant and associated infrastructure along with its off-take commitment as outlined below.
Proceeds of the Blue Moon Investment shall be limited to
use solely in connection with the Springer Project, with all mine and mill
proceeds earmarked for tungsten development purposes only.
Completion of the Transactions described herein is
subject to receipt of, among other things, acceptable due diligence results for
any non-equity deal components; all requisite approvals of the TSXV and other
regulatory authorities; and approval, execution and delivery of the required
definitive agreements. Within 45 days, TEG is expected to close on a US$50
million investment in the BM Group as defined below, half of which is the
Equity Subscription and half of which is the Tranche 1 investment.
Blue Moon and TEG shall enter into a mutually agreed
investor rights agreement (the "
Investor Rights Agreement
")
providing TEG with customary pro-rata equity participation rights in future
Blue Moon financings and a board seat upon completion of the Equity Financing.
JV Investment and Off-take Mechanics
Under the currently contemplated terms of the
Transaction, BM Group shall maintain complete ownership and operation of the
mine and mill at the Springer Project, including holding all permits to operate
at the site. The BM Group shall retain ownership of certain ancillary assets on
behalf of the JV Entity, including but not limited to utilities
interconnections, water rights, and tailings facilities. A site master plan
will be entered into by the JV entity, covering aspects such as real estate and
access, concentrate receiving, production and shipping, development of solar
and natural gas power facilities and other expansions, laboratory, utilities,
and waste/tailings with a capital recovery costs and site wide water rights.
Page 3 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
APT production is anticipated to be phased as follows on
the Springer site:
1.
Phase 1 APT (“
Phase 1 APT
”) shall target 4,000 tons of APT production capacity per year including infrastructure for blue tungsten oxide ("
BTO
") capacity and an additional leaching line.
2.
Subsequent phased expansions of the APT Plant’s production capacity shall be driven by demand and the need to support Blue Moon’s mine concentrate production,
EQ’s
current and new mines concentrate production and other new mines (including
EQ's
mines), funded pro-rata among the Parties after Phase 1 APT is completed (assuming less than US$100 million capital cost).
Sourcing of concentrate for the APT plant, and off-takes,
are expected to be as follows:
a)
TEG Years 1-5: The JV Entity will allocate up to 75% of input volume to Springer Project production annually. If Blue Moon lacks sufficient production to fill this threshold, TEG may source material from other offtake agreements to which it is a party (entered into at the request of, and with support from, DoW).
b)
EQ Years 1-5: Subject to a cap of 1,000 tons of production capacity per year, the JV Entity will allocate 25% of input volume to EQ concentrate annually. If EQ production is insufficient to provide 25% of the APT Plant input capacity annualized or if EQ does not take its allocation annually, any unused volume shall be available to tungsten concentrates produced from the Springer Mine (“
Springer Concentrate
”) and/or the third-party sourcing described in (a) above.
c)
After Year 5: Blue Moon shall be granted a proportional “most-favored-nation” right to the APT Plant capacity for 90% of the capacity, with EQ having 10%.
d)
Blue Moon Offtake: The JV Entity will enter into an agreement for the right to 100% offtake of Springer Concentrate, so long as the JV Entity has the capacity to process 100% of the Springer Concentrate. Any excess Springer Concentrate will be placed by the JV Entity by best possible process.
e)
EQ Offtake: The JV Entity and EQ shall enter into an off-take agreement for 4,000
tonnes
of WO
3
contained in EQ concentrate over an eight (8) year period commencing upon APT Plant commissioning (the “
EQ Offtake Agreement
”).
Blue Moon shall sell the Springer Concentrate to the JV
Entity at the same pricing terms that EQ receives for its offtake into the APT
Plant pursuant to the EQ Offtake Agreement. Until commercial production is
achieved at the APT Plant, the JV Entity shall sell the Springer Concentrate
into the open market, with best efforts by all Parties to place volumes into
the market to mutually agreed upon facilities at the best possible price.
Separately, EQ is completing preliminary ore sorting work
at the Springer mill using its proprietary technology. Initial results have
been positive, with further test work recommended. Pending the outcome of the
additional test work, it is the intention of all Parties to install ore sorting
at the Springer mill.
Other aspects of the JV Entity include supermajority
rights on certain decisions standard for joint venture arrangements,
operatorship requirements, cross-party security, step-in rights and remedies,
standard dispute mechanisms and ordinary representation and warranties for such
a transaction. Blue Moon also has certain minimum delivery requirements into
the APT plant, which if they cannot be cured, could mean cancellation of the
Blue Moon Offtake.
The Parties have third-party legal representation for
Blue Moon at Bennett Jones LLP, TEG at Ellenoff Grossman & Schole LLP, and
EQ at
Sidley Austin LLP.
Qualified Persons
The technical and scientific information of
this news release has been reviewed and approved by Mr. Reza Ehsani, P.Eng., a
Blue Moon Officer as SVP Projects, and a non-Independent Qualified Person, as
defined by NI 43-101.
Page 4 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
About Blue Moon
Blue Moon is advancing 5 brownfield
polymetallic projects, including the Nussir copper-gold-silver project in
Norway, the NSG copper-zinc-gold-silver project in Norway, the Blue Moon
zinc-gold-silver-copper project in the United States, the Springer
tungsten-molybdenum project in the United States and the Apex
germanium-gallium-copper project in the United States
. All 5 projects are well located with
existing local infrastructure including roads, power and historical infrastructure.
Zinc, copper and tungsten are currently on the USGS and EU list of metals
critical to the global economy and national security and germanium and gallium
are also on the USGS list of critical metals. Major shareholders include Teck
Resources Limited, funds managed by Oaktree Capital Management, Hartree
Partners LP, Wheaton Precious Metals, Altius Minerals Corporation, Baker Steel
Resources Trust, LNS and Monial. More information is available on the Company’s
website (
www.bluemoonmetals.com
).
About The Elmet Group
The Elmet Group is a U.S.-based
provider of precision-engineered components and advanced high-energy systems
for the Aerospace, Defense and Government, Industrial, Medical, Semiconductor
and Electronics, and Energy industries. TEG operates through three segments,
Critical Materials Components (CMC), Engineered Microwave Products (EMP), and
Elmet Refining & Trading (ERT), leveraging materials science and precision
engineering expertise to deliver high-performance solutions. The Elmet Group is
dedicated to strengthening domestic manufacturing capabilities to support the
U.S. and its allies’ needs in both critical materials and advanced high-power
microwave systems.
About EQ Resources
EQ Resources Limited is a leading
global tungsten mining company dedicated to sustainable mining and processing
practices. EQ is listed on the Australian Securities Exchange, with a focus on
expanding its world-class tungsten assets at Mt Carbine in North Queensland
(Australia) and at Barruecopardo in the Salamanca Province (Spain). EQ
leverages advanced minerals processing technology and unexploited resources
across multiple jurisdictions, with the aim of being a globally leading
supplier of the critical mineral, tungsten. EQ aims to create shareholder value
through the exploration and development of its current project portfolio whilst
continuing to evaluate corporate and exploration opportunities within the new
economy and critical minerals sector globally.
For further
information:
Blue Moon Metals
Inc.
Christian Kargl-Simard
CEO
and Director
Phone: (416) 230-3440
Email:
christian@bluemoonmetals.com
Neither TSX
Venture Exchange nor its Regulation Services Provider (as that term is defined
in policies of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.
Page 5 of 6
Date:
News Release:
Ticker Symbols:
September
14
, 2026
26-32
TSXV: MOON; NASDAQ: BMM
CAUTIONARY DISCLAIMER - FORWARD LOOKING
STATEMENTS
This news release contains forward-looking
statements and forward-looking information (collectively "forward-looking
information") within the meaning of applicable Canadian and United States
securities laws. All statements included herein, other than statements of
historical fact, may be forward-looking information and such information
involves various risks and uncertainties. Forward-looking information is often,
but not always, identified by the use of words such as "seek",
"anticipate", "plan", "continue",
"estimate", "expect", "may", "will",
"project", "predict", "potential",
"targeting", "intend", "could",
"might", "should", "believe" and similar
expressions.
Without limiting the generality of the
foregoing, this news release contains forward-looking information pertaining to
the following: the completion of the Transactions, the expected benefits and
synergies from the Transactions; and other matters ancillary or incidental to
the foregoing.
A number of risks, uncertainties and other
factors could cause actual results and events to differ materially from those
expressed or implied in the forward-looking information or could cause the
Company's current objectives, strategies and intentions to change. These risks
and uncertainties include but are not limited to: the inability of Blue Moon to
complete and integrate the Transaction; risks associated with the integration
of Springer project operations; risks associated with mining operations in Nevada;
regulatory and permitting risks at the state and federal level including with
respect to the development of Springer; and management’s ability to anticipate
and manage the factors and risks referred to herein. A comprehensive discussion
of other risks that impact Blue Moon can also be found in its public reports
and filings which are available at
www.sedarplus.ca
and on the
website of the U.S. Securities and Exchange Commission at
www.sec.gov
.
The forward-looking information is based on
certain key expectations and assumptions made by Blue Moon’s management,
including but not limited to: expectations concerning prevailing commodity
prices; the ability to obtain, renew and extend permits as required; estimates
of reserves and resources at Springer; potential volumes of production tied to
Springer; availability of utilities; and the execution at Springer.
Any forward-looking information contained in
this news release represents management's current expectations and is based on
information currently available to management and is subject to change after
the date of this news release. Accordingly, the Company warns investors to
exercise caution when considering statements containing forward-looking
information and that it would be unreasonable to rely on such statements as
creating legal rights regarding the Company's future results or plans.
The Company cannot guarantee that any
forward-looking information will materialize and readers are cautioned not to
place undue reliance on this forward-looking information. Except as required by
applicable securities laws, the Company is under no obligation to update or
revise any forward-looking information, whether as a result of new information,
future events or otherwise, except as expressly required by law. All of the
forward-looking information in this news release is qualified by the cautionary
statements herein.
Page 6 of 6
----- MainDocument.htm -----
6-K
1
MainDocument.htm
6-K
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of September 2026
Commission File Number:
001-43058
BLUE MOON METALS INC.
(Translation of registrant’s name into English)
220 Bay Street, Suite 550, Toronto, Ontario, M5J 2W4 Canada
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annu
al reports under cover of Form 20-F or Form 40-F.
Form 20-F
Form 40-F
DOCUMENTS INCLUDED AS PART OF THIS FORM 6-K
On September 14 2026, the Registrant filed with the Canadian Securities Regulatory Authorities on the System for Electronic D
ata Analysis and Retrieval + a press release, a copy of which is attached hereto as Exhibit 99.1, and which is incorporated herein by reference.
The inclusion of any website address herein, including in any exhibit attached hereto, is intended to be an inactive textual reference only and not an active hyperlink. The information contained in, or that can be accessed through, each such website is not part of this Form 6-K nor is it incorporated herein.
See “Exhibits” below.
Exhibits
Exhibit
Number
Description
99.1
Press release dated September 14, 2026
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
BLUE MOON METALS INC.
By:
/s/ Frances Kwong
Name:
Frances Kwong
Title:
Chief Financial Officer and Corporate Secretary
Date: September 14, 2026
决策记录链 · 只追加
每次领取产生一条记录,重新决策追加一条并以 supersedes 指向被替代的记录(ADR 0014)。
这条决策早于决策账本(2026-10-08 起逐条追加),没有追加记录。